Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Railway Standard Design》 2005-04
Add to Favorite Get Latest Update

Main Bridge Design for Highway-Railway Dual-Purpose Bridge in Bingzhou

Shu Mengxue, Wang Weiyu Bridge Survey and Design Institute of CREC, Wuhan 430050  
Yellow River Bridge in Binzhou is a newly constructed highway-railway dual-purpose bridge with main bridge made of five-span one-coupling steel truss. Here we introduce the selection of main bridge style and structure design by considering the Yellow river course, and hydrological, geographical condition.
【CateGory Index】: U448.121
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 ZHAO Zhuo1,WANG Jian2,MENG Lei3,WANG Yong-zhong2(1.College of Civil Engineering,Zhengzhou University,Zhengzhou 450002,China; 2.Henan Provincial Institute of Communications Planning,Survey and Design,Zhengzhou 450052,China; 3.Henan Highway Engineering Consultation Company,Zhengzhou 450002,China);Bridge over Yellow River in Henan Province[J];Henan Science;2006-06
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Guo Zhisheng;Design of Jiamusi Songhuajiang River Extra Large Bridge on Suijia Railway[J];Railway Standard Design;2003-12
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 CAO Cheng-mao1,2, TANG Jian-sheng3(1.Sch of Engin,Anhui Agricultural University,Hefei 230036,China;2.Sch of Manufacturing Engin,Nanjing University of Science & Technology,Nanjing 210094,China;3.Henan Industry Professional Technical Academy,Nanyang 473009,China);Monitoring system for Huanghe Second Bridge-temperature monitoring subsystem[J];Journal of Transducer Technology;2004-09
2 Zhang Kaifeng; Tang Jisun(Southwest Jiaotong University Chengdu 610031);STRUCTURAL SIMULATION FOR ENTIRE BRIDGE AND ITS APPLICATION OF CONTINUOUS TRUSS BRIDGE ON YANGTSE RIVER IN WUHU[J];STEEL CONSTRUCTION;1999-03
3 HU An-xiang~1,CAO San-peng~2,LIU Zhao~2,CHEN Yu-chuan~1(1.CHEC-Wuhan Port Const.Corp.,Wuhan 430014,China;2.The Southeast University,Nanjing 210000,China);Use of Bridge Building Machine with Travelling Shuttering in Building PC Continuous Beams for Bridge Approach of Suzhou-Nantong Bridge[J];China Harbour Engineering;2005-04
4 Liu Dongxu,Zhang Shilin (Henan Provincial Communications Planning, Survey and Design Institute, Zhengzhou, 450052, China);PC Continuous Beam Installed with Prefabricated Segments[J];Highway;2001-09
5 ;静载试验车辆自动加载算法及系统[J];Technocogy of Highway and Transport;2003-06
6 LIU Xiao-hui;Research on Design Scheme of Chongqing Caiyuanba Yangtzew River Bridge[J];Technocogy of Highway and Transport;2004-02
7 CHEN Shu-li1,2 ,SU Mu-biao1,2,SUN Bao-chen1,2 FENG Xiao-li3(1 Structural Health Monitoring and Control Institute, Shijiazhuang Railway Institute,Shijiazhuang; 2 The Key Laboratory of Structural Health Monitoring and Control of Hebei Province,Shijia- zhuang;3North University Garden SiFang School, Shijiazhuang Railway Institute ,Shijiazhuang);Application of Optical Strain Sensor in Long-time Health Monitoring of Wuhu Changjiang River Bridge[J];Optical Communication Technology;2005-11
8 SHI Fu-ming (Henan Provincial Institute of Communications Planning, Survey and Design, Zhengzhou 450052, China);Design Considerations for Segmental Continuous Girder Alternative[J];World Bridges;2004-01
9 HUANG Rong, YANG Zhi-fang (Bridge Construction Sub-headquarters, Shanghai Deepwater Port Construction Headquarters, Shanghai 201306, China);Considerations of Design Optimization of Donghai Bridge[J];World Bridges;2004-S1
10 Wang Wei (Henan Communications Planning Survey and Design Institute);Simple Analysis of the Scheme of Multiple-tower Cable-stayed Bridge of Second Highway Bridge of Zhengzhou Yellow River[J];Science and Technology of Henan Communication;2000-04
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 Song Xin'an(Henan Provincial Communications Planning Survey & Design Institute Co,Ltd,Zhengzhou 450052,China);Overall Design of Luoyang Yellow River Bridge[J];Henan Science;2009-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved