Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Sichuan Building Science》 2013-02
Add to Favorite Get Latest Update

Study and practice on construction monitoring for prestressed concrete continuous beam bridge based on cantilever pouring

LIU Peng,CHEN Mengcheng,CHENG Haigen(College of Civil Engineering and Architecture,East China Jiaotong University,Nanchang 330013,China)  
Construction of long span continuous beam bridge with cantilever pouring are more involved in much uncertain factor.To supervision of the construction process is an effective measure to ensure a smooth closure of such a bridge.Practice with specific projects,elaborated the strategy,method and process of construction monitoring for long span continuous beam bridge.Specified many details about temperature corrected,stress calculated and elevation determined for the construction segment,which will provide technical support to the same types of projects for the future.
【Fund】: 江西省自然科学基金项目(2007GZC0860)
【CateGory Index】: U445.466
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 2 Hits
1 Zhou Feng,Wang Huidong(Civil Engineering School,Shjiazhuang Railway Institute,Shjiazhuang 050043,China);Study and Practice on Construction Monitoring of Cantilever Construction for Long Span Continuous Box-section Beam[J];Journal of Shijiazhuang Railway Institute(Natural Science);2009-02
2 Peng Guorong,Hu Yubin,Meng Zhaohui;Line Shape Control of Prestressed Continuous Box Girder in Cantilevered Construction[J];Municipal Engineering Technology;2010-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Wang Yu-tian,Ma Pei-jian,Zhang Wei,Jiang Fu-xiang (School of Civil Engineering,Qingdao Technological University,Qingdao 266033);Monitoring Technology of Construction on Certain Especially Big Bridge with Half-Rigid Structure and Continuous Box Girder[J];Journal of Qingdao Technological University;2006-04
2 ZHENG Li 1a,GE Guang-zong2,TANG Chun-yan 1b (1.a.Civil Architectural Design Institute Co.Ltd;b.School of Civil Engineering,Dalian University of Technology,Dalian 116024,China;2.Eighth Engineering Division of China Construction,Weifang 261041,China);Construction Control of Extradosed Cable-Stayed Bridge[J];Journal of Qingdao Technological University;2010-02
3 CHEN Jian yang 1, XIANG Mu sheng 2, GUO Feng xiang 3, SHEN Cheng wu 2 (1. Hubei Provincial Jingzhu Expressway Project Headquarters, Wuhan 430030, China; 2. Wuhan University of Technology, Wuhan 430063, China; 3. Communication Planning & Desig;Nerval Network Method in Construction Control for Long-span Bridge[J];Bridge Construction;2001-06
4 ZHANG Zhe, DU Peng juan, HUANG Cai liang (Department of Civil Engineering, Dalian University of Science and Technology, Dalian 116024, China);Design and Construction of Gonghe Cable-stayed Bridge[J];Bridge Construction;2002-01
5 OUYANG Yong jin, WU Li qing (Xiamen Municipal Administration Construction Headquarters, Xiamen 361012, China;Construction Control of Single Pylon Single Cable Plane Single Row Prestressed Concrete Extradosed Cable-stayed Bridge[J];Bridge Construction;2002-06
6 XU Yufeng1, SU Cheng1, WANG Wei\|feng2,HAN Da\|jian1(1. Department of Civil Engineering, School of Architecture, South China University of Technology, Guangzhou 510640, China; 2. School of Communications, South China University of Tcchnology, Guangzhou 510640, China);Calculation and Analysis of Shrinkage and Creep Effect of Yamen Bridge[J];Bridge Construction;2003-01
7 YUAN Haiqing1, ZHOU Qiangxin1, BAI Yinghua2(1. Institute of Civil Engineering and Architecture, Wuhan University of Technology, Wuhan 430070, China; 2. Hubei Institute of Technology, Wuhan 430064, China);Visual Implement of Construction Simulation Computation for Concrete-Filled Steel Tubular Arch Bridges[J];Bridge Construction;2003-05
8 TIAN Qi-xian, YUAN Jian-xin, WANG Jie-zao (Bridge Science Research Institute Ltd., China Zhongtie Major Bridge Engineering Group, Wuhan 430034, China);Construction Monitoring and Control of Fumin Bridge in Shenyang[J];Bridge Construction;2004-03
9 LI He-nian~1, PENG Xu-min~2, FU Wen-sheng~2 (1. Liuzhou Municipal Urban Investment, Construction and Development Co., Ltd., Liuzhou 545001, China; 2. Bridge Science Research Institute Ltd., China Zhongtie Major Bridge Engineering Group, Wuhan 430034, China);Construction Control for Main Cables of Hongguang Bridge in Liuzhou[J];Bridge Construction;2004-03
10 LIU Lai-jun~1, CHEN Yue~2 (1. College of Highways, Chang'an University, Xi'an 710064, China; 2. Yunnan Kunrui Expressway Co., Ltd., Kunming 650032, China);Construction Control of Dali-Baoshan Expressway Continuous Rigid-Frame Bridge in Yunnan[J];Bridge Construction;2004-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved