The Key Technology of Super Large Diameter Shield Tunnel

Zhang Boyang(CCCC Tunnel Engineering Co.,Ltd.Beijing 100088,China)  
The Φ14.93m slurry shield of river crossing channel for Nanjing Weisan Road has successfully originating.This project is located between Nanjing Yangtze River Bridge and Nanjing Yangtze river tunnel which has been opened to traffic.This is the fourth river crossing tunnel under Yangtze River.It is of large diameter,under high water pressure,located at the place with complex geological conditions,some sections of the tunnel should pass through composite strata soft above and hard below and the construction risk is big.The sections crossing the river take an X form of cross and inside the tunnel is a single tube with double layer structure.The section crossing the river was constructed with mud pressure balanced shield machine,which could drive long distance for one time.The shield originating is the key technology of shield tunnel construction.It contains a lot of thoughtful and meticulous works.This article focus on all kinds of preparation works before the shield originating and summarizes the key technology of shield originating for river crossing tunnel of Weisan Road in Nanjing.This can provides reference for the similar projects in future.
【CateGory Index】: U455.43
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 10 Hits
1 XIN Zhen-xing,WANG Jin-an,MA Hai-tao,PENG Jia-qiang(Civil & Environment Engineering School,Beijing University of Science and Technology,Beijing 100083,China);Study on Rational Scope of Pre-Reiforcement at Starting Position for Shield Excavation[J];Chinese Journal of Underground Space and Engineering;2007-03
2 SONG Tian-tian1, ZHOU Shun-hua1,XU Run-ze2(1.Key Laboratory of Road and Traffic Engineering of the Ministry of Education,Tongji University,Shanghai 200092,China;2.China Railway 13th Bureau Group Co.,Ltd.,Changchun 130033,China);Mechanism and Determination of Parameters of Synchronous Grouting in Shield Tunneling[J];Chinese Journal of Underground Space and Engineering;2008-01
3 LI Gang1,HUANG Hong-wei1(Department of Geotechnical Engineering,College of Civil Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Analysis on Arriving into Shaft of Super Large Diameter Shield Machine under Water[J];Chinese Journal of Underground Space and Engineering;2009-S1
4 Kang Jie(Shanghai Foundation Engineering Co.,Ltd.Shanghai 200438,China);Shield Launching Sealing Technology for the 11.58 m Diameter Slurry Shield TBM[J];Chinese Journal of Underground Space and Engineering;2011-05
5 Jin Shi-he;Type selection of shield machine of NanJing Yangtze River Tunnel[J];Construction Machinery;2007-19
6 YU Peng-tao (Construction and Administration Bureau of South-to-North Water Diversion Middle Route Project, Jiaozuo 454850, China);Starting up Construction Technology with Shield Machine in the Yellow River Crossing Tunnel of the Middle Route Project of South-to-North Water Diversion[J];South-to-North Water Transfers and Water Science & Technology;2008-04
7 Li Zhanglin Dai Shimin Huang Dezhong;The Shield Move-Out Construction Technique for Shangzhong Rd Tunneling Engineering[J];Shanghai Construction Science & Technology;2006-04
8 YU Xuanping SHEN Yongdong LING Yufeng et al;Shield Construction Technique for Shanghai Changjiang Tunnel Project[J];Shanghai Construction Science & Technology;2007-04
9 Zhang Gongshe(China Railway 14th Bureau Group Co. Ltd.,Ji’nan 250014,China);Launching Technology of Super-diameter Slurry-pressure-balance TBM[J];Railway Construction Technology;2009-08
10 HU Bin, LI Yong jun(China Railway Tunnel Group Co., Ltd., Luoyang, Henan 471009, China);The Starting Techniques of Shield Method at Wuhan Yangtse River Tunnel[J];Soil Engineering and Foundation;2008-02
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Fang Yingang,Zhu Hehua,Yan Zhiguo(Geotechnical and Underground Engineering of Tongji University,Key Laboratory of Geotechnicaland Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092,China);Research of Evacuation and Rescue Measures in Shanghai Yangtze River Tunnel[J];Chinese Journal of Underground Space and Engineering;2010-02
2 Yang Fangqin1,2,Duan Chuangfeng3,Wu Huaqi2,Yuan Yong1(1.Department of Geotechnical Engineering,School of Civil Engineering,Tongji University,Shanghai 200092;2.Shanghai Yangtze River Tunnel and Bridge Construction and Development Co.,Ltd.,Shanghai 201209;3.Shanghai Tunnel Engineering Co.,Ltd,Shanghai 200082);Model Experiment and Theoretical Study on Stability against Uplift of Shanghai Yangtze River Tunnel[J];Chinese Journal of Underground Space and Engineering;2010-03
3 Xiao Li1,2,Zhang Qinghe1,2,Zhao Tianshi3,Yang Junlong4,Yang Guanghui4(1.Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education,Tongji University,Shanghai 200092, China;2.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;3.Poly Real Estate Group Co.,Ltd.,Guangzhou 510623,China;4.Shanghai No.2 Municipal Engineering Co.,Ltd.,Shanghai 200065,China);Study on Mortar Material of Tail Void Grouting in Slurry Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2011-01
4 Kang Jie(Shanghai Foundation Engineering Co.,Ltd.Shanghai 200438,China);Shield Launching Sealing Technology for the 11.58 m Diameter Slurry Shield TBM[J];Chinese Journal of Underground Space and Engineering;2011-05
5 Li Peng1,Du Shouji1,Liu Yanbin2(1.School of Naval Architecture,Ocean and Civil Engineering,Shanghai Jiaotong University,Shanghai 200240,China; 2.Shanghai Bund Area Comprehensive Transportation Improvement Project Construction Headquarters,Shanghai 200010,China);Analysis on Influence of Subway Shield Tunnel Construction on Overlying Cross-River Tunnel[J];Chinese Journal of Underground Space and Engineering;2011-06
6 Yan Bo1,2,Yang Guolong2,Lin Hui3,Lin Peiyuan1,Wu Wenbiao3(1.Sun Yat-Sen University,Guangzhou,510275,China;2.Guangdong Provincial Academy of Building Research, Guangzhou,510500,China;3.Second Board Co.,Ltd.of Guangdong Hydropower,Guangzhou,510663,China);Reasearch on Shield Tunneling Parameters Optimization and Surface Subsidence Control[J];Chinese Journal of Underground Space and Engineering;2011-S2
7 Ling Yufeng;Shanghai Changjiang Tunnel Engineering Building and Construction Risk Control[J];Urban Roads Bridges & Flood Control;2010-09
8 LIU Ling-yun1,YANG De-lei1,2,GUO Hai-zhu3 (1.Department of Building Engineering,Huanghuai University,Henan Zhumadian 463000,China;2.School of Civil Engineering,Tongji University,Shanghai 200092,China;3.Shenzhen Metro Ltd.,Guangdong Shenzhen 518026,China);RISK ANALYSIS OF TUNNEL SHIELD MACHINE DRIVING-IN AND DRIVING-OUT CONSTRUCTION PROCESS IN TUNNELLING ENGINEERING[J];Low Temperature Architecture Technology;2010-08
9 LUO FuRong①② JIANG Yusheng③ JIANG Hua③(①School of Civil Engineering,Beijing Jiao tong University,Beijing 100044)(②Beijing MTR Construction Administration Corporation,Beijing 100037)(③School of Mechanics and Civil Engineering,China University of Mining & Technology,Beijing 100083);THEORETICAL MODELING and Sensitivity analysis OF IMPROVED Sandy STRATA AT TBM PORTAL AREAS with STRENGTH AND STABILITY THEORIES[J];Journal of Engineering Geology;2011-03
10 Yang Chun-shan1,Wu Zeng-wei2,Zhang Ya-ning1(1.Faculty of Civil and Transportation Engineering,Guangdong University of Technology,Guangzhou 510006,China; 2.Guangzhou Metro Design and Research Institute Co.,Ltd,Guangzhou 510010,China);Numerical Analysis of Grouting Hardening Process of Shield Tunneling[J];Journal of Guangdong University of Technology;2011-04
China Proceedings of conference Full-text Database 5 Hits
1 (Ningxia Yinchuan City Fire detachment 750,001);Study on Simulated Flue and Gas Safety for Shanghai Yangtze River Tunnel Construction Shield Slurry Machine[A];[C];2008
2 Jingshun QIAO~1 DeleiYANG~1 Huawei LIU~1 Haizhu GUO~2 Lingyun LIU~1 Zhigang JIA~1 1 Department of Building Engineering,Huanghuai University,Zhumadian 463000,China 2 Shenzhen Metro Ltd.,Shenzhen 518026,China;Risk Analysis of Tunnel Shield Machine Driving-in and Driving-out Construction Process in Zhengzhou Subway Engineering[A];[C];2010
3 SI Xiang-Yu YANG Ping SHAO Guang-hui ZHENG Jia-zhu XIA Jiang-tao (Construction Institute of Nanjing Forestry Univ,Nanjing Jiangsu 210037,China);Site Monitoring Research on Ground Surface Subsidence of Tunnel Induced by Shield Construction Parameters[A];[C];2008
4 Liang, Zheng-Kai Railway Tunnel Group Hangzhou Branch,Hangzhou;Composite Saturated Clay Layer Shield and Floating Control[A];[C];2012
5 Hao Runxia (Architecture and Civil Engineering School,Inner Mongolia University of Science and Technology,Baotou,Inner Mongolia 014010,China);Analysis of Over-excavated Volume and Synchronous Grouting Volume for the Shield Tunnel at Curved Section in Soft Soil Area[A];[C];2013
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 DING Chun-lin et al;Dark-excavation Construction Techniques of the Double-line Tunnel and Its Numerical Simulation Analysis[J];Underground Space;2002-04
2 BIAN Jin , TAO Lian-jin , GUO Jun (College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100022, China);The Ground Settlement Monitoring of a Shield Tunnel[J];;2005-02
3 LI Da-yong~1,WANG Hui~2,WU Ya-jun~3(1.School of Civil Engineering,Shandong University of Science & Technology,Qingdao 271019;2.Guangzhou Subway Design and Research Institute,Guangzhou 510010;3.Department of Geotechnical Engineering,Tongji University,Shanghai 200092);Impact of Shield Tunneling on the Environment Around the Tunnel[J];;2005-S1
4 CHEN Long~1,HUANG Hong-wei~2(1.Shanghai Civic Engineering Construction and Developing Ltd., Shanghai 200025;2.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092);Risk Loss Analysis During Construction of Soft Soil Shield Tunnel[J];Chinese Journal of Underground Space and Engineering;2006-01
5 WENG Cheng-xian~1,ZHANG Qing-he~1,ZHU Ji-wen~2,CHEN Yong~2(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,P.R.China;2.No.2 Municipal Engineering Co.,Ltd,Shanghai 200232,P.R.China);Analysis on Surface Subsidence Resulting From DOT Tunneling in Soft Ground[J];Chinese Journal of Underground Space and Engineering;2006-01
6 CHEN Yun,WU Zhu-qing,LIU Jun-jian(School of Traffic and Transportation Engineering,Changsha University of Science & Technology,Changsha 410076,China);Risk evaluation of highway engineering project based on the Fuzzy-AHP[J];Journal of Changsha Communications University;2008-03
7 WEI Liang-wen~(1,2),WU Tao~(1,2),ZHANG Qing-he~(1,2)(1.Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;2.Geotechnical Key Laboratory,Tongji University,Shanghai 200092,China);STABILITY ANALYSIS OF SOIL BODY OF SHIELD STARTING SHAFT IN LARGE-DIAMETER SHIELD TUNNELING[J];Low Temperature Architecture Technology;2006-02
8 Wang Zhenxin;Safety Analysis of Road Tunnels[J];Undergrourd Engineering and Tunmels;2003-01
9 Wang Xi;Utilization of Tunnel Space Review of River-crossing Tunnels in Shanghai[J];Undergrourd Engineering and Tunmels;2003-01
10 Wang Liang (Beijing Urban Engineering Construction Group Corporation Ltd., Beijing 100081);Application of Shield Tunneling Method in Beijing Metro Line 5[J];Urban Rapin Rail Transit;2004-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved