Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Oil & Gas Storage and Transportation》 2019-05
Add to Favorite Get Latest Update

Development of a portable fast installation device for heat shrinkable tape stators

WANG Changjiang;ZHANG Yuan;LIU Rui;LIU Ran;ZHAO Zhonggang;China Petroleum Pipeline Research Institute Co.Ltd.;China Petroleum Pipeline Engineering Co.Ltd.;China Petroleum Pipeline Engineering Co.Ltd.(Engineering);  
The installation of heat shrinkable tape stator by using the artificial torch during the construction of anticorrosion joint coating on existing oil and gas pipelines is faced with great influence of human factors, large difference of quality and low efficiency. To solve these problems, a portable fast installation device for the heat shrinkable tape stator was developed in this paper. By virtue of this device, the mechanized fast installation of heat shrinkable tape stator can be realized. The test result shows that this portable fast installation device for heat shrinkable tape stators is advantageous with reasonable structure, simple operation, convenience and portability, good installation quality, high efficiency and short time consumption, and it can meet requirements on the flow process of mechanized anticorrosion joint coating on oil and gas pipelines. In addition, this device is adaptable to the construction environment of extremely low temperature(-40 ℃), so as to effectively guarantee the construction quality of anticorrosion joint coating on oil and gas pipelines in high and cold areas.(6 Figures, 1 Table, 23 References)
【CateGory Index】: TE97
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Wang Changjiang;Feng Cundong;Zeng Huilin;Xu Changxue;Yan Jie;Yu Jinzhu;China Petroleum Pipeline Research Institute;No.2 Construction Company of China Petroleum Pipeline Bureau;;Mechanical Repair Workstation for Long-distance Oil and Gas Pipeline[J];石油科技论坛;2015-S1
2 Liu Yuanhong;Li Changyong;Li Liangjun;Sichuan Kehong Oil and Natural Gas Engineering Co.,Ltd.,CNPC;Southwest Oil & Gasfield Company,PetroChina;;Solution to the defects in 3LPE field coating for welded joints of pipelines[J];天然气工业;2015-05
3 LIU Feng;ZENG Chuan-yin;SPC Pipeline Coating Company;;Application of Mechanical Heat Shrinkable Tape in Three Line of West to East Gas Pipeline Project[J];管道技术与设备;2015-03
【Secondary Citations】
Chinese Journal Full-text Database 9 Hits
1 LIAO Yu-zhao;WANG Jie;LI Jian-jun;LI Xiao-feng;ZHENG An-sheng;FU Wei;China Petroleum Pipeline Engineering Co.;;Current Status and Trends of Application Process for Heat Shrinkable Sleeve Field Joint Coating System Based on Polyethylene[J];腐蚀与防护;2014-06
2 WANG Chang-jiang;ZENG Hui-lin;ZHAO Yong-qiang;LIU Ran;China Petroleum Pipeline Research Institute;China Petroleum Pipeline Bureau;;Automatic Sand-blasting Equipment Applied to 3rd West-east Natural Gas Pipeline Project[J];流体机械;2014-03
3 Feng Shaoguang,Luo Jingxin,Zhao Jishi,Li Rongguang,Zhang Xin, Zhao Guoxing,Liu Jinghui,Hou Yu 1.National Engineering Laboratory of Transportation Safety of Oil&Gas Pipeline,PetroChina Pipeline R&D Center, Langfang,Hebei,065000;2.China Petrolenm Pipeline Engineering Corporation,Langfang,Hebei,065000;Influence of structural differences of hot-melt adhesive on peel strength of heat shrinkable sleeves[J];油气储运;2013-02
4 YE Chun-yan(CNPC Pipeline Research Institute,Langfang 065000,China),ZHANG Peng,KANG Jing-po,et al.;Construction Technique of Field Joint Applying Heat Shrinkable Tapes by Intermediate Frequency Heating[J];石油工程建设;2012-05
5 Xu Li1, Yao Shi-hong1, Wang Cheng-qiang1, Chen Hai-jun2 (1. China Petroleum Pipeline Bureau; 2. Langfang Special Automobile Transportation Company Limited, CPP);High-level Construction Technology Comes from Tracking World Pipeline Construction Development[J];石油科技论坛;2012-02
6 Wang Changjiang(China Petroleum Natural Gas PipelineScientific Research Academy, Langfang City, Hebei Province),Le Tian, Yin Tie, et al.;The development of the automatic derusting machine for the anticorrosive joint coating of oil and gas pipeline[J];石油机械;2012-02
7 Luo Feng,Wang Guoli,Dou Peng,et al.;Analysis on the Failures of Heat Shrinkable Sheet and Corresponding Measures[J];石油规划设计;2012-01
8 Sun Qingfeng Shandong Union Energy Pipeline Transportation Co.Ltd.,Yantai,Shandong,264000.;Field coating for welded joint technique of 3PE pipeline[J];油气储运;2011-04
9 ZHANG Zi-li,HAN Zhong-qin,CUI Chao,LIAO Yu-ping,DONG Bin;Application and Problems About Heat-shrink Belt Patch of Long Transportation Pipeline in Our Country[J];现代涂料与涂装;2010-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved