Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《INFORMATION AND CONTROL》 1994-04
Add to Favorite Get Latest Update

SIMULATION ENVIRONMENT FOR RULE-BASED JOB SHOP SCHEDULING

XIONG Guanleng;GAO Hong(Automation Department Tsinhua Universtiy,Beijing)  
his paper considers the scheduling of FMS job-shops,The use of simulation in the designand control of flexible manufacturing Systems has proven to be more practical than traditional mathematicalapproaches.Although simulation-based scheduling has shown advantages in capturing the scope,complexityand dynamics of the job-shops production,it leaves the user with numerous work of generating, testing,andselecting different control:trategies。 In this paper.a discrete- event simulation- based boftware Faetory Simu-lation Scheduling Environment(FASE) is outlined. A new simulation architecture,based on decision rule-base,is suggested.Also detailed is its design and implementation in the FASE system.
【Fund】: 863计划CIMS主题资助
【CateGory Index】: TH165
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Caixia SHI Yiping HE Chenghong HAN Jingtao HE Yuxin (University of Science and Technology Beijing);RESEARCH OF SCHEDULING METHOD OF INTEGRATED STEELMAKING CASTING ROLLING PRODUCTION SYSTEM[J];IRON AND STEEL;2000-02
2 LIU Yuechang,ZHONE Xiuyu,FANG Yishan,CHEN Jianbiao School of Computer Science,Jiaying University,Meizhou,Guangdong 514015,China;Dynamic simulation and modeling for AI planning based on Europa2[J];Computer Engineering and Applications;2012-17
3 Guangleng Xiong and Xiaoping Xu(Tsinghua University);Application of Computer Simulation in Operation of Manufacturing Shop[J];COMPUTER SIMULATION;1996-03
4 CHANG Jian-feng ZHONG Yue-xian HAN Zan-dong (Department of Mechanical Engineering, Tsinghua University, Beijing 100084);Research on scheduling of the automobile press shop in virtual environment[J];Journal of Plasticity Engineering;2004-06
5 LIU Xiao-bing,WANG Shun-bao,MENG Qiu-nan,BO Hong-guang(CIMS Center of Dalian University of Technology,Dalian 116023,China);Research on Integrated Dynamic Scheduling Model for Iron and Steel Enterprise[J];Microprocessors;2007-02
6 SUN Hang,WANG Zai-gang,DENG Ke(Scientific Research Department,DaLian Naval Academy, Liaoning Dalian 116018,China);CGF fuzzy decision-making model based on hierarchical planning and blackboard reasoning[J];Modern Defence Technology;2006-05
7 WEIJun hu HANJiu qiang SUNGuo ji (SystemsEngineeringInstitute ,Xi’anJiaotongUniversity ,Xi’an 710 0 49,China);ApplicationsofDESSimulationTechniquetotheProductionScheduling[J];ACTA SIMULATA SYSTEMATICA SINICA;2000-01
8 WEI Jun-hu, HAN Jiu-qiang, SUN Guoji (National Lab for Manufacturing Systems Engineering, Institute of Systems Engineering, Xi'an Jiaotong University, Xi'an 710049, China);Optimal Scheduling Models of Semiconductor Manufacturing[J];Acta Simulata Systematica Sinica;2001-02
9 LU Wen-yan,DANG Yan-zhong (Institute of Systems Engineering Dalian University of Technology, Dalian 116023, China);The Application of Visualized Simulation in Scheduling Re-entrant Manufacturing System[J];Acta Simulata Systematica Sinica;2003-09
10 Chen Wei,Zheng Shixiong;A study of the dynamic scheduling based-on distributive manufacturing[J];Machinery Manufacturing Engineer;2001-11
China Proceedings of conference Full-text Database 1 Hits
1 Liu Yuechang,Zhong Xiuyu,Fang Yishan, Chen Jianbiao (School of Computer Science,Jiaying University, Meizhou 514015,China);Dynamic simulation and modeling for AI planning based on Europa2[A];[C];2011
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Yin Ruiyu (General Iron and Steel Research Institute);Review and Prospect of Iron and Steel Industry in China[J];Angang Technology;2004-04
2 LI Qi 1,LIANG Bin 2,WANG Rui_zhi 3,LIU Hong-yan 4 (1.School of Electronic and Information Engineering,Anshan Institute of I.& S.Technology,Anshan 114002,China; 2.Lingshan Machinery Factory,Angang Group Mahinery Manufacture Company,Anshan 114002,Chin;A Reverse Algorithm of Job-Shop Scheduling Problem Subject to Sequence Constraints[J];Journal of Anshan Institute of Iron and Steel Technology;2001-06
3 PAN Feng ,QIAN Xing-san(University of Shanghai for Science and Technology, Research Institute of Industrial Engineering/Microelectronics Development Research Center,Shanghai 200093 China);Methods of optimization for throughput and cycle time in semiconductor wafer fabrication[J];Semiconductor Technology;2004-02
4 LI Ying na, LI Jian yong,LI Zhi hui (College of Mechanical, Electronic and Control Engineering, Northern Jiaotong University, Beijing 100044,China);Research on the Robust Facility Layout Design of Flexible Manufacturing System[J];Journal of Northern Jiaotong University;2001-04
5 ZHANG Jiong,LANG Mao-xiang (School of Traffic and Transport, Beijing Jiaotong University, Beijing 100044,China);The Tabu Search Algorithm for Distribution Vehicle Scheduling Problem with Time Windows[J];Journal of Northern Jiaotong University;2004-02
6 ZHU Fan WANG Yan jia (1 Baosteel Energy Department,Shanghai 200941,China; 2.Qinhua University,Beijing 100084,China);Study on Operation for Thermodynamic System of Heat and Power Co generation[J];Bao Steel Technology;2001-01
7 XIONG Fei (Baosteel Technology Center,Shanghai China,201900);Analysis on Control System of Hydrogen Bell-type Annealing Furnace Developed at Baosteel[J];Bao Steel Technology;2002-06
8 DENG Wan-li 2.CHEN Wei-chang(Baosteel Energy Department,Shanghai China,200941);Practice on BF Gas System Balance at Baosteel[J];Bao Steel Technology;2003-02
9 Gu Ming Zhou Qing’an (Energy Department);Recovery and Utilization of Converter Gas of Baosteel[J];BAO STEEL TECHNOLOGY;1999-02
10 REN Ai hua JIN Mao zhong (Beijing University of Aeronautics and Astronautics, Dept. of Computer Science and Engineering);Study on Real-Time Software Developing Method of Multiprocessor System with OOPN Model[J];Journal of Beijing University of Aeronautics and Astronautics;2001-04
China Proceedings of conference Full-text Database 1 Hits
1 LI Gui-fen, JU Yan-bing (School of Management and Economics, Beijing Institute of Technology, Beijing 100081,China.;Method of JSP Optimization Based on Simulation and GA[A];[C];2006
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 LUO Shou-zhang QIU Hong-ping 2.LIU Feng(1.Baosteel Technology Center;2.Baosteel Transportation Department,shanghai 201900,China);Study on Modeling and Simulation of Train Dispatching in Molten Iron Transport System[J];Bao Steel Technology;2004-04
2 MA Zheng-yuan, WANG Wei-ling, WANG Yu-sheng(Shenyang University of Technology, Shenyang 110023,China);Systematic Research and Development On the Production Scheduling[J];Group Technology & Production Modernization;2005-01
3 LONG De~1, YAO Jian-shi~2, XU Xin-he~3(1. Key Laboratory of Process Industry Automation (Ministry of Education), Northeastern University, Shenyang 110004, China; 2. Self-Propelled Gun Department, Shenyang Artillery College, Shenyang 110162, China; 3. School of Information Science & Engineering, Northeastern University, Shenyang 110004, China. );Intelligent Simulation Model of Molten Iron Transport System[J];JOURNAL OF NORTHEASTERN UNIVERSITY;2005-06
4 WANG Wan-Lei1,LIU Xiao-Bing 2(1.College of Electromechanical and Information Engineering,Dalian Nationalities University,Dalian Liaoning 116605,China;2.CIMS-Center,Dalian University of Technology,Dalian Liaoning 116023,China);Research on Scheduling Modeling for Multistyle Product Manufacturing Workshop[J];Journal of Dalian Nationalities University;2008-01
5 CAO Zheng-cai,QIAO Fei,WU Qi-di(CIMS Research Center,Tongji University,Shanghai 200092,China);Research Progress of Modeling Methods and Scheduling Strategies for Semiconductor Wafer Fabrication[J];Acta Electronica Sinica;2006-S1
6 LU Husheng 1, WU Sen 2, LIU Bing 2, LIU Zhengang 3 (1.School of Material Engineering Baotou University of Iron and Steel Technology,Baotou 014010; 2.School of Management University of Science and Technology Beijing,Beijing 100083; 3.Department of Production Baotou lron and Steel Co.,Baotou 014010);MAXIMUM PROFIT FLOW ALGORITHM FOR OPTIMIZATION OF PRODUCTION PLANNING OF STEEL WORKS[J];Iron and Steel;2004-03
7 ZHU Dao-fei1,ZHENG Zhong1,GAO Xiao-qiang2(1.College of Material Science and Engineering,Chongqing University,Chongqing 400045,China;2.College of Economics and Business Administration,Chongqing University,Chongqing 400044,China);Optimization Model Based on Genetic Algorithms for Production Planning of Steelmaking and Continuous Casting Process[J];Iron & Steel;2008-07
8 ZHONG Jiang sheng (Department of Mechatronic Engineering, Wuyi University, Jiangmen 529020, China);Scheduling of dual-resource constrained manufacturing system[J];Engineering Design;2002-02
9 SUN Wei,HAN Qing-kai,YU Tao,WEN Bang-chun(School of Mechanical Engineering & Automation,Northeastern University,Shenyang 110004,China);Research on visual simulation of automobile gearbox assembling line[J];Journal of Engineering Design;2006-04
10 XU Xiuwen1,QIU Shunliu2,Song Yuchuan1,LI Peng1(1.The Skate Key Laboratory of Mechanical Transmission,Chongqing University,Chongqing 400044,China;2.Chongqing Hongjiang Machinery Co.Ltd.,Chongqing 402162,China);Impact assessment method of dynamic events in discrete production workshop[J];Journal of Chongqing University;2012-S1
China Proceedings of conference Full-text Database 6 Hits
1 LI Gui-fen, JU Yan-bing (School of Management and Economics, Beijing Institute of Technology, Beijing 100081,China.;Method of JSP Optimization Based on Simulation and GA[A];[C];2006
2 LONG De PENG Hong (College of Computer Science and Engineer,South China University of Technology,Guangzhou 510641,China.;Study on modeling and simulation of train dispatching in molten iron transport system[A];[C];2007
3 HAO Ping,MO Fengyong,XU Xinli College of Information Engineering,Zhejiang University of Technology,Hangzhou 310014;A Dyeing Workshop Hierarchical Scheduling Strategy Based On Genetic Algorithm and Multi-Agent System[A];[C];2009
4 Lei Zhang Tianmu Ma Binglin Zheng (Research Center of Automation, Northeast University, ShenYang, 110004);The New Technology of Integrated Batch Planning(IBP)[A];[C];2005
5 Zheng Zhong He Lamei Gao Xiaoqiang (College of material Science and Engineering, Chongqing University,Chongqing 400044; College of Economics and Business Administration, Chongqing University,Chongqing 400044);THE APPLICATION OF PROCESS FLOW SIMULATION BASED IN CELLULAR AUTOMATA TO STEEL-MAKING PROCESS[A];[C];2005
6 DeLONG,Yun ZHANG (Faculty of Automation,Guangdong university of technology,510006);Modeling and Simulation on Intelligent Train Dispatching in Molten Iron Transport System[A];[C];2009
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved