Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《China Civil Engineering Journal》 1992-03
Add to Favorite Get Latest Update

CONTROL AND ADJUSTMENT OF GABLE TENSION IN THE CONSTRUCTION OF CABLE-STAYED BRIDGE

Zhong Wanxie;Liu Yuanfang;Ji Zheng Da1ian University of Technology  
In this paper, the concept of the undeformed pretension of cable is intro-duced first. Taking the undeformed pretension as a control variable, a model tosimulate the tension control process is formulated.In construction, that thegirder will gradually separate from the supports is considered by means of thesolution of the problem in optimigation. Study on some practical examples showsthat the present method is both simple and easy to be implemented, leadingthe tension to reach the design state rapidly. The method is also applicable toother construction methods.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 DU Peng-juan~(1,2) ZHANG Zhe~1 TAN Su-jie~2 PENG Yong-heng~2 LI Xinle~2(1.School of Architecture & Civil Engineering,Dalian Nationalities University, Dalian Liaoning 116605,China;2.Bridge Institute,Dalian University of Technology,Dalian Liaoning 116024,China);Optimization of Cable Tension during the Construction for Cable-stayed Bridges[J];Journal of Dalian Nationalities University;2006-05
2 DU Peng-juan TAN Su-jie CUI Jian-yu (School of Architecture & Civil Engineering,Dalian Nationalities University,Dalian Liaoning 116605,China);Application of un-deformed Pretension of Cable for the Design of Cable-Stayed Bridges[J];Journal of Dalian Nationalities University;2007-05
3 Chen Zimin(Dept. of Civil Engineering);An Stepwise Algorithm for Adjusting Cable Tensions in Cable-Stayed Bridges[J];JOURNAL OF DALIAN FISHERIES UNIVERSITY;1994-03
4 DU Peng-juan~1,ZHANG Zhe~2,TAN Su-jie~1(1.Dept.of Civil Eng.and Arch.,Dalian National.Univ.,LiaoningDalian116600,China;2.Bridge inst.,Dalian Univ.of Technol.,LiaoningDalian116024,China);Optimization of Cable Tension in Reasonably Finished State of Cable-Stayed Bridges[J];Journal of Highway and Transportation Research and Development;2005-07
5 Fang Zhi Liu Guangdong Wang Guangliong (Dept uf Civil Engineering, Hunan Univ, 410082 , Changsha, P R China);A Grey Predictive Control System for the Construction of Cable-stayed Bridges[J];Journal of Hunan University (Natural Science);1997-03
6 Guan Wanyi;Han Dajian(Dept. of Civil Eng., South China Unly. of Tech., Guangzhou 510640);PROGRESS IN THE CONSTRUCTION CONTROL METHODSFOR LONG-SPAN CABLE-STAYED BRIDGES[J];JOURNAL OF SOUTH CHINA UNIVERSITY OF TECHNOLOGY(NATURAL SCIENCE);1999-11
7 DU Peng-juan~(1,2),ZHANG Zhe~(*1),LIU Chun-cheng~1,SHI Lei~1(1.Bridge inst., Dalian Univ. of Technol., Dalian 116024, China;2.Dept. of Civil Eng. and Arch., Dalian National. Univ.,Dalian 116600, China);Optimization control method of cable tension during the construction for cable-stayed bridges[J];Chinese Journal of Computational Mechanics;2005-03
8 DU Pengjuan1,2,ZHANG Zhe1,SUN Jiangang2,HUANG Cailiang1(1.Institute of Bridge Engineering,Dalian University of Technology,Dalian 116024,China;2.College of Civil Engineering and Architecture,Dalian Nationalities University,Dalian 116600,China);Research on optimization method of concrete cable-stayed bridges in construction control[J];Journal of Building Structures;2008-S1
9 Xiao Neng-li;ROPE VIBRATION FREQUENCY MEASUREMENT METHOD RESEARCH[J];Building Technique Development;2008-01
10 JIANG Tian-hua 1,2 LIU Jia2 ZHU Hong-bing1 (1. Urban Construction College of Wuhan University of Science and Technology, Wu ha n 430070, China; 2. Civil Engineering and Architecture College of Wuhan Universi ty of Science and Technology, Wuhan 430070, China);Application of self-adaptive Kalman’s filtering method in the construction of cable- stayed bridge[J];Yangtze River;2005-08
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 SUN Yu-ping~1,SHEN Rui-li~1,TANG Mao-lin~1,WU Tan~2, LIU Bao-wen~21.School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China;2.Anhui CTCE Design and Research Institute,Hefei 230000,China;The construction control of tensioning of anchor span strand for erecting suspensio bridges[J];Journal of Chongqing Jiaotong University;2006-06
2 HU Jian-hua1,TANG Mao-lin2,LIU Rong1,WANG Zhong-bin2(1.Hunan Provincial Communications Planning Survey & Design Institute,Hunan Changsha 410008,China;2.Southwest Jiaotong University,Sichuan Chengdu 610031,China);Analysis of Shrinkage and Creep on Self-Anchored Suspension Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2007-05
3 YANG Xuan,ZHOU Shui-xing(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Method to Determine Construction Cable Tension Force of Cable-Stayed Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2008-01
4 CHEN Zhan-rong,LIU Qi,ZHOU Shui-xing(School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);"Two Stage Method" of Cable Tension Optimization for Short/Medium Span Cable-Stayed Bridges[J];Journal of Chongqing Jiaotong University(Natural Science);2008-02
5 ZHANG Yang-yong,WU Wan-zhong,ZHOU Yun-gang(Department of Bridge Engineering,Tongji University,Shanghai 200092,China);Matrix Analysis Method for Precise Simulation of Cable Force of Cable-Stayed Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2009-06
6 ZHAO Yang1,ZHOU Shui-xing1,LIU Jing2(1. School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China;2. Traffic Survey & Design Station of Wushan County in Chongqing,Chongqing 404700,China);Step-by-Step Algorithm of Liner Control of Arch Ribs of CFST Arch Bridges[J];Journal of Chongqing Jiaotong University(Natural Science);2010-01
7 Shu Chunsheng,Wang Xinshun;Cable Capacity Optimization of Rigid-frame-cable-stayed Collaboration System[J];Urban Roads Bridges & Flood Control;2009-07
8 Zhu Xiaoxiu;Application of Forward-analysis Iterative Method in Hanger Rod Stretching of Bowstring Arched Bridge[J];Urban Roads Bridges & Flood Control;2010-01
9 YU Zhi-wu,TAN Sui(School of Civil and Architectural Engineering,Central South University,Changsha 410075,China);Analysis and computation method of structure for the construction control of prestressed concrete bridge[J];Journal of Railway Science and Engineering;2006-06
10 ZHAO Yong-jun (The Fifth Engineering Co.Ltd of China Railway 16th Bureau Group,Tangshan 063000,China);Construction monitoring technology of Wangguanchong bridge in Wuguang passenger dedicated line[J];Journal of Railway Science and Engineering;2010-02
China Proceedings of conference Full-text Database 3 Hits
1 WANG Zhong-bin, SHEN Rui-li, TANG Mao-lin (China Zhongtie Major Reconnaissance & Design Institute Co. Ltd.,Hubai Wuhan, 430050, China; Bridge and Structural Engineering Department, Southwest Jiaotong University.Shichuan Chengdu 610031, China);Together Effect Analysis of the Steel Truss Stiffening Girder-Floor System of Suspension Bridge[A];[C];2006
2 Jiang Ziqin~1,Hu Xiaojuan~2,Ding Jiemin~3 (1.Tongji University,Shanghai 200092,China; 2.Chengdu Jizhun Fangzhong Architectural Design Associates,Chengdu,Sichuan 610017,China; 3.The Architectural Design and Research Institute of Tongji University,Shanghai 200092,China);Impact Analysis of Boundary Condition on Construction Process of Multi-span Continuous Beam String Structure[A];[C];2010
3 Guo Jiamin~1 Dong Shilin ~2 Yuan Xingfei~2 Hou Yongli ~3 Feng Lei~3 (1.Shanghai Maritime University,Shanghai 200135,China;2.Space Structures Research Center, Zhejiang University,Hangzhou 310027,China;3.Inner Mongolia University of Technology,Huhhot 010051,China);Influence of cable-struts arrangement on stability of suspen-dome[A];[C];2010
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved