Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Systems Engineering and Electronics》 2017-12
Add to Favorite Get Latest Update

Routing plan method for equipment maintenance task based on improved MMAS

CHEN Chunliang;ZAN Xiang;ZHANG Shixin;LIU Yan;CHEN Weilong;Department of Technical Support Engineering,Academy of Armored Force Engineering;  
Based on the analysis of the characteristic of various constraints in equipment maintenance task routing plan,a model of equipment maintenance task routing plan is established.In the model,the influence of time constraint and load capacity constraint is fully considered.Through comparing similarities and differences between the equipment maintenance task routing plan problem and the traditional vehicle routing problem,a maintenance task routing plan method based on improved max-min ant system(MMAS)is presented.Rules of selecting maintenance,pheromone updating and acquiring prior information of MMAS are improved.Finally,through an example and comparison,the verifiability and effectuality of the algorithm are verified.
【Fund】: 军队科研计划项目(2015WG57)资助课题
【CateGory Index】: E92
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved