Slurry-Shield Excavations in High Water Pressure in Silty Sand Soils at the Underwater Receiving End

HOU Jianjun;XIAO Minzhao;Sinohydropower Bureau 8 Co.,Ltd.;Wuhan Municipal Construction Engineering Group Co.,Ltd.;  
The construction techniques for the slurry-shielded excavation at the underwater receiving end of the tunnel are introduced in the paper with a case history of the Wuhan Metro Line No.2Project crossing the Yangtze River.The paper emphasizes the key techniques,such as,jet grouting reinforcement,ground freezing reinforcement at the receiving end,backfill of the vertical shaft and the shielded excavation.In Metro Line No.2Project,both the jet grout and the ground freeze are used for the ground improvement and the backfill operation is performed immediately after the excavation reached the end.These new techniques provide examples for resolving the high water pressure difficulties in the shielded excavations.
【CateGory Index】: U455.43
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 4 Hits
1 Jiang Yusheng1 Jiang Hua1,2(1.School of Mechanics and Civil Engineering,China University of Mining and Technology,Beijing 100083; 2.State Key Laboratory for Geomechanics and Deep Underground Engineering,Beijing 100083);Study on Soil Reinforcement for the Launching and Arrival Ends of Large-Diameter EPB Shieldsin Beijing merto[J];Urban Rapid Rail Transit;2013-01
2 WANG Ling?min1,WANG Jin?xing2,LIU Song?ke3(1.Dept.of Frozen Eng.of China Coal Special Eng.Construction Co.,Huaibei 235044,China;2.Dept.of Civil Eng.& Arch.of JIT,Jiaozuo 454000,China;3.Shenhuo Coal & Power Co.Ltd.,Yongcheng 476600,China);<title>Application of soil stabilization method by freezing to shield tunnelling[J];Journal of Jiaozuo Institute of Technology;2002-05
3 LI Yi,ZHONG Zhi-quan;New technology of slurry shield arriving construction[J];Construction Mechanization;2010-01
4 Wang Shejiang(Suzhou Rail Transport Co.,Ltd,Suzhou 215006,China);Construction Technology in Shield-approaching Area in Water-rich Silt Strata[J];Journal of Shijiazhuang Tiedao University(Natural Science);2012-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Cao Hongling(Chian Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China);Thawing Settlement Control of Subway Tunnel Construction by Artificial Ground Freezing[J];Chinese Journal of Underground Space and Engineering;2010-02
2 Li Pan1,2,Xie Xiongyao1,2(1.Department of Geotechnical Engineering,School of Civil Engineering,Tongji University,Shanghai 200092, China;2.Key Laboratory of Geotechnical Engineering,Tongji University,Shanghai 200092,China);Research on Optimization of Freezing-temperature Monitoring Design and Method of Data Analysis in Shanghai Yangtze River Tunnel[J];Chinese Journal of Underground Space and Engineering;2012-01
3 XIAO Zhao-yun (Huaqiao University,Xiamen 362021)HU Xiang-dong (Tongji University,Key Laboratry of Geotechnical and Underground Engineering of Ministry of Education(Tongji University),Shanghai 200092);Field Measurement Analysis of Natural Thawing and Artificial Thawing of Frozen Soil by Artificial Ground Freezing[J];Journal of Yangtze University(Natural Science Edition) Sci & Eng V;2009-03
4 DING Chang-xin,QU Ji-li (College of Urban Construction and Environmental Engineering,University of Shanghai for Science and Technology,Shanghai 200093,China);APPLICATION OF SOIL FREEZING REINFORCEMENT METHOD TO SHIELD TUNNELING ENTRY[J];Low Temperature Architecture Technology;2009-08
5 FAN Shu-fang1 ZHU Ku-zhu1 FAN You-jun2(1.Guilin University of Technology,College of Civil and Architectural Engineering,Guilin 541004,China;2.Gansu Province Geological Prospecting Bureau of Hydrogeology and Engineering Geology Exploration Institute,Zhangye 734000,China);Construction Technology of Triple-Tube High Pressure Rotary-Jet Pile in a Shield Tunnel[J];Construction Quality;2010-07
6 Lu Lishun;Shanghai Urban Construction Municipal Engineering(Group) Co.Ltd.;;The Disposal of EPB Shield Cutter-head Driving Predicament owing to Reinforced Soil in Stratum[J];Chinese Journal of Underground Space and Engineering;2014-01
7 QIN Yi-xiong1, HU Xiang-dong2,3, SHANG Xin-min4, XIAO Chao-yun2,3 (1. Zhong Mei Teshu Sinking Group, Shanghai 200023; 2. Department of Geotechinal Engineering, Tongji University, Shanghai 200092; 3. Key Laboratory of Geotechnical and Underground Engineering, Tongji University, Shanghai 200092; 4. Taiwan Junchi Engineering Ltd., Taipei);Application of Artificial Ground Freezing Method in underground construction in Shanghai[J];Tunnel Construction;2007-S2
8 CHEN Shandong(Guangdong China Tunnel Construction Co.,Ltd.,Guangzhou 510635,China);Analysis on Application of Steel Sleeves in Shield Arrivals[J];Tunnel Construction;2010-04
9 CHU Yanpo1,ZHU Bangyong2,ZHANG Yingjun2,XU Guoqing2(1.Chemical Industry Geotechnical Engineering Co.,Ltd.,Nanjing 210044,China;2.China University of Mining and Technology,Xuzhou 221008,Jiangsu,China);Application of Freezing Method in Recovery of River-crossing Tunnel[J];Tunnel Construction;2010-05
10 ZHANG Zhi,ZHANG Yong,LU Lu,ZHENG Pengsheng (School of Mechanics and Civil Engineering,CUMT,Xuzhou 221008,Jiangsu,China);Application of Freezing Method in Construction of Connection Galleries of Metro Works in Intensely-disturbed Ground[J];Tunnel Construction;2011-01
China Proceedings of conference Full-text Database 3 Hits
1 QIN Yi-xiong~1 HU Xiang-dong~(2,3)SHANG Xin-min~4 XIAO Chao-yun~(2,3) 1.Zhong Mei Teshu Sinking Group,Shanghai 200023; 2.Department of Geotechinal Engineering,Tongji University,Shanghai 200092; 3.Key Laboratory of Geotechnical and Underground Engineering,Tongfi University,Shanghai 200092; 4.Taiwan Junchi Engineering Ltd.,Taipei;Application of Artificial Ground Freezing Method in underground construction in Shanghai[A];[C];2007
2 Jiang Yusheng,Chen Zhiqiang,Jiang Hua,Zhu Xiurong;Major Risk Factor Analysis of Shield Receiving Construction[A];[C];2011
3 Tan Jinghui;;Application of Reinforcement Technology by Steel Casing in Shield Receiving Pit[A];[C];2014
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 WU Tao~1 WEI Liang-wen~2 ZHANG Qing-he~2 (1.Shanghai Construction Engineering Administration CO.,LTD,Shanghai 200031,China;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092,China);Research on Stability of Reinforced Soil at Large Scale Shield Departure Area[J];Chinese Journal of Underground Space and Engineering;2008-03
2 Zhang Qinghe et al.;A Study on Tunneling Technology with Access to Tunnel for Shield[J];;1994-02
3 LUO FuRong①② JIANG Yusheng③ JIANG Hua③(①School of Civil Engineering,Beijing Jiao tong University,Beijing 100044)(②Beijing MTR Construction Administration Corporation,Beijing 100037)(③School of Mechanics and Civil Engineering,China University of Mining & Technology,Beijing 100083);THEORETICAL MODELING and Sensitivity analysis OF IMPROVED Sandy STRATA AT TBM PORTAL AREAS with STRENGTH AND STABILITY THEORIES[J];Journal of Engineering Geology;2011-03
4 KANG Bao-sheng,CHEN Kui,LI Rong-zhi;Beginning and end construction technology with shield machine in Nanjing subway engineering[J];Construction Mechanization;2004-02
5 Tang Yong,Liu Wei (China Tunnel Construction Co. ,Ltd. in Guangdong,Guangzhou,Guangdong 510500,China);Application of Closed Shield Receiver in Guangzhou Metro[J];Construction Technology;2010-05
6 Luo Weicai(China Railway 22nd Bureau Group Co.,Ltd.,Beijing 100043,China);Research on Grouting Construction Technology in Water-rich Sandy Stratum of Xiang'an Subsea Tunnel in Xiamen[J];Journal of Shijiazhuang Railway Institute(Natural Science);2008-01
7 Wang Pengcheng(The 2nd Engineering Co.Ltd.of the 12 th China Railway Bureau Group,Taiyuan 030032,China);Detour Construction Method of Water-rich& Karst Tunnel[J];Journal of Shijiazhuang Railway Institute(Natural Science);2009-02
8 LI Da-yong, WANG Hui, WANG Teng School of Civil Engineering, Shandong University ofScience & Technology; Guangzhou Subway Design and Research Institute; Department of Gentechincal Engineering, Tongji University;ANALYSIS OF SOIL REINFORCEMENT FOR THE STARTING AND ARRIVING OF SHIELD MACHINE IN METRO CONSTRUCTION[J];Journal of Railway Engineering Society;2006-01
9 YI Hong-wei 1, SUN Jun 2 (1.Shanghai Xincheng Industry General Co., Shanghai 201100, China; 2.Department of Underground Structures and Engineering, Tongji University, Shanghai 200092, China);Mechanism Analysis of Disturbance Caused by Shield Tunnelling on Soft Clays[J];Journal of Tongji University;2000-03
10 Yang Taihua Tengda Construction (Group) Limited Corporation, Shanghai 200122);Key techniques for a large slurry shield to enter and leave the terminal wells for a river-crossing tunnel project[J];Modern Tunnelling Technology;2005-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved