Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Oil & Gas Storage and Transportation》 2019-05
Add to Favorite Get Latest Update

Calculation of earth and rock excavation volume of oil/gas pipeline trench by means of integral method

SANG Yue;FENG Can;WANG Baojing;FU Guihua;YAO Yulin;LIU Yan;Tangshan Jidong Oilfield Design Engineering Co.Ltd.;School of Economics, Nankai University;  
The excavation shape of the pipeline trench changes constantly with the change of terrain, topography and geological conditions along long-distance oil/gas pipelines, so it is difficult to accurately calculate the earth and rock excavation volume of the pipeline trench. In this paper, the geometric model of pipeline trench was established according to the technical requirements of oil/gas pipeline trench excavation. Then, the complex geometric model of oil/gas pipeline trench was divided into two types, i.e., linear volume unit and circular curve volume unit. The accurate volume calculation formula for both volume units are solved by means of the integral method. The calculation formula of circular curve volume unit is more complicated, and it is checked by fitting the arc with multiple line segments. The result shows that the calculation formula of circular volume unit is reasonable and can be used to calculate the earth and rock excavation volume of oil/gas pipeline trench.(4 Figures, 2 Tables, 20 References)
【CateGory Index】: TE973.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 Sang Yue;Cui Wenli;Gao Yuxiang;Chen Xuehu;Luo Jinrui;Zhang Rui;Lyu Xiaoli;Tangshan Jidong Oilfield Design Engineering Co.,Ltd.;Urban Communications Engineering Co.,Ltd.of CCCC First Harbor Engineering Co.,Ltd.;;Development of Profile Drawing Software for Oil and Gas Pipelines[J];石油工程建设;2014-06
2 SANG Yue(Tangshan Jidong Oilfield Design Engineering Co.,Ltd.,Tangshan 063000,China),JIANG Bin,LIU Yan,et al.;Application of RTK Technique in Long-distance Pipeline Survey[J];石油工程建设;2010-02
3 TIAN Xiao-chun (East China Pipeline Design and Research Institute, Xuzhou 221008,China);Cost Compiling Key Points of Long-distance Pipeline Crossing Mountainous Areas[J];石油工程建设;2009-02
4 DONG Zhengyuan;A Calculation Model for Economic Depth of Buried Hot Oil Transportation Pipelines[J];油气储运;2007-09
5 LUO De-Ren,ZOU Zi-Li(1.School of Info-physics and Geometrics Engineering,Central South University, Changsha, HN 410012,China; 2.East China Institute of Technology,Fuzhou,JX 344000,China);Contrasting and Analysis of the Method of Earthwork Calculation[J];东华理工学院学报;2005-01
6 Liu Xiaotian;Calculation Methed of Cut Earth and Stone Volume Of Pipe Trench for Pipeline[J];天然气与石油;1997-02
【Co-citations】
Chinese Journal Full-text Database 9 Hits
1 Wei Wenbo;Shanghai Water Engineering Design and Research Institute Co.,Ltd;;The Application of FastTFT in Earthwork Calculation of a New Water Treatment Plant[J];上海水务;2015-03
2 Li Na;Shao Bilin;Li Jiaoqun;Lu Kangting;College of Material and Mineral Resources,Xi'an University of Architecture & Technology;College of Management,Xi'an University of Architecture & Technology;;Measurement Acceptance Method Based on DTM Discrete Model in Open-pit Mine[J];金属矿山;2015-08
3 HUANG Yanli;School of Civil Engineering, Putian University;;Application of CASS in Earthwork Calculation of Grading[J];安阳工学院学报;2015-04
4 Guo Zhibin;Shanxi Jincheng Coal Industry Group;;Research on civil engineering management of ventilating shaft of coal mines[J];山西建筑;2015-19
5 TAO Zuchang;Hydrology and Water Resources Bureau of Sanmenxia Reservoir Area,YRCC;Wuxi City Water Conservancy Bureau;;Reservoir Volume( Ore Body and Earthwork) Geometry and Volume Calculations in a Number of Issues[J];人民黄河;2015-06
6 TAO Zuchang;Hydrology and Water Resources Bureau of Sanmenxia Reservoir Area,YRCC;Wuxi City Water Conservancy Bureau;;Reservoir Volume(Ore Body,Earthwork)Geometry and Volume Calculations in a Number of Issues[J];人民黄河;2015-06
7 LIU Heng;ZHAO Yan;LI Muhan;Tianjin Institute of Surveying and Mapping;;Research and Implementation of the Method of Earthwork Calculation Based on Vertical Section Integral[J];测绘地理信息;2014-05
8 Lv Hongtao;Fang Guangjie;Shu Fei;China Petroleum Pipeline Engineering Corporation;;Application of VRS Technology in Pipeline Engineering Survey[J];天然气与石油;2014-02
9 XIE Peipei;;Technical Research on the Earthwork Computations Method[J];地理空间信息;2014-01
【Secondary Citations】
Chinese Journal Full-text Database 5 Hits
1 HUA Fu-hao(China Petroleum Pipeline Bureau No.3 Construction Company,Zhongmu 451450,China),LIU Da-ming,GAO Bao-hua;A Simple Way of Drawing Layout Plan for Pipeline Construction[J];石油工程建设;2013-04
2 GE Zhi-xiang, ZHENG Ke-min (Shanghai Gas Engineering Design & Research Co., Ltd., Shanghai 200070, China);Optimization on Buried Depth of Underground Gas Pipeline[J];煤气与热力;2004-05
3 MA Long DU Daosheng (National Laboratory for Information Engineering in Surveying,Mapping and Remote Sensing, Wuhan University, 129 Luoyu Road, Wuhan 430079,China);ANALYSIS AND EVALUATION OF THE ACCURACY FOR THE DEM PRODUCTS IN GIS[J];测绘信息与工程;2003-03
4 ZHOU Yue xuan 1, LIU Xue jun 2, YANG Zhi hong 2(1.Changsha House Property Supervision Department, Changsha 410005,China; 2.Changsha Comm. Univ., Changsha 410076,China);Earthwork Volume Calculation and Accuracy Analysis Based on Digital Terrain Model(DTM)[J];长沙交通学院学报;2000-04
5 WAN Weijie1,XIE Chunde2 (1.Department of Environmental Engineering ,NW Inst. of Arch. Eng.,Xi′an 710061, China; 2.Xi′an Municipal Engineering Design and Research Institute, Xi′an 710068,China);The relationship in drainage pipeline size and buried depth and the technical measure for controlpoint[J];西北建筑工程学院学报(自然科学版);2000-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved