Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Sichuan Building Science》 2006-01
Add to Favorite Get Latest Update

Construction control of prestressed concrete continuous rigid frame bridge with tall pier and thin wall

WU Fang-wen,ZHAO Lei (School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China)  
This paper expatiates the system,technique,content and implying process of the third bridge across the Fujiang analyzes the main factors and key technique that affect construction control.In the process of construction control,measures technical parameters of construction control,compares it with finite-element analyzing results,and gives the parameters of construction control.This method effectively controls the internal force and linearity of bridge and ensures the onstruction quality and safety.
【CateGory Index】: U445.559
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 SHEN Guo-fei1,SUN Sheng-jiang2,SU Fang1,HU Jing-long1(1.College of Water Conservancy and Civil Engineering,Xinjiang Agricultural University,Urumqi 830052,China;2.School of Highway,Chang'an University,Xi'an 710064,China);Simulation Analysis on Construction Control of Long-span Continuous Rigid Frame Bridges[J];Journal of Xinjiang Agricultural University;2009-04
【Citations】
Chinese Journal Full-text Database 1 Hits
1 XIANG Mu?sheng 1, LIU Zhi?xiong 2, ZHANG Kai?yin 1, SHEN Cheng?wu 1 (1 Wuhan University of Technology,Hubei Wuhan 430063,China; 2 Xiangfan Highway Bureau of Hubei Province,Hubei Xiangfan 441000,China);Research on Supervisory Measurement and Control Technique in Long Span Prestressed Concrete Bridge[J];Journal of Highway and Transportation Reseach andk Development;2002-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 HUANG Chun-mei(The Road & Bridge Company in Chuzhou,Chuzhou 239000,China);The application of neural network method in construction control for long-span continual bridge[J];Journal of Anhui Institute of Architecture & Industry(Natural Science);2006-06
2 Wang Hui,Xu Youwei(Chongqing Jiaotong University,Chongqing 400074,China);Analysis of Stress Monitor Error in Thin-walled Box Girder with Large Span[J];Anhui Architecture;2007-02
3 CAO Zhong-hua,WAN Hai-ying(School of Civil Engineering,Hefei University of Technology,Hefei 230009,China);Control analysis in construction of long-span continuous rigid frame bridges[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2008-01
4 ZOU Yi-song,SHAN Rong-xiang School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China;The confirmation closure jacking force of continuous rigid frame bridge[J];Journal of Chongqing Jiaotong University;2006-02
5 CHEN Si-tian,WANG Zhi-peng,LIU Peng,YUAN Yuan(Chongqing Jiaotong University,Chongqing 400074,China);Construction Control of Caiyuanba B Ramp Continuous Rigid Frame Bridge[J];Journal of Chongqing Jiaotong University(Natural Science);2008-01
6 Niu RunMing, Duan ShuJin;Imitative Analysis in Hoisting Course of Arch Ribs of Large-Span Steel Pipe Concrete Arch Bridge[J];Urban Roads Bridges & Flood Control;2004-02
7 Cao Haishun;Construction Control of Dianpuhe Bridge on Caoyu Road[J];Urban Roads Bridges & Flood Control;2005-01
8 Pend Min Zhong Xingu Shu Xiaojuan;Analysis of Construction Control of Large-span Cable-stayed Steel Pipe Concrete Arch Bridge[J];Urban Roads Bridges & Flood Control;2008-01
9 Zhu Jingqiu, Tan Wei;Control and Analysis of Construction Deflection of Large-span Continuous Beam Bridge[J];Urban Roads Bridges & Flood Control;2008-05
10 XU Fuyou1, ZHANG Jianren2, HAO Haixia2(1.Bridge Eng. Dept., Tongji Univ., Shanghai 200092,China; 2.Changsha Communications Univ., Changsha 410076,China);Gray Model GM(1,1,λ) Method for Fitting Relation Curve of Engineering Structure[J];Journal of Changsha Communications University;2003-03
China Proceedings of conference Full-text Database 1 Hits
1 Li Yongbin~1 Zhang Xiedong~1 Cai Jun~2 Xiang Musheng~1 Li Weihua~1 Wang Juan juan~1 (1.School of Transportation,Wuhan University of Technology,Wuhan 430063,China; 2.Communication Planning & Designing Institute of Xiangfan Huhei Province,Xiangfan 441000,China);Research on the Construction Control Technique in Lanxihe Bridge[A];[C];2005
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 GU AN bang,CHANG\ Ying,YUE Yun xiang (Department of Bridge & Structural Engineering,Chongqing Jiaotong Institute,Chongqing 400074,China);The principle and method of construction control long span prestressed continuous rigid frame bridge[J];JOURNAL OF CHONGQING JIAOTONG INSTITUTE;1999-04
2 HEPeng,~1ZHOU Zhi-xiang,~1JI Guo-fu,~2LIANGFan~1 (1.Department Of Bridge&Structure, Chongqing Jiaotong University, Chongqing 400074,China; 2.Highway Survey and Design Institute of Yunnan Province,Yunan 650000,China);Quality of vertical joints in continuous rigid bridges and its influence on the post-construction deflection of the bridges[J];Journal of Chongqing Jiaotong University;2004-01
3 ZOU Yi-song,SHAN Rong-xiang School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China;The confirmation closure jacking force of continuous rigid frame bridge[J];Journal of Chongqing Jiaotong University;2006-02
4 WANG Yun-tao,ZHANG Xue-song,GU An-bang (School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Comment on the Usual Analytical Methods of Long Span PC Continuous Rigid Frame Bridges[J];Journal of Chongqing Jiaotong University;2007-02
5 Zhu Deju(Northeast Forestry University, Harbin 150040, P. R. China); Yu Zhe(Harbin Civicism Second Company);The Altitude Control of Long Span Prestressed Continuous Frame Bridge[J];Journal of Northeast Forestry University;2002-06
6 Zhang Zhongfan, Wang Nan (The Shijiazhuang Highway Bridge Construction Company ,Shijiazhuang,Hebei 050000; Shijiazhuang Railway Engeering Vocational and Technical College, Shijiazhuang, Hebei 050041);The Quality Control of the Concrete and Pre-stress for the Construction of Bridges by Means of Cantilever Casting[J];Traffic Engineering and Technology for National Defence;2003-03
7 ZHAO Ming hua 1,YUAN Teng fang 2,LI Li 1,JIANG De song 1 (1. Civil Engineering College, Hunan University, Changsha 410082, China; 2. Hunan Expressway Administration Bureau,Changsha 410001,China);Computation Study on Safety Thickness of Bearing Rock Strata at Ends of Piles in Karst Region[J];Highway;2003-01
8 Xiao Minggui(Research Institute of Engineering survey and Design, Guilin Institute of Technology));THE ACCEPTANCE OF THE HOLDING POWER LAYER OF HAND-EXCAVATED HOLE PILES OF LARGE DIAMETER IN THE KARST REGION[J];Journal of Guilin Institute of Technology;1997-01
9 JIANG Yang (Dep. of Civil Eng., HuaiAn Institute of Technology, HuaiAn 223001, JiangSu , China);The Review and Prospects for Development Course of Sina-foreign Bridge Engineerings[J];Journal of Huaiyin Industry College;2002-01
10 LI Ya-lin,ZHOU Wei(College of Civil Engineering,Chongqi Jiaotong University,Chongqing 40074,China);The closure jacking force and the performance after jacked of continuous rigid frame bridge[J];Technology & Economy in Areas of Communications;2007-05
【Secondary References】
Chinese Journal Full-text Database 1 Hits
1 SHEN Guo-fei1,SUN Sheng-jiang2,SU Fang1,HU Jing-long1(1.College of Water Conservancy and Civil Engineering,Xinjiang Agricultural University,Urumqi 830052,China;2.School of Highway,Chang'an University,Xi'an 710064,China);Simulation Analysis on Construction Control of Long-span Continuous Rigid Frame Bridges[J];Journal of Xinjiang Agricultural University;2009-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved