《China Civil Engineering Journal》 2010-S2
Add to Favorite Get Latest Update

Processing model and application of sand and gravel of earth pressure balance shield

Dai Renping1 Gong Quanmei1 Zhou Shunhua1 Zhou Guannan2(1.Key Laboratory of Road and Traffic Engineering of Ministry of Education,Tongji University,Shanghai 201804,China;2.Group 3st Engineering of China Railway 13th Bureau Co.,Ltd.,Shengyang 110000,China)  
Compared with the soft soil layer,sand and gravel layer contains large diameter and high strength gravel,has the character of poor fluidity,high friction coefficient and low cohesion.Therefore shield machine allways encounters with the problems of excreting of large-diameter gravel,over-torquing,serious tool wearing and low tunneling efficiency.While excretion of large-diameter gravel and tool wearing would be especially obvious.These issues may be directly related to the selection of shield,of which the arrangement of cutter head and the selection of screw conveyor may be the most important.Thus in order to find out the specific measures for the solution.Two models are prososed of which the first is aimed at broking gravel,while the second focused on guiding,exhausting then transiting the grave.At the same time,the sheild machine's tunnlling characters and both models' features and scope are also compared.Taking a construction project as an example,the earth pressure balance shield is selected for sand and gravel layer tunnelling and researched existing problems during shield selection and construction.The conclutions is that the sheild selection should be abides by the second model of guiding,exhausting then transiting the grave and requirements for key facilities of earth pressure balance shield is put forward.
【CateGory Index】: U445.43
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 8 Hits
1 SONG Tian-tian,ZHOU Shun-hua(Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China);Design Analysis on Cutterhead of Shield Machine in Mixed Strata[J];Chinese Journal of Underground Space and Engineering;2007-03
2 HE Chuan,YAN Qi-xiang (Department of Tunnel and Underground Engineering,Southwest Jiaotong University,Chengdu 610031,China);Key Issues of Applying Mudding-type EPB Shields to Sandy Cobble Ground in Chengdu,China[J];Tunnel Construction;2007-06
3 XU Run-ze1,SONG Tian-tian2 (1.The 2nd branch of China Railway of 13th Bureau Group,Shenzhen 518000,Guangdong,China;2.Department of Urban Rail Transit and Railway Engineering,Tongji University,Shanghai 201804,China);Practice of Risk Identification and Assessment of Shield Tunnelling in Chengdu Metro[J];Tunnel Construction;2007-06
4 W·Burger , ZHUO Yong-jun;Summary of cutter head of shield-driven machine[J];Construction Machinery;2006-21
5 CHEN Guang-feng,ZHANG Jian-ping,GUI Yi-xiong,ZHANG Wen-ping;Improvement on cutter disc of tunneling shield for sandy cobble stratum in Beijing metro[J];Construction Machinery;2009-07
6 SONG Ke-zhi1,2,WANG Bo3,KONG Heng3,YUAN Da-jun2,WANG Meng-shu2 (1. College of Communications,Ludong Uiniversity,Yantai 264025,China; 2. Research Center of Tunneling and Underground Works,Beijing Jiaotong University,Beijing 100044,China; 3. Beijing Municipal Engineering Group Co.,Ltd.,Beijing 100045,China);STUDY ON FOAM TECHNOLOGY DURING SHIELD EXCAVATION IN SANDY COBBLE BED WITHOUT WATER[J];Chinese Journal of Rock Mechanics and Engineering;2005-13
7 SONG Weidong1,CHEN Ruihong1,DU Jianhua1,ZHANG Zhikun2 (1. School of Civil and Environmental Engineering,University of Science and Technology Beijing,Beijing 100083,China; 2. China Railway 16th Bureau Group Co.,Ltd.,Beijing 100018,China);NUMERICAL ANALYSIS OF EARTH PRESSURE BALANCE SHIELD TUNNELING AT GUOMAO—SHUANGJING INTERZONE OF BEIJING SUBWAY LINE NO.10[J];Chinese Journal of Rock Mechanics and Engineering;2008-S2
8 SONG Ke-zhi1,2, WANG Ben-fu3(1. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China; 2.School of Civil Engineering , Ludong University, Yantai 264025, Shandong, China; 3.Baima River Administration Agency of Zoucheng City, Zoucheng 273517, Shandong, China);Common Types of Shield Cutter Wheel and Selection[J];Road Machinery & Construction Mechanization;2007-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Li Pengcheng(The Second Engineering Co.,Ltd.of CTCE Group,Suzhou 215100,China);Study on Mechanical Behavior and Deformation of Segment Lining in Shield Driven Tunnel[J];Anhui Architecture;2008-05
2 YAN Chang-zheng1,2,ZHANG Qing-he1,2,WANG Shentang3(1.Key Laboratory of Geotechnical Engineering,Tongji University,Shanghai 200092,P.R.China2.Department of Geotechnical Engineering,School of Civil Engineering,Tongji University,Shanghai 200092,P.R.China3.University of Hawaii at Manoa,Hawaii 999204,U.S.A);Comparison of Internal Forces and Displacements between Continuous-jointed and Stagger-jointed Segmental Lining[J];Chinese Journal of Underground Space and Engineering;2007-04
3 LI Yun,ZHANG Zi-xin(1.Key Laboratory of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Department of Geotechnical Engineering,School of Civil Engineering,Tongji University,Shanghai 200092,China);Influence of Slurry Infiltration on Excavation Face Stability[J];Chinese Journal of Underground Space and Engineering;2007-04
4 ZHOU Shi-jun,WANG Jin-an(Civil and Environmental Engineering School,Beijing University of Science and Technology,Beijing 100083,China);The Surface Settlement Analysis of Curved Tunnel Shield[J];Chinese Journal of Underground Space and Engineering;2007-05
5 HAN Yue-wang1,ZHONG Xiao-chun2,YU Xing-fu3(1.Research Institute of Geotechnical Engineering,Hohai University,Nanjing 210098,P.R.China,2.College of Civil Engineering,Hohai University,Nanjing 210098,P.R.China;3.Zhejiang Academy of Building Research & Design Co.,Ltd,Hangzhou 310012,P.R.China);Experimental Research on the Backfill Grout Deformation and Grout Pressure Dissipation of Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2007-06
6 SONG Tian-tian1, ZHOU Shun-hua1,XU Run-ze2(1.Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China;2.China Railway 13th Bureau Group Co.,Ltd.,Changchun 130033,China);Mechanism and Determination of Parameters of Synchronous Grouting in Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2008-01
7 LI Ting-ping1,2,SHEN Shui-long1,JIANG Hong2 (1.Department of Civil Engineering,Shanghai Jiaotong University,Shanghai 200240,China;2.Shanghai Urban Construction Design & Research Institute,Shanghai 200125,China);Analysis on the Behavior of Existing Tunnels due to Setting of Slurry Pressure in Slurry Shield[J];Chinese Journal of Underground Space and Engineering;2009-03
8 ZHANG Fei-jin~(1,2),GAO Wen-xue~2 (1.Hainan Highway Survey and Design Institute,Hainan Haikou 570206,China; 2.The College of Architecture and Civil Engineering,Beijing University of Technology,Beijing 100124,China);Shield Tunnel Subsidence Influence Factor Analysis and Construction Optimization[J];Journal of Beijing University of Technology;2009-05
9 ZHAO Zi-jie CHENG Cui-lin (Beijing Municipal Institute of Hydraulic Engineering Planning,Design & Research,Beijing,100044,China);Selection based on comparison among mined tunnel construction methods for pressure water transportation in large diameter tunnel under water-rich stratum condition[J];Beijing Water;2007-04
10 YUAN Da-jun1,GUO Jian-tao1,ZHENG Jian-guo2,HUANG Qing-fei1(1.College of Civil and Construction,Beijing Jiaotong University,Beijing 100044,China;2.China Geotechnical Institute of Mechanics Industry,Xi'an 710043,China);The effects of shield tunnel construction of Xi'an Metro on the ancient city wall[J];Journal of Transport Science and Engineering;2009-02
China Proceedings of conference Full-text Database 10 Hits
1 ZHANG Fei-jin~1 GAO Wen-xue~2 1.Hainan Highway Survey and Design Institute,Haikou 570206,China; 2.Department of Civil Engineering,Beijin University of Teclmology,Beijin 100022,China;The construction control measure research of shield-driven tunnel crossing existed line[A];[C];2007
2 ;西气东输黄石长江穿越盾构隧道工程设计[A];[C];2005
3 ;盾构隧洞施工进出洞地基加固技术研究[A];[C];2005
4 ;Φ11.58m泥水平衡盾构改制技术[A];[C];2005
5 ;自行进式隧道掘进机急转弯机理[A];[C];2005
6 ;上海电力电缆隧道区间盾构施工若干风险点及对策[A];[C];2009
7 ;南京长江隧道盾构机刀具失效分析[A];[C];2009
8 ;南京长江隧道联络通道衬砌参数对结构内力的影响分析[A];[C];2009
9 ;新建路隧道盾构切削木桩施工的试验研究分析[A];[C];2009
10 ;城市轨道交通建设技术的发展展望[A];[C];2009
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 BIAN Jin , TAO Lian-jin , GUO Jun (College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100022, China);The Ground Settlement Monitoring of a Shield Tunnel[J];;2005-02
2 ZENG Dong-yang,HE Chuan(Dept.of Tunnel & Underground Engineering,Southwest Jiaotong University,Chengdu 610031,China);Comparison and Analysis Research of Different Shield Tunnel Lining Internal Forces Design Methods[J];Chinese Journal of Underground Space and Engineering;2005-05
3 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd.,Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);The Practice of Risk Management in Shangzhong Road Tunnel Engineering[J];Chinese Journal of Underground Space and Engineering;2006-01
4 ;Investigation in the Structure of Soil Pressure Balancing Shield[J];Construction Machinery and Equipment;2003-11
5 MIN Rui;Design analysis of cutterhead for combined shield machine[J];Construction Machinery;2004-08
6 SONG Ke-zhi~1,2;PAN Ai-guo~3;Operation principle analysis of cutting tools on shield[J];Construction Machinery;2007-03
7 YI Hong-wei 1, SUN Jun 2 (1.Shanghai Xincheng Industry General Co., Shanghai 201100, China; 2.Department of Underground Structures and Engineering, Tongji University, Shanghai 200092, China);Mechanism Analysis of Disturbance Caused by Shield Tunnelling on Soft Clays[J];Journal of Tongji University;2000-03
8 TANG Yi-qun1,ZHANG Xi1,WANG Jian-xiu1,SONG Yong-hui2 (1.Department of Geotechnical Engineering, Tongji University, Shanghai 200092,China; 2.Shanghai Tunnel Engineering Co.Ltd, Shanghai 200092,China);Earth Pressure Balance Shield Tunnelling-Induced Disturbance in Silty Soil[J];Journal of Tongji University;2005-08
9 WU Xian-guo~1 WANG Feng~1 (1.School of Civil Eng.& Mechanics,HUST,Wuhan 430074,China);Gradation Evaluation of Underwater Shield Tunnel Construction Risks Using R=P×C Method[J];Journal of Wuhan Urban Construction Institute;2005-04
10 Yue Guiping (Beijing Municipal Group, Beijing, 100055);Selection of shield machines for Beijing Metro construction[J];Modern Tunnelling Technology;2003-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved