Full-Text Search:
Home|About CNKI|User Service|中文
Add to Favorite Get Latest Update

Application for network optimization technique in construction claim management

MAO Yi\|hua (Dept. of Civil Engineering, Zhejiang Univ., Hangzhou 310027,China)  
On the basis of the contention and procedures of construction management, the autor discusses the network optimization principles and methods for construction time cost and construction time resources, with actual cost method , make an attempt at obtaining more rational claim funds and modified construction schedules by way of adopting the technique of network optimization in two typical construction claim problems,so as to provide basis and reference for construction enterprises.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved