Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Sichuan Building Science》 2013-01
Add to Favorite Get Latest Update

Numerical calculated the 3D temperature field of concrete with conjugated conduction method

LU Yulin1,LIANG Yongduo2,YU Gaihua1,LI Wenqian1,WANG Li1(1.Institute of Disaster Prevention,Beijing 101601,China; 2.Institute of Engineering Mechanics,China Earthquake Administration,Haerbin 150001,China)  
A finite element method was developed to investigate the effects of a water-cooling pipe on the temperature distribution during the concrete curing age.The water flow field and the concrete temperature field characteristics distributed on the bending pipe was obtained,and the Nusselt convective coefficient numbers distributed alone the pipeline also was analyzed by calculating the conjugated heat transfer between the water pipe and the concrete.The results indicated that the temperature distribution which calculated by two methods were similar,the temperature of conjugated conduction method obviously was higher than the results of the approximate method,and the maximum temperature error was 0.8℃.Although the conjugated method had a long calculation time,the numerical results showed that this method could be reflect the temperature field was affected with the dynamic water flowing in the factual concrete hydration process.
【Fund】: 防灾减灾青年科技基金(201002);; 中国地震局教师科研基金(20100106)
【CateGory Index】: TU528.01
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 2 Hits
1 WANG Jiachun,YAN Peiyu(Department of civil engineering Tsinghua Universtiy,Beijing 100084,China);Analyzing of Cracking Risk of Early-age Concrete Structure[J];Journal of Basic Science and Engineering;2006-02
2 WANG Jiejun,LI Hui,LU Erxia(College of Civil Engineering,Hunan University,Changsha,Hunan 410082,China);The finite element analysis of concrete temperature field with water pipe cooling for bridge[J];Journal of Central South Highway Engineering;2006-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Li fu-min(Xuzhou Institute of Engineering (Preparatory)Pengcheng Vocational College,Xuzhou China);Status Quo and Problems of Concrete Structures Temperature and Shrinkage Cracking Control[J];;2002-04
2 LIU Lai-jun~1, CHEN Yue~2 (1. College of Highways, Chang'an University, Xi'an 710064, China; 2. Yunnan Kunrui Expressway Co., Ltd., Kunming 650032, China);Construction Control of Dali-Baoshan Expressway Continuous Rigid-Frame Bridge in Yunnan[J];Bridge Construction;2004-06
3 YAN Chang-qing,YANG Xian-quan(Wuhan Zhongjiao Testing,Inspection and Strengthening Engineering Co.,Ltd.,Wuhan 430052,China);Analysis of Transverse Temperature Stress of Concrete Thin-Wall Box Girder[J];Bridge Construction;2009-03
4 ZENG Yong-ping1,CHEN Si-xiao1,CHEN Ke-jian1,CHEN Tian-di1,ZHANG Liang-liang2(1.China Railway Tieeryuan Engineering Group Co.,Ltd.,Chengdu 610031,China;2.Chongqing University,Chongqing 450045,China);Test Study of Temperature and Stress Fields of Railway Bridge Hollow Piers Under Action of Cold Wave[J];Bridge Construction;2011-01
5 Zhang Feng,Xiao Jianzhuang,Song Zhiwen (Department of Building Engineering,Tongji University,Shanghai 200092,China);The prediction models of thermal conductivity of concrete and their application[J];Ready-Mixed Concrete;2009-02
6 HAN Da-jian1,TAN Yi-ping1,2 (1.State Key Lab.of Subtropical Building Sci.,Dept.of Civil Eng.,South China Univ.of Technol.,Guangzhou 510640,China;2.Guangzhou Inst.of Measurement and Testing,Guangzhou 510663,China);Temperature Variation in Pre-stressed Concrete Single-cell Box-girder Bridges[J];Journal of Sichuan University(Engineering Science Edition);2008-06
7 ZHU Chun-mei1,WANG You-zhi2,XU Yao1(1.School of Civil Engineering and Architectural,University of Jinan,Jinan 250022,China;2.School of Civil Engineering,Shandong University,Jinan 250061,China);Real-Time Monitoring and Finite Element Simulation of Concrete Temperature Field of Qingyin Huanghe Bridge[J];Journal of University of Jinan(Science and Technology);2011-01
8 LI Daoshan WEI Yongsheng(Guoan Construction Group Corporation Limited of Henan Province,Luoyang 471023,China);Cause and Control Measures of Temperature Crack for Temporary Overflow Cross-section of Concrete Dam[J];Water Resources and Power;2010-01
9 LIU Youzhi~1,ZHU Yueming~2,ZHANG Guoxin~1(1 China Institute of water resources and hydropower research,Beijing 100038; 2.College of Water Conservancy & Hydroelectric Engineering,Hehai Univ,Nanjing 210098);Analysis of real temperature stress characteristic and crack mechanism in pier-wall concrete based on in-situ test[J];Journal of Hydroelectric Engineering;2008-05
10 WEN Zhu\|yin 1, CHEN Bao 2 (1 Shanghai Municipal Engineering Design Institute, Shanghai 200092,China;2 Tongji University, Shanghai 200092,China);Crack Analysis and Waterproof Techniques Research for Subway Stations[J];Construction Technology;2002-03
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 Zhu Bofang(Institute of Water Conservancy & Hydroelectric Power Research)Cai Jianbo(North China College of Water Conservancy & Hydroelectric Power);Finite Element Analysis of the Effect of Pipe Cooling in Concrete Dams[J];Journal of Hydraulic Engineering;1985-04
2 ZHU Yue ming 1, ZHANG Jian bin 2 (1 Hohai University, Nanjing 210098, China; 2 Xiamen Road & Bridge Construction Investment Co. Ltd., Xiamen 361009, China);Study on application of water cooling pipe measures to RCCDs' thermal control during continuous construction in high-temperature seasons[J];Journal of Hydraulic Engineering;2002-11
3 WANG Jiejun,LIANG Jinfeng,WANG Mingming(Hunan University,Changsha,Hunan 410082,China);Temperature Analysis for Construction of Supporting Terraces in Continuous Frame Bridge[J];Central South Highway Engineering;2005-04
4 WANG Jiejun,LI Hui,LU Erxia(College of Civil Engineering,Hunan University,Changsha,Hunan 410082,China);The finite element analysis of concrete temperature field with water pipe cooling for bridge[J];Journal of Central South Highway Engineering;2006-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved