Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Drilling & Production Technology》 2010-02
Add to Favorite Get Latest Update

RISK IDENTIFICATION AND EVALUATION METHOD IN DRILLING ENGINEERING

TIAN Lan(CCDC Safety,Environment,Quality Supervision & Testing Research Institute)  
Drilling engineering has much uncertainty and it always involves high risks.Basing the risk's characteristic and statistic of drilling accident,blowout or blowout out of control,poisoning,object against,falling,machine damage,electric shock and fire are mostly risks in drilling engineering.According as different accident,Safety check list analysis(SCA),preliminary hazard analysis(PHA)and fault tree analysis(FTA)were applied in the risk evaluation of drilling engineering.Those reasonable accident prevention measures could reduce the accident in drilling engineering.
【CateGory Index】: TE28
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Gou Sanquan(School of Management,China University of Mining and Technology,Beijing,100083,China);Review of Risk Analysis of Exploiting Oil Fields[J];Petroleum Drilling Techniques;2007-02
2 Yu Runqiao ,Wang Ping;Analysis of Drilling Risk and Cost Design[J];PETROLEUM DRILLING TECHNIQUES;1995-04
3 LI Qi, YU Lin-lin, LIU Zhi-kun, GAO Xiao-rong (College of Petroleum Engineering, Xi'an Shiyou University).;INTEGRATED DRILLING RISK EVALUATION METHOD AND MODEL ESTABLISHMENT[J];Natural Gas Industry;2008-05
【Co-citations】
Chinese Journal Full-text Database 8 Hits
1 JIANG Xu(Liaohe Oilfield Company,PetroChina,Panjin 124010,Liaoning,China);High-Sulfur Oil-Gas Field Drilling HSE Management System[J];Journal of Chengde Petroleum College;2010-02
2 ZHAO Jing-yu(School of Economics and Management,Southwest Petroleum University,Chengdu 610500,China);Study for drilling risk fuzzy assessment based on the rough set[J];Science-Technology and Management;2010-02
3 Ma Shiyu (GW-62 Drilling Crew, CNPC) and Yang Minyu (East Sichuan Drilling Com., SPA);PRACTICE AND COGNITION OF HSE MANAGEMENT IN OVERSEA DRILLING SITES[J];Natural Gas Industry;2005-04
4 LI Qi, YU Lin-lin, LIU Zhi-kun, GAO Xiao-rong (College of Petroleum Engineering, Xi'an Shiyou University).;INTEGRATED DRILLING RISK EVALUATION METHOD AND MODEL ESTABLISHMENT[J];Natural Gas Industry;2008-05
5 LI Qi1 CHANG Du1 XU Yingzhuo2 TANG Jiping3 LIANG Hongjun3(1.Institute of Petroleum Engineering,Xi'an Shiyou University,Xi'an 710065,China;2.Institute of Computer,Xi'an Shiyou University,Xi'an 710065,China;3.Exploration Department,PetroChina Tarim Oilfield Company,Kuerle 841000,China);Drilling risk management system based on knowledge integration[J];Acta Petrolei Sinica;2009-05
6 GUO Fengping, ZHANG Jinzhong, ZHENG Shengqiang (College of Mechanical and Electronic Engineering in the China University of Petroleum, Shandong Dongying,257061);Construction of the Drilling Safety Evaluation Comprehensive Database[J];Modern Manufacturing Technology and Equipment;2009-06
7 Zhang Hu,Xie Xiangjuan,Hao Xiaoli,Zhu Haishuang,Southwest Petroleum University;A SIMPLE AND PRACTICAL METHOD FOR DRILLING ENGINEERING RISK ASSESSMENT[J];Computer Applications of Petroleum;2010-01
8 HAN Zhu-yang WENG Wen-guo,Assoc. Prof.(Center for Public Safety Research,Department of Engineering Physics,Tsinghua University,Beijing 100084,China);An Overview of Quantitative Risk Analysis Methods for Natural Gas Pipelines[J];China Safety Science Journal(CSSJ);2009-07
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 HUANG Dong_mei 1,HA Ming_hu 2,WANG Xi_zhao 2(1.Department of Basic Science, Hebei Agricultural University, Baoding 071001,China;2.Department of Mathematics,Hebei University,Baoding 071002,China);Comparision between Decision Tree and Fuzzy Decision Tree[J];JOURNAL OF HEBEI UNIVERSITY(NATURAL SCIENCE EDITION);2000-03
2 Wang Zongjun Feng Shan;The Multilayer Overall Fuzzy Evaluation of Different Simulating Schemes for the Socio-Economic System[J];;1993-03
3 Wang Jian (1.Institute of Policy and Management Chinese Academy of Sciences,Beijing 100080,China);Research on expert evaluation methods in scientific organization[J];Science Research Management;2005-04
4 YANG Bang jie HONG Ren biao CHANG Rui fu JIA Shuan xiang YUN Wen ju (Chinese Academy of Agricultural Engineering,Beijing 100026);Outline on Identification of Risk Factors of Agricultural Investment Prospect[J];TRANSACTIONS OF THE CHINESE SOCIETY OF AGRICULTURAL ENGINEERING;1999-03
5 CHEN Gang, ZHANG Sheng kun (School of Naval Architecture & Ocean Eng., Shanghai Jiaotong Univ., Shanghai 200030, China);Fuzzy Event Tree Calculation of Ship Grounding's Probability[J];Journal of Shanghai Jiaotong University;2002-01
6 ZHAO Li-mei, et al(College of Water Conservancy and Hydropower Engineering, Hohai University, Nanjing 210098, China);Risk analysis on prediction of industrial water requirement in Zhangjiagang[J];Journal of Economics of Water Resources;2004-05
7 Gou Sanquan(School of Management,China University of Mining and Technology,Beijing,100083,China);Review of Risk Analysis of Exploiting Oil Fields[J];Petroleum Drilling Techniques;2007-02
8 Yu Runqiao ,Wang Ping;Analysis of Drilling Risk and Cost Design[J];PETROLEUM DRILLING TECHNIQUES;1995-04
9 ZHONG Deng hua, ZHANG Jian she, CAO Guang jing (School of Construction Engineering,Tianjin University,Tianjin 300072,China);Study on Risk Analysis for Construction Projects Based AHP[J];Journal of Tianjin University;2002-02
10 GUO Yu, LIU Er lie (School of Management,Tianjin University,Tianjin 300072,China);Two Improvements in Risk Analysis for Project Cost Using Monte Carlo Methods[J];Journal of Tianjin University;2002-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved