Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Shenyang Jianzhu University(Natural Science)》 2009-04
Add to Favorite Get Latest Update

Multi-objective Risk Analysis and Documents Assessment of Bridge Construction Based on AHP-GRAY

BAO Longsheng1,LIU Ketong1,YU Ling1,NIU Hong2(1.School of Civil Engineering,Shenyang Jianzhu University,Shenyang China,110068;2.The First Highway Survey and Design Institute of China Co.,LTD,Xi′an China,710075)  
Risk assessment is made in the paper for long span bridge construction and the best construction document by"AHP-GRAY"is determined.The analytic hierarchy process and the grey related analytic method organically is establishesd,and the weight of each factor that influences evaluating indicator using analytic hierarchy process is given.Then we construct each factor comparison sequence and reference sequence,compute the correlation degree,make risk assessment and determine the best construction document for long span bridge.The grey multi-levelled synthesis judgment model can be used to make a good risk assessment and determine correctly the best construction document for Bei san bridge construction.Bridge construction risk analysis method based on "AHP-GRAY" analysis can be carried out to make a variety of risk analysis for long span bridge construction and determine the best construction document.
【Fund】: 建设部科技攻关项目(06-K6-1)
【CateGory Index】: U445.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 QI Tiedong1,CHEN Shaofeng2,3,GAO Weicheng4,LIU Zongren1,SUN Hang2,YANG Xiaosen3(1.School of Civil Engineering,Harbin Institute of Technology,Harbin 150090,China;2.Institute of Communications Science and Engineering,Harbin Institute of Technology,Harbin 150090,China;3.Beijing Laboratory of Earthquake Engineering and Structural Retrofit,Beijing University of Technology,Beijing 100022,China;4.Department of Astronautics and Mechanics,Harbin Institute of Technology,Harbin 150001,China);Construction Control of Long Span Continuous Rigid Frame Bridges Based on Optimum Level of Construction Completion Evaluation[J];Journal of Shenyang Jianzhu University(Natural Science);2007-03
2 YUAN Xuezhong1,GU Fan2 (1.School of Science,Shenyang Jianzhu University,Shenyang China,110168;2.School of Civil Engineering,Shenyang Jianzhu University,Shenyang China,110168);Slope and Displacement of Simply Supported Beam by Superposition Method[J];Journal of Shenyang Jianzhu University(Natural Science);2009-01
3 Sun Fangtian~(1,2) Ma Yitai~1 Li Minxia~1 (1.Tianjin University,Tianjin 300072,China;2.Henan Polytechnic University,Jiaozuo 454000,China);COMPREHENSIVE EVALUATION OF WATER HEATER BASED ON THE GREY-ANALYTIC HIERARCHY THEORY[J];Acta Energiae Solaris Sinica;2008-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LI Jing-long,LI Shu-cai,LI Shu-chen(Research Center of Geotechnical and Structural Engineering,Shandong University,Jinan 250061,China);Study on Risk Analysis Methods for Underground Projects[J];Chinese Journal of Underground Space and Engineering;2008-05
2 CHEN Zhi-hua~1,YU Hai-feng~2(1.Engineering College of Shanxi University,Taiyuan 030013,China;2.Coastal Real Estate Investment(China) Limited Company,Sengzhen 518033,China);EPC General Contract Project Risk Management Research[J];Journal of Electric Power;2006-04
3 Xia Qun-tang(The Seventh Engineering Group Co.,Ltd of CREC 450052);Evaluation and Management of Construction Risk[J];Fujian Architecture & Construction;2008-05
4 Liu Dongying,Xie Wenjun;Summary of Risk Analysis and Study Method of Bridge Engineering[J];Urban Roads Bridges & Flood Control;2009-04
5 LI Chang-you,FU He-lin,LI Liang,GUO Ming-xiang(School of Civil and Architectural Engineering,Central South University,Changsha 410075,China);Asseeement of collapse disater during tunnel construction in a underground-water tunnel[J];Journal of Railway Science and Engineering;2009-06
6 ZHONG Yu-ping(National University of Defense Technology,Changsha 410073,China);The Application of Risk Management in General Contract International Hydropower Project[J];Hunan Nonferrous Metals;2006-03
7 SHI Wei,WANG Yong-xiang (School of Civil and Architectural Engineering,East China Jiaotong University,Nanchang 330013);Bidding risk analysis based on equal risk curve and fuzzy comprehensive evaluation method[J];Construction Management Modernization;2009-01
8 LV Feng1,LI Feng-ju1,GUO Song-ying2 (1. School of Management,Chongqing Jiaotong University,Chongqing 400074,China,2. School of Tangshan,Tangshan 063000,China);Tunnel Engineering Risk Identification of a station and extra-large cross-section interval in Chongqing[J];Construction Management Modernization;2009-01
9 JIANG Hua1,2,* WANG Junjie1(1.Department of Bridge Engineering,Tongji University,Shanghai 200092,China;2.Department of Bridge Engineering,Chang'an University,Xi'an 710064,China);Ascertaining Resistance Force of Bridge Components Against Vessel Collision Based on Risk Idea[J];Structural Engineers;2009-03
10 ZHANG Guo-xing, HU Shao-lan(HeBei Institute of Architecture and Civil Engineering, Zhangjiakou 075024);Research on Monitoring Project Risks[J];Optimization of Capital Construction;2005-03
China Proceedings of conference Full-text Database 1 Hits
1 LIU Ren-hui~1 AN Shi~2 (1.School of Management,Harbin Institute of Technology,Harbin 150001,China;2.School of Science and Engineering on Communication,Harbin Institute of Technology,Harbin 150090,China);Project Risk Identification Model based on System Identification[A];[C];2007
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Yijuan (Dean's Office, Beijing 100044);The Warning from the Analysis of Bridge Accident[J];Journal of Beijing Institute of Civil Engineering and Architecture;2003-03
2 DONG\ An-zheng,\ ZHAO\ Guo-fan ( State Key Lab. of Coastal and Offshore Eng., Dalian Univ. of Technol., Dalian 116024, China );Human comfort reliability analysis of tall building under wind loads[J];Journal of Dalian University of Technology;2002-04
3 ZHA Jing-min,JIN En-cheng,WU Yang(Tianjin University,Tianjin 300072,China);The Analysis of the Project Insurance Plans[J];Port Engineering Technology;2004-03
4 LIU Jian cheng,GU Yong ning,HU Zhing qiang(College of Naval Architecture and Ocean Engineering, Shanghai Jiaotong University, Shanghai 200030, China);Response and Damage of Bridge Pier During Ship-Bridge Collision[J];Highway;2002-10
5 GUAN Hong?zhi 1, Kazuo Nishii 2 (1 Beijing Polytechnic University, Beijing 100022,China;2 Yamanashi University, Japan);Study on Estimation of the Time Value in Freight Transport[J];JOURNAL OF HIGHWAY AND TRANSPORTATION RESEACH ANDK DEVELOPMENT;2000-05
6 WANG Haiyang~1,ZHOU Wei~2,WANG YuanQing~3 (1.Research Institute of Highway,Ministry of Communications,Beijing 100088,China; 2.Chinese Academy of Transportation Sciences,Beijing 100029,China;3.Chang'an University,Shaanxi Xi'an 710064,China);Research on Methods for Value of Time Determination for Freight Transport[J];Journal of Highway and Transportation Research and Development;2004-07
7 WANG Hai-yang~1,ZHOU Wei~2,WANG Yuan-qing~3 (1.Research Institute of Highway,Minister of Communications,Beijing100088,China; 2.Chinese Academy of Transportation Sciences,Beijing100029,China; 3.Chang'an University,ShaanxiXi'an710064,China);Research on Methods for Value of Time Determination for Passenger Behavior[J];Journal of Highway and Transportation Research and Development;2004-08
8 DU Peng-juan~1,ZHANG Zhe~2,TAN Su-jie~1(1.Dept.of Civil Eng.and Arch.,Dalian National.Univ.,LiaoningDalian116600,China;2.Bridge inst.,Dalian Univ.of Technol.,LiaoningDalian116024,China);Optimization of Cable Tension in Reasonably Finished State of Cable-Stayed Bridges[J];Journal of Highway and Transportation Research and Development;2005-07
9 Ding Houcheng Wan Chenglue (Wuhan Safety & Environmental Protection Research Institute,China Iron & Steel Industry Trade Group Co. Wuhan 430081);Preliminary Analysis on Value of Risk Assessment Criteria[J];Industrial Safety and Dust Control;2004-10
10 ZHAO Li-ming, WANG Pan ( School of Management, Tianjin University, Tianjin 300072, China );The Research on Travel Cost in the Traffic Network Planning[J];Journal of Hebei University of Technology;2003-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved