Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Chinese Journal of Underground Space and Engineering》 2013-01
Add to Favorite Get Latest Update

Analysis and Research on Laboratory Model Test for Twin-tunnel under Unsymmetrical Pressure

Tian Longgang1,Duan Qunmiao2,Xu Qianwei3,Cai Yongchang1(1.Department of Geotechnical Engineering,College of Civil Engineering,Tongji University,Shanghai 200092,China; 2.Ningbo Communication Engineering Construction Group Co.,Ltd,Ningbo,Zhejiang 315000,China; 3.School of Transportation Engineering,Tongji University,Shanghai 200092,China)  
It is an effective way to conduct laboratory model tests to study on the deformation character and pressure pattern of twin-tunnel surrounding rock.Based on the 1:50 laboratory model test of a highway twin-tunnel,we get the material mixture ratios of the tunnel surrounding rock and tunnel first lining and middle wall by fast direct shear tests and uniaxial compressive tests.The mixture ratio of Grade Ⅳ wall rock is: Barite powder: sand: paste(water: wheat starch=1 000 ∶50) =12 ∶2 ∶2.1;the mixture ratio of the tunnel first lining and middle wall is: Water: gypsum: barite powder = 0.65:1:0.06.The model tunnel excavation and middle wall construction are carried out after the tunnel materials are compounded based on the above mixture ratios.A comparison of numerical simulation and model test is made,and the results indicate that our mixture ratios can commendably simulate the mechanical behavior of twin-tunnel and can be applied in the laboratory model test well.
【Fund】: 长江学者和创新团队发展计划资助(IRT1029)
【CateGory Index】: U451.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 6 Hits
1 ZHOU Sheng-guo 1 , HUANG Lun-hai 2 , JIANG Shu-ping 2 , LIU Xin-rong 3 (1.Department of Structure Engineering, Chongqing Jiaotong University,Chongqing 400074,China; 2.Chongqing Highway Institute of Communications Ministry. Chongqing 400067,China; 3. College of Civil Engineering,Chongqing University, Chongqing 400045,China);Study on the Reasonable Construction Method for a Loess Double-arch Highway Tunnel[J];;2005-02
2 XIAO Lin-ping,ZHAO Yu-guang,SHEN Yu-sheng(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);MODEL EXPERIMENTAL STUDY ON STYLE OF STRUCTRUAL INTERNAL FORCE AND STABILITY OF SURROUNDING ROCK IN DOUBLE-ARCH TUNNEL[J];Chinese Journal of Rock Mechanics and Engineering;2005-23
3 LIU Tao1,2,SHEN Mingrong1,2,TAO Lubin1,2,HE Zhimin1,2,YUAN Yong1,2(1.Key Laboratory of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.School of Civil Engineering,Tongji University,Shanghai 200092,China);MODEL TEST AND 3D NUMERICAL SIMULATION STUDY ON EXCAVATION OF DOUBLE-ARCH TUNNEL[J];Chinese Journal of Rock Mechanics and Engineering;2006-09
4 YAN Zongxue1,2,FANG Yingguang1,LIU Tingjin1(1.State Key Laboratory of Subtropical Building Science,South China University of Technology,Guangzhou,Guangdong 510641,China;2.Guangzhou Highway Development Corporation,Guangzhou,Guangdong 510080,China);EFFECT OF STRESS PATH ON SURROUNDING ROCK PRESSURE OF SUPER LARGE-SECTION TUNNEL[J];Chinese Journal of Rock Mechanics and Engineering;2009-11
5 ZHU Hehua 1,2,HUANG Feng 1,2,XU Qianwei 1,3(1.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China;2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;3.School of Naval Architecture,Ocean and Civil Engineering,Shanghai Jiaotong University,Shanghai 200030,China);MODEL TEST AND NUMERICAL SIMULATION FOR PROGRESSIVE FAILURE OF WEAK AND FRACTURED TUNNEL SURROUNDING ROCK UNDER DIFFERENT OVERBURDEN DEPTHS[J];Chinese Journal of Rock Mechanics and Engineering;2010-06
6 QU Hai-feng,ZHU He-hua,CAI Yong-chang1,3(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Shanghai Investment Consulting Corporation,Shanghai 200003,China;3.Key Laboratory of Geotechnical Engineering,Tongji University,Shanghai 200092,China);Discussion on calculation of loose load on extra-large cross-section and large-span road tunnel[J];Rock and Soil Mechanics;2008-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 WANG Hao(Chengdu Dadi Engineering Development Limited Company,Chengdu 611731,China);Analysis on characteristics of surrounding rock displacement of karst cave tunnel during construction process[J];Sichuan Building Science;2011-02
2 ZHANG Xiang-yang,GU Jin-cai,SHEN Jun,CHEN An-min(The Third Scientific Research Institute of the Corps of Engineers of PLA,Luoyang 471023,China);Model Test on the Tunnel Reinforced by Prestressed Anchor Cable[J];Chinese Journal of Underground Space and Engineering;2006-02
3 YAO Hui-fa1 LIU Xin-rong2 ZHONG Zu-liang2 YI Li2(1.Shanxi Design Institute of Communication,Taiyuan 030012,P.R.China;2.College of Civil Engineering,Chongqing University,Chongqing 400045,P.R.China);Discussion About Construction Schemes of Multi-Arch Loess Tunnel[J];Chinese Journal of Underground Space and Engineering;2007-04
4 HUANG Yang-shou1,LIU Xin-rong2,ZHONG Zu-liang2,YUAN Fei2(1.Shanxi Design Institute of Communication,Taiyuan 030012,P.R.China;2.College of Civil Engineering,Chongqing University,Chongqing 400045,P.R.China);Study on Design Skill of Loess Multi-arch Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-05
5 Lu Ke,Zhu Jincai,Yang Jinchao (Northwest Institute of Nuclear Technology,Xi'an 710024,China);Study on the Failure of Tunnel by the Geomechanic Model Experiment[J];Chinese Journal of Underground Space and Engineering;2012-03
6 XU Lin-sheng (School of Civil Engineering & Architecture,Chongqing Jiaotong University,Chongqing 400074,China);Numerical Simulation Study on Step Excavation Construction of Caishenliang Tunnel[J];Journal of Chongqing Jiaotong University(Natural Science);2008-04
7 He Pengfei;Discussion on Action of Field Monitoring and Analyzing in tunnel Construction[J];Urban Roads Bridges & Flood Control;2010-08
8 LEI Jin-shan1,YANG Jun-sheng1,ZHOU Can-lang2,SU Wei1,YANG Xiu-zhu1(1.School of Civil and Architectural Engineering,Central South University,Changsha 410075,China;2.Guangzhou Metro Design Academe,Guangzhou 510010,China);Study on simulating material test of karst geological model of Guangzhou railway traffic[J];Journal of Railway Science and Engineering;2007-06
9 WANG Song-zhou,FU He-lin,CAO Qi,LIU Yun-si(School of Civil Engineering,Central South University,Changsha 410075,China);Excavation optimization based on unloading and span-cut mechanism for large-span tunnel[J];Journal of Railway Science and Engineering;2012-01
10 LIAO Yi1,FU Wen-xi1,YANG Dun-cai2(1.School of Water Resource and Hydropower,Chengdu 610065,China;2.China Hydraulic and Hydroelectric Construction Group Corporation,Engineering Bureau 5,Chengdu 610066,China);NUMERICAL SIMULATION ANALYSIS ON THE CONSTRUCTION METHODS OF A MULT-ARCH ROAD TUNNEL IN WEAK SURROUNDING ROCKS[J];Journal of Geological Hazards and Environment Preservation;2008-04
China Proceedings of conference Full-text Database 2 Hits
1 WANG Shao-qiang~1,QIAO Chun-sheng~2,XU Gan-cheng~3,ZHU Zheng-guo~2 (1.Anhui Provincial Communications Investment Group Co.Ltd.,Hefei 230011,China; 2.School of Civil Engineering and Architecture,Beijing Jiaotong University,Beijing 100044,China; 3.Air Force Engineering Design and Research Bureau,Beijing 100077,China);Deformation and stress distribution of middle-wall for asymmetrically-loaded double-arch tunnel under complicated geological conditions[A];[C];2007
2 WU Ba-tao~(1,2,4) ZHU He-hua~(1,2),XU Qian-wei~(1,2,3),MING Juan~5 (1.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,,Tongji University,Shanghai 200092,China;2.Department of Geotechnical Engineering,College of Civil Engineering,Tongji University,Shanghai 200092,China;3.Urban Rail Transit and Railway Engineering Department,Tongji University,Shanghai 200092,China;4.Hydraulic Construction Institute,Vietnam Academy for Water Resources,Hanoi,Vietnam; 5.Department of Civil Engineering,University of Shanghai for Science and Technology,Shanghai 200093,China);Experimental study of similar material for weak surrounding rock mass of class Ⅳ[A];[C];2013
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Tong,LIU Wei,LIU Xindong(School of Science,Xi'an University of Architecture and Technology,Xi'an 710055,China);Numerical analysis of construction process for four-lane section tunnel[J];Sichuan Building Science;2007-03
2 ZHOU Yu-hong et al;Monitoring and Measuring in the Construction of Qiaotou Tunnel of Yuanmo Expressway[J];Underground Space;2002-02
3 HUANG Lun-hai et al;Model Test on Single Four-lane Highway Tunnel Excavation[J];Underground Space;2004-04
4 CHEN Qiu-nan 1, 2 , ZHANG Yong-xing 1 , LIU Xin-rong 1 , BAO Tai 1(1. College of Civil Engineering, Chongqing University, Chongqing 400045, China;2. College of Civil Engineering, Hunan University of Science and Technology, Xiangtan 411201, Hunan, China);Research on Design Theory and Dynamic Construction Mechanics for Double-arch Highway Tunnel[J];;2005-01
5 LI Zhi-gang1,DING Wen-qi1,YANG Chong-cun1,WANG Xiao-xing2,XIE Dong-wu1(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,P.R.China;2.Shanghai Tongyan Civil Engineering Technology Co.,Ltd,Shanghai 200092,P.R.China);Simulation and Analysis of Core Rock in Flat and Large Span Highway Tunnel[J];Chinese Journal of Underground Space and Engineering;2007-04
6 SHEN Tai (Yangtze River Scientific Research Institute,Wuhan 430010,China);Development of geomechanic model experiment techniques[J];Journal of Yangtze River Scientific Research Institute;2001-05
7 Zhou Xiaowen, Pu Jialiu (Tsinghua University, Beijing, 100083) Bao Chenggang (Yangtze River Scientific Research Institute, Wuhan 430010);Study on Stability Mechanism and Relaxed soil Pressure in Sandy Soil during Excavation[J];JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE;1999-04
8 ZHAO Ming-jie; XU Rong(Dept. of Ocean & River Engineering, Chongqing Jiaotong Institute, Chongqing 400074, China)(Dept. of Educational Adrninistration, Chongqing Jiaotong Institute, Chongqing 400074);The present situation and prospect of the acoustic properties research in rock[J];JOURNAL OF CHONGQING JIAOTONG INSTITUTE;2000-02
9 WAN Ming-fu1,HAI Hong2,LIU Bin1(1.School of Resources & Civil Engineering,Northeastern University,Shenyang 110004,China;2.School of Civil Engineering,Shenyang Jianzhu University,Shenyang 110168,China.);Investigation on Excavating a 4-Lane Road Tunnel Through Indoor Model Test[J];Journal of Northeastern University(Natural Science);2007-02
10 LIU Gui ying 1,WANG Yu xing 2,CHENG Jian ping 1 LI Peng 1,LI Xue dong 1 (1.China University of Geosciences,Wuhan Hubei 430074,China; 2.No.3 Company of No.12 Bureau,Chinese Railway Ministry,Taiyuan Shanxi 030024,China);STRUCTURE ANALYSIS AND WORKING OPTIMIZATION OF THE DOUBLE-ARCH TUNNEL OF THE EXPRESSWAY[J];Geological Science and Technology Information;2003-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved