Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Geological Bulletin of China》 2010-Z1
Add to Favorite Get Latest Update

The geohazard and prevention along PCCP pipeline in Beijing area,China as a section of South-to-North water diversion project

YE Si-yuan1,2,WU Shu-ren11.Institute of Geomechanics,Chinese Academy of Geological Sciences,Beijing 100081,China;2.Beijing municipal institute of hydraulic engineering planning,design & research,Beijing 100044,China  
It's possible to encounter some geohazards during the consctruction of civil linear engineering project,so it's quite important to have a thorough understanding for its damage,features and prevention measures.This paper gives a sample of geological background and geohazard problems analysis of the PCCP pipeline project in beijing area as a part of South-to-North water diversion.It aims to analyze hazard distribution and development characteristics of pipeline construction,and also introduces the geohazard types and how to control geohazards including landslip,special groundwork treatment,ground depression and so on during actual construction.The authors also go into how to analyze and control geohazard in line shape engineering project.
【CateGory Index】: P694
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved