Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Underground Space》 2003-01
Add to Favorite Get Latest Update

Simulation of PERT in Design of Construction Management for Underground Engineering

HAO Yu long et al(9)  
The design of construction management in underground engineering is a complicated multifactor system. In this paper, how to simulate a PERT network model of construction schedule with computer is described in order to get the probability distribution of project time limit, working procedure on critical path etc, which can be used to arrange a project with the shortest time and resources.
【CateGory Index】: TU721
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 SHI Wei,HUANG Jin-zhi (School of Civil Engineering and Mechanics Shanghai Jiaotong University,Shanghai200030,China);Application of computer technology in modern construction[J];Building Science Research of Sichuan;2003-04
2 Yue Yuxi (Fuyang Institute of Architectural Design and research,Fuyang,236001) Wang Shenglan (Anhui Institute of Traffic Science and Research,Hefei,230001);RESOURCE OPTIMIZATION OF NET-PLANNING TECHNIQUE AND ITS APPLICATION IN ENGINEERING[J];JOURNAL OF ANHUI INSTITUTE OF ARCHITECTURE;2000-04
3 Zhang Jiashan, Zhang Benfu (Auhui Institute of Architecture, Hefei,230022);THE ANALYSIS OF TIME-PARAMETER ABOUT BUILDING ASSEMBLY LINE CONSTRUCTION[J];JOURNAL OF ANHUI INSTITUTE OF ARCHITECTURE;1997-03
4 YI Xiao-bin,SHAN Yan-jun(Tianchang Water Power Construction and Installation Company of Anhui Province, Tianchang 239300, China);Application of information technique to construction management[J];Journal of Anhui Technical College of Water Resources and Hydroelectric Power;2004-04
5 Ji jie (Beijing Institute of Civil Engineerig and Architecture, Beijing 100044)Hu Changshun (Xi'an Highway University, xi'an 710064);The Heuristic Algorithms of Resource optimization in Highwoy Construction Organization[J];JOURNAL OF BEIJING INSTITUTE OF CIVIL ENGINEERING AND ARCHITECTURE;1999-02
6 LI Xian jin JIAO Jie ( Guangdong No. 3 Construction Engineering Company, Guangdong,510070);Application of Internet Planning Technology in Construction Management[J];JOURNAL OF CHONGQING JIANZHU UNIVERSITY(SOCIAL SCIENCE EDITION);2001-02
7 ZHAO Hui 1,ZHANG Hong yun 2(1.Highway Management Bureau of Pingdingshan City,Pingdingshan 467000,China 2.Henan Edncation service Center,Zhengzhou 450002,China);Application of Johnson-Belman law in line production[J];Journal of Henan Urban Construction Junior College;2001-03
8 LONG Li(Hunan Zhongda Design Institute Company Limited,Changsha 410075,China);Sub-engineering fee monte-carlo simulation method based on RBF neural network forecast[J];Journal of Railway Science and Engineering;2009-02
9 LI Cheng-ling (Suixi County Construction Committee,Suixi 235100,China);The Management Information System Transports In the Engineering Project Cost Management[J];Computer Knowledge and Technology;2006-23
10 FAN Xue-yi, ZHAO Jin-cheng(Department of Civil Engineering, Shanghai Jiaotong University, Shanghai 200240,China);ENGINEERING PROJECT MANAGEMENT INFORMATION SYSTEM BASED ON WEB[J];Low Temperature Architecture Technology;2005-01
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 WANG Ying-lei, XU Zhe (School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100083);A Analysis of the Huge Engineering Project's Combined Risk of Schedule and Cost[J];Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition);2000-04
2 Ji jie (Beijing Institute of Civil Engineerig and Architecture, Beijing 100044)Hu Changshun (Xi'an Highway University, xi'an 710064);The Heuristic Algorithms of Resource optimization in Highwoy Construction Organization[J];JOURNAL OF BEIJING INSTITUTE OF CIVIL ENGINEERING AND ARCHITECTURE;1999-02
3 Yang Chunde;Zhou Zhongfang(Department of Basic Sciences);Analysis of Fuzzy Network FCPM Method[J];JOURNAL OF CHONGQING UNIVERSITY OF POSTS AND TELECOMMUNICATIONS;1994-01
4 Dai Huichao (China Three Gorges Project Corporation, Yichang 44300) Tian Bin (Wuhan University of Hydraulic and Electric Engineering, Yichang 443002);Study and Application of 3 D Simulation to Construction Process of River Closure in TGP’s Main Channel[J];JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE;1998-01
5 WANG Shou-xu,\ ZHOU Xue-lin (Department of Highway & Bridge Engineering,Changsha Communication Un iversity,Changsha 410076,China);Optimization of multiobjective resource leveling using genetic algorithms[J];Journal of Chongqing Jiaotong Institute;2001-02
6 JIANG Gen-mou(School of Civil and Architectural Engineering, East China Jiaotong University, Nanchang 330013, China);Determining the optimal project construction schedule with rsource-based precedence relationships under multiple resource constraints[J];;2005-03
7 ;Study on Plan Control System of Project Item[J];Northeastern Highway;2003-02
8 Jin Yi; Da Qingli; Xu Nanrong; Hou Zhiling(Institute of System Engineering, Southeast Universyty,Nanjing 210018);Study of Production Schedule Program with Fuzzy Finishing Time[J];JOURNAL OF SOUTHEAST UNIVWRSITY;1994-06
9 Liu Xinwang Da Qingli (Institute of Systems Engineering, Southeast University,Nanjing 210018);Fuzzy Critical Path Approximation Method[J];Journal of Southeast University;1997-05
10 ;Optimized Configuration Method of Road Construction Machinery Resources Based on Multiple Objective Functions (Part I)[J];Construction Machinery and Equipment;2003-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved