Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Exploration Engineering(Rock & Soil Drilling and Tunneling)》 2010-01
Add to Favorite Get Latest Update

Analysis on Anchorage Failure in Side Slope Support Construction

XU Jian-jun(1),WANG Jian-guang(2)(1.No.3 Geological Prospecting Team,Henan Bureau of Geology and Mineral Exploration,Luoyang Henan 471023,China;2.No.2 Geological Team,Henan Bureau of Geology and Mineral Exploration,Zhengzhou Henan 450001,China)  
Based on the common failure types in the side slope support construction process,analysis was made on the accident causes and the corresponding preventive and remedial measures were put forward to prevent and reduce the loss from accident.
【CateGory Index】: TU753.8
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 ZHAO Li-ming,PAN Xiao-li,WANG Xiao-hua(Guangxi Guilin Hydrology Engineering Geology Survey Institute,Guilin Guangxi 541002,China);Comprehensive Harnessing Construction Technique for High Side Slope Anchoring of Highway[J];Exploration Engineering(Rock & Soil Drilling and Tunneling);2007-08
2 ZENG Xian-bin1,MAI Rong-qiang2,LIN Si-bo1(1.Guangxi Guilin Institute of Hydrogeological and Engineering Geological Investigation,Guilin Guangxi 541002,China;2.Guangxi Foundation Investigation Engineering Co.Ltd.,Guilin Guangxi 541001,China);Application of Anchor-cable Lattice Beam in Rock Landslide[J];Exploration Engineering(Rock & Soil Drilling and Tunneling);2009-04
3 HUO Yu-xiang,HUANG Run-qiu,JU Neng-pan,ZHAO Jian-jun(State Key Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Technology,Chengdu Sichuan 610059,China);Emergency Treatment of Temporary Slope with High-steep Rocky Cataclastic Structure[J];Exploration Engineering(Rock & Soil Drilling and Tunneling);2009-10
【Co-citations】
Chinese Journal Full-text Database 2 Hits
1 ZHAO Jianjun① TANG Maoying② JU Nengpan① HUO Yuxiang① HUANG Runqiu① (①State Key Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Technology,Chengdu 610059) (②Dadu Hydropower Development CO.,LTD,Chengdu 610041);STUDY ON STABILITY EVALUATION AND SUPPORTING WORK DESIGN FOR HIGH AND STEEP ROCK SLOPE IN MATERIAL DEPOTS[J];Journal of Engineering Geology;2010-04
2 YU Jin-di1,BAO Hong-yan2(1.Zhejiang Investigation and Design Institute of Water Conservancy and Hydropower,Hangzhou,Zhejiang 310002,China;2.Hangzhou Supervising Center of Water Conservancy Facilities,Hangzhou,Zhejiang 310016,China);Application of Framework Anchor in Reinforcement for Mountainous Slope[J];Journal of Water Resources and Architectural Engineering;2011-04
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 JU Nengpan,ZHAO Jianjun,DENG Hui,HUANG Runqiu,DUAN Haipeng(State Key Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Technology,Chengdu 610059,China);Analysis of Deformation Mechanism of Sliding to Bending Slope and Study of Deformation Emergency Control at Huangshan Expressway[J];Advances in Earth Science;2008-05
2 HUANG Runqiu (State Key Laboratory of Geohazard Prevention and Geoenvironment Protection,Chengdu University of Technology, Chengdu,Sichuan 610059,China);GEODYNAMICAL PROCESS AND STABILITY CONTROL OF HIGH ROCK SLOPE DEVELOPMENT[J];Chinese Journal of Rock Mechanics and Engineering;2008-08
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved