Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Xinjiang Petroleum Geology》 2013-04
Add to Favorite Get Latest Update

The Risk Probability Prediction of Drilling Operation Site Using ARIMA Model

ZHAO Chunlan,WANG Bing,GUO Ping(College of Technology,Southwest Petroleum University,Chengdu,Sichuan,610500,China)  
There exist a lot of uncertainties during drilling operation,with high investment and high risks.Up to now,there is no quantitative risk probability prediction model for drilling operation site.This paper proposes the ARIMA model for quantitative prediction of drilling operation risks that may take place in future.Taking the field risk probability recorded from Longgang M well as samples of time sequence,the statistical characteristics are extracted followed by ADF inspection and pure random test with SAS software.Combining the ACF and PACF charts with the criterions of AIC,SBC and standard error,the final ARIMA(2,1,3) model has been developed,with the error of simulation of 4.477 4%.The prediction results show that the model is more suitable for drilling operation site in deep carbonate fractured reservoirs,and the short-term prediction results are better than the long-term prediction ones.
【Fund】: 油气藏地质及开发工程国家重点实验室开放基金(PLN1130);; 四川省教育厅科技重点项目(13ZA0192)
【CateGory Index】: TE28
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 Wang Bing;Yang Xiaoying;Zhao Chunlan;Xiao Bin;School of Computer Science,Southwest Petroleum University;School of Petroleum and Natural Gas Engineering,Southwest Petroleum University;School of Science,Southwest Petroleum University;;Drilling Site Risk Assessment Based on Bayesian Network[J];西南石油大学学报(自然科学版);2015-02
2 YANG Fan;ZHANG Zuoliang;ZHANG Qinglian;LIU Lei;XU Yong;Southwest Petroleum University;Petro China Kunlun Gas Co., Ltd.;;Risk Probability Forecasting of Drilling Site Operation[J];能源与节能;2015-02
【Citations】
Chinese Journal Full-text Database 7 Hits
1 Guo Fuqin1,Hua Pengtao2 1.Department of Maritime Engineering,Yan'an Vocational and Technical College,Yan'an,Shaanxi 716000,China 2.Electronic Information College,Xi'an Polytechnic University,Xi'an,Shaanxi 710048,China;Research of Auto-drilling Technology Based on Parameters' Self-adjusting Fuzzy Control[J];西南石油大学学报(自然科学版);2012-06
2 YIN Guo-qinga,ZHANG Huia,LI Chaoa,YUAN Fanga,DING Zhi-minb,WANG Jun-weic(Petrochina Tarim Oilfield Company,a.Research Institute of Exploration and Development,b.Center of Supervision and Administration, c.Department of Natural Gas,Korla,Xinjiang 841000,China);Formation Pressure Prediction of Drilling into Complex Zones in Piedmont of Tarim Basin[J];新疆石油地质;2012-04
3 Zhao Quanmin1,2,Fan Jianchun1,Zhang Hong2(1.School of Electric and Power Engineering,China University of Petrleum,Chengdu,Sichuan 610051,China;2.Sinopec International Petroleum Exploration and Development Co.,Ltd.,Beijing 100029,China);Quantitative risk evaluation of human factors and failures in the gas drilling industry[J];天然气工业;2012-07
4 WANG Cong-le1,ZHOU Peng-gao2a,YANG Hu 2a,LI Ya-shuang2b,MENG Ya-ling2c (1.Xinjing Oilfield Company,PetroChina,Karamay,Xinjiang 834000,China;2.Xinjing Oilfield Company,PetroChina,a.Research Institute of Exploration and Development,b.No.1 Production Plant,c.Luliang Field Operation District,Karamay,Xinjiang 834000,China);Mathematical Model for Deriving Formation Horizontal Stress from Sidewall Breakout Width[J];新疆石油地质;2012-02
5 CHANG Liang (College of Information & Electronic Technology,Jiamusi University,Jiamusi,Heilongjiang 154007,China);ARIMA Model Analysis and Prediction Based on Time Series Analysis[J];计算机时代;2011-02
6 TIAN Lan(CCDC Safety,Environment,Quality Supervision & Testing Research Institute);RISK IDENTIFICATION AND EVALUATION METHOD IN DRILLING ENGINEERING[J];钻采工艺;2010-02
7 Li Meiqiu,Zhou Sizhu. School of Mechanical Engineering Yangtze University,P. C. 434023;SAFETY ASSESSMENT OF DRILLING WELL BASED ON THE FUZZY INTEGRATIVE E-VALUATE METHOD[J];石油化工安全技术;2006-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Linhong;Yang Yuhong;School of Applied Electronic,Chongqing College of Electronic Engineering;State Key Laboratory of Power Transmission Equipment & System Security and New Technology,Chongqing University;;A short-term wind power predication method based on improved probability weights theory[J];电测与仪表;2015-08
2 Wang Bing;Yang Xiaoying;Zhao Chunlan;Xiao Bin;School of Computer Science,Southwest Petroleum University;School of Petroleum and Natural Gas Engineering,Southwest Petroleum University;School of Science,Southwest Petroleum University;;Drilling Site Risk Assessment Based on Bayesian Network[J];西南石油大学学报(自然科学版);2015-02
3 HUANG Yu-qiao;SONG Yi-xin;School of Civil Engineering and Architecture,Zhejiang Sci-Tech University;Zhejiang Zhenergy Natural Gas Operating Co.,Ltd.;;Semi-quantitative Risk Assessment of Urban Natural Gas Supply System[J];浙江理工大学学报;2015-02
4 HUANG Yu-qiao;LI Guo-Jian;Zhejiang Sci-Tech University;;Risk assessment of urban gas pipeline based on composition of natural gas supply system[J];河南城建学院学报;2014-04
5 Wang Jiamin;Zhang Hongyan;College of Information Science and Technology, Hunan Agricultural University;;Prediction on the number of mobile subscribers based on combined model ARIMA-SVM[J];计算机时代;2014-09
6 WEN Qianbin;YANG Hu;SHI Jiangang;YAN Peng;Research Institute of Engineering Technology,Xinjiang Oilfield Company,PetroChina;;Drilling Technology of Large Displaced Cluster Horizontal Well for Tight Oil in Changji Oilfield, Junggar Basin[J];新疆石油地质;2014-03
7 LIU Hong-fang;LIU Cheng-min;WANG Hai-ning;School of Resources and Environmental Engineering,Jiangxi University of Science and Technology;;Analysis on risk and evaluation methods for natural gas[J];中国安全生产科学技术;2014-02
8 SHE Haicheng;QU Zhan;CHEN Junbin;College of Energy Engineering;Yulin University;College of Petroleum Engineering,Xi'an Shiyou University;;Determination of Hydration Damage Instability Cycle of Shale Borehole Wall in Sulige Gas Field[J];新疆石油地质;2014-01
9 BAI Xinjun;FU Yingui;DENG Yi;QIU Ming;ZHANG Zhigang;GE Na;CNPC,Directional Drilling Company, Xibu Drilling Engineering Company Limited;CNPC,Xibu Drilling Engineering Company Limited;;Drilling Fluid Selection of Well Y128 in Anyue Gas Field,Sichuan Basin[J];新疆石油地质;2013-06
10 HAN Xiuling;XIONG Chunming;ZHOU Fujian;ZHANG Fuxiang;LIU Xiongfei;Research Institute of Petroleum Exploration and Development,PetroChina;Langfang Branch,ResearchInstitute of Petroleum Exploration and Development,PetroChina;Tarim Oilfield Company,PetroChina;;A New Method for Improving Fracturing Volume in Ultra-Deep Fractured Reservoir[J];新疆石油地质;2013-05
【Co-references】
Chinese Journal Full-text Database 9 Hits
1 ZHAO Chunlan,WANG Bing,GUO Ping(College of Technology,Southwest Petroleum University,Chengdu,Sichuan,610500,China);The Risk Probability Prediction of Drilling Operation Site Using ARIMA Model[J];新疆石油地质;2013-04
2 Zhao Quanmin1,2,Fan Jianchun1,Zhang Hong2(1.School of Electric and Power Engineering,China University of Petrleum,Chengdu,Sichuan 610051,China;2.Sinopec International Petroleum Exploration and Development Co.,Ltd.,Beijing 100029,China);Quantitative risk evaluation of human factors and failures in the gas drilling industry[J];天然气工业;2012-07
3 GAO Xiao-Guang1 CHEN Hai-Yang2 SHI Jian-Guo31. School of Electronics and Information,Northwestern Polytechnical University,Xi an 710129 2. School of Electronic Information,Xi an Polytechnic University,Xi an 710048 3. No.7 Department of Navy Aeronautical and Astronautical University,Yantai 264001;Study on the Mechanism of Structure-variable Dynamic Bayesian Networks[J];自动化学报;2011-12
4 TIAN Lan(CCDC Safety,Environment,Quality Supervision & Testing Research Institute);RISK IDENTIFICATION AND EVALUATION METHOD IN DRILLING ENGINEERING[J];钻采工艺;2010-02
5 LIU Jing-kai(Safety and Environment Division of China National Petroleum Corporation,Beijing 100011,China);Study on HSE-MS establishment based on management practice[J];中国安全生产科学技术;2008-02
6 Li Meiqiu,Zhou Sizhu. School of Mechanical Engineering Yangtze University,P. C. 434023;SAFETY ASSESSMENT OF DRILLING WELL BASED ON THE FUZZY INTEGRATIVE E-VALUATE METHOD[J];石油化工安全技术;2006-06
7 ZHANG Ming-guang,JIANG Jun-cheng(College of Urban Construction and Safety & Environmental Engineering,Nanjing University of Technology,Nanjing 210009,China);Application of analytical hierarchy process in hazard degree assessment of major hazard installations[J];南京工业大学学报(自然科学版);2006-02
8 DONG Guo-yong,LIU Jing-kai (Quality and HSE Division of China Petroleum Corporation,Beijing, 100724;CNPC' s HSE-MS model establishment and practice[J];中国安全生产科学技术;2005-03
9 Liu Yushi; Bai Jiazhi; Zhou Yihui;Huang Rongzun (Scientific Research Institute of Petroleum Exploration and Development, Beijing) (Petroleum university , Beijing);MUD DENSITY FOR WELLBORE STABILITY WHEN FORMATION ROCK IS DAMAGED[J];石油学报;1995-03
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 DONG Ding-wen;CHEN Zan;College of Energy Science and Engineering,Xi'an University of Science and Technology;Shaanxi Hui Sen Coal Industry Development Co.,Ltd.;;Dynamic and quantitative safety evaluation of mine system based on Bayesian classification[J];西安科技大学学报;2015-03
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 GUO Gui-sheng1a,LIN Jing-qi2,ZHANG Zhong-hua1a,WU Cong-wen1b,HOU Qing-yu2(1.PetroChina Xinjiang Oilfield Company,a.Development Company;b.Luliang Production Plant,Karamay,Xinjiang 834000,China; 2.Well Logging Company,CNPC Xibu Drilling Engineering Company Ltd.,Karamay,Xinjiang 834000,China);Prediction of Pore Pressure,Fracture Pressure and Collapse Pressure with Well Logging Data[J];新疆石油地质;2011-02
2 Zhang Hong1,Wang Kai1,Zeng Hong2(1.School of Resources & Safety Engineering,China University of Mining & Technology,Beijing 100083,China;2.Sichuan Petroleum Geophysical Prospecting Company,Chuanqing Drilling Engineering Co.,Ltd.,CNPC,Chengdu,Sichuan 610213,China);Feature analysis and countermeasures of human error in drilling blowout incidents[J];天然气工业;2010-08
3 REN Hong-biao,ZHANG Da-zhi,ZHANG Yong-jun (National Engineering Research Center for Advanced Rolling,USTB,Beijing 100083,China);Fuzzy Control of Auto-drilling with Variable Frequency Drive Using S7-300 PLC[J];石油矿场机械;2010-04
4 LIU Ying-biao, YANG Hu, DENG Ping (Research Institute of Exploration and Development, Xinjiang Oilfield Company, PetroChina, Karamay, Xinjiang 834000, China);In-Situ Stress Research of Wellblock Huo-10 in Huo'erguosi Anticline in Junggar Basin[J];新疆石油地质;2008-04
5 CHEN Ru-heng (China University of Petroleum(Beijing),Beijing 102249,China);Breaking-up Old Concept,Creating New Drilling Rigs(Part5)[J];石油矿场机械;2008-07
6 LI Qi, YU Lin-lin, LIU Zhi-kun, GAO Xiao-rong (College of Petroleum Engineering, Xi'an Shiyou University).;INTEGRATED DRILLING RISK EVALUATION METHOD AND MODEL ESTABLISHMENT[J];天然气工业;2008-05
7 CHEN Ru-heng(China University of Petroleum (Beijing),Beijing 102249,China);Breaking-up Old Concept,Creating New Drilling Rigs (Part1)[J];石油矿场机械;2008-03
8 Zhang Ming-zhen,Yin Xin-yao,Tan Ming-you and Liu Bing-jian.Zhuang-Gu Office,Research Institute of Geophysical Prospecting,No.210,Beiyi Road,Dongying City,Shandong Province,257022,China;Realization and application of logging-constrained seismic wave impedance inversion[J];石油地球物理勘探;2007-06
9 LEI Ke-wei~(1,2),CHEN Ying~1(1.School of Tourism and Environment,Shaanxi Normal University,Xi'an Shaanxi 710062,China;2.Department of Tourism,School of Foreign Language,Xi'an Eurasia University,Xi'an Shaanxi 710065,China);Forecast of Inbound Tourists to China Based on BP Neural Network and ARIMA Combined Model[J];旅游学刊;2007-04
10 Gou Sanquan(School of Management,China University of Mining and Technology,Beijing,100083,China);Review of Risk Analysis of Exploiting Oil Fields[J];石油钻探技术;2007-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved