Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Sichuan Building Science》 2010-01
Add to Favorite Get Latest Update

Affect analysis of reinforcement-correction design and construction

SUN Jianping,WEI Huanwei,SHAO Guangbiao,JIANG Zongbao(Engineering Identification & Reinforcement Institute of Shangdong Jianzhu University,Ji'nan 250014,China)  
Some measures must be done quickly in the inclined-building correction,the first thing is to construct some foundation-underpinning-pile at the side with more settlement,and the second is to carry out digging-out-soil hole at other side.Its parameters can be adjusted according to the settlement supervision,such as spacing,length and direction.After correction working,the digging-out-soil hole must be fulled by the use of cement liquid.The supervision result shows that the design and construction of the inclined building correction is successful.
【CateGory Index】: TU196.2;TU746.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved