Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Railway Engineering Technology and Economy》 2019-04
Add to Favorite Get Latest Update

Brief Analysis of Construction Organization Design of Xinghuo Station

Xin kun;  
In the design stage of railway construction project,scientifically and reasonably determining the construction organization design scheme can effectively control the project cost and construction period. Taking into full consideration the interference of the cross-construction with the planned subway line and the influence on the normal operation of the existing railway lin,the construction organization design schemes of Xinghuo station is studied and conpared. By reserving the " bench beam" structure,the station building construction is carried out in advance to avoid the influence of cross-construction with subway lines.The step-by-step implementation plan for station building is determined,and the normal operation of existing lines are ensured through several transitions. And it achieves the purpose of ensuring construction period and saving investment.
【CateGory Index】: TU721.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 1 Hits
1 Shan xianghua,Li xiachu,Liang yong et al;Study and Suggestions about Railway Construction Temporary Project Cost[J];铁路工程造价管理;2013-03
【Secondary Citations】
Chinese Journal Full-text Database 7 Hits
1 LIN Bo(China Railway Engineering Consultant Group Co.Ltd,Beijing 100055,China);Discussion on Tendering Strategy and Organization for Railway Survey and Design Project[J];铁道工程学报;2013-05
2 ;优化施工组织设计降低工程造价[J];科技信息;2012-35
3 Sun Tao,Zhang Jianxin,Wang Yongcheng;Foundation pit design and construction under complex environment in soft soil area[J];铁路工程造价管理;2009-05
4 Zhang Wei;Determine the construction period for complex mountain railway in design phase[J];铁路工程造价管理;2009-04
5 Zhao Pengfei~1,Pan Guohua~2,Tang Rongwei~1,Tao Yong~2,Qian Jihong~1Du Yixin~1,Yang Sheng~1,Li Yuelin~1,Guo Zhanyi~2,Song Tao~1(1 China Academy of Building Research,Beijing 100013,China;2 China Railway Siyuan Survey and Design Group Co.,Ltd.,Wuhan 430063,China);Research on the complicated steel structure system of Wuhan railway station[J];建筑结构;2009-01
6 WANG Ming-jie (Chengdu Railway Engineering Contraeting Co., Ltd., Chengdu 610012, China);Problems in the design of tunnel construction organization and the promotion[J];交通科技与经济;2007-06
7 Li Xinmei; Gao Shiqing(Province Traffic Technician School of Guangdong,foshan 528000,China;Shenzhen Tongda Road Bridge Company,Shenzhen 518101,China);Apply VE Excellent Turn In TunnelWork Organization Design[J];价值工程;2004-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved