Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Mechanical Engineering & Automation》 2004-04
Add to Favorite Get Latest Update

Quality Control on Building the Adiabatic Cyclone CFBB

YAN Dong,FAN Yan-jun,LI Gui-liang(Taiyuan Boiler(Group)Company Ltd.,Taiyuan 030021,China)  
Special requirements on the furnace for the CFBB are mainly the follows:In the CFBB the worst working surrounds existed on the emulsion zone of the furnace,and needing to pour on the nonclinkering and the microcontraction wear-resisting refractory pouring material. At the same time the dimension of the return valve is very strict and its geometric figure is very complex, so it must be finished pouring. And because of the high gas temperature and gas flow inside the separator, so it needs the high wear-resisting strength on the refractory and the stability on the heating shatter,and needs to guarantee the building quality.
【CateGory Index】: TK229.6
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 DU Chao-bo, GAO Jian-qiang, WANG Yin-songDepartment of Automation, North China Electric Power University, Baoding 071003, China;The Axial Voidage Profiles in Large-scale Circulating Fluidized Bed Boiler[J];Boiler Technology;2004-05
2 TANG Yong-ping (Zunyi Chloro-alkai Co.Ltd,Zunyi 563004,China);CFB Boiler Operation Regulation in Chloro-alkai Enterprise[J];Industrial Boiler;2010-02
3 LIAO Yu,DENG Yu-sheng,WU Xiao-lan(MPCC Power Plant,Maoming,Guangdong 525021,China);Impact of Fuel Coal Quality on Operation of Circulating Fluidized Bed Boiler[J];Guangdong Electric Power;2010-03
4 CHEN Hong-wei~1,SHI Yang~1,LI De-yu~2,LIU Huan-zhi~1,WEI Ri-Guang~1,YIN Ping~1(1.MOE's Key Lab of Condition Monitoring and Control of Power Plant Equipment, North China Electric Power University,Baoding 071003,China;2.Tianjin Chentang Cogeneration Power Co.,Ltd.,Tianjin 300223,China);Prediction and Experiment Verification of Pressure Drop of Gas-Solid Two-phase Flow in the Riser of CFB[J];Journal of Chinese Society of Power Engineering;2010-07
5 ZHANG Rui,ZHAO XuJinan Boiler Group Co.Ltd.,Jinan 250023,China;Cause Analysis on Abnormal Operation of a CFB Boiler Back-feeder[J];Power Equipment;2010-04
6 ;Research of Energy Conservation Technology to Large Scale Circulating Fluidized Bed Boiler[J];Inner Mongolia Electric Power;2010-03
7 DNEG YushengMaoming Petroleum-Chemical Power Plant,Maoming 525000,Guangdong Province,PRC;ANALYSIS OF MIXEDLY BURNING PETROLEUM COKE TECHNOLOGY IN CFB BOILER[J];Thermal Power Generation;2010-04
8 MAO Xiao-fei,YIN Xing-lan,XING Shuang-xi(Jiangxi Province Electric Power Test Research Institute,Nanchang 330096,China);Problems analysis during the cold test of the domestic large CFB boiler[J];Electric Power;2010-02
9 Hou Xiangsong(Utilities Engineering Department of CISDI Engineering Co.Ltd.,MCC,Chongqing,400013,China);The Design of Sedimentation Rate for the Combustion Chamber of Electric Furnace[J];Metallurgical Power;2010-03
10 CHEN Hongwei,LIU Huanzhi,LI Xiaowei,GAO Jianqiang,WEI Riguang,SHI Yang(Key Laboratory of Condition Monitoring and Control for Power Plant Equipment(North China Electric Power University),Ministry of Education,Baoding 071003,Hebei Province,China);Experimental Research on Solids Circulation Rate in a Double Fluidized Bed and BP Neural Network Prediction[J];Proceedings of the CSEE;2010-32
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved