Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition)》 2008-01
Add to Favorite Get Latest Update

Status Quo and Prospect of Research on Technical Risk for Weapon System Development

XU Zhe,WU Jin-jin(School of Economics and Management,Beijing University of Aeronautics and Astronautics,Beijing 100083,China)  
Technical risk is the very important risk for weapon system development(WSD),and it always exists in the process of WSD.Technical risk is the chief factor that brings cost risk,schedule risk and performance risk.Controlling and managing technical risk in the process of WSD are very important and necessary.On the basis of systematically reviewing the main literature for technical risk of WSD,the research scopes of the technical risk management are analyzed and summarized in this paper,which include the concept and the meaning of technical risk,the management process of technical risk,as well as the approaches to technical risk identification and assessment.Further research directions of the approaches to technical risk identification and the quantitative appraisement models for technical risk are also pointed out.
【Fund】: 航空科技创新基金项目(07E51009)
【CateGory Index】: E920
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 6 Hits
1 XU Zhe,JIA Zi-jun(School of Economics & Management,Beihang University,Beijing 100191,China);Assessment of technical risk for weapon system development project based on GERT simulation including multi-branch feedback[J];Computer Integrated Manufacturing Systems;2010-03
2 ;Study on Active Equipment Modification Risk Assessment Based on BP Neural Network[J];Aviation Maintenance & Engineering;2012-02
3 CHEN Wei-gang;ZHANG Min-fang;WANG Jing;Mechanical Engineering College;;Method and Application of Technology Readiness Assessment based on Close Degree[J];Technoeconomics & Management Research;2013-12
4 WANG An,CHEN Zhi-ning,HU Hao-ran(Artillery Academy of PLA,Hefei 230031,China);Appraisement Model About Technical Risk in the Weapon Equipment Development Based on Triangle Whiten Function[J];Command Control & Simulation;2010-06
5 XU Zhe1,JIA Zi-jun1,2(1.School of Economics and Management,Beihang University,Beijing 100191,China;2.Software and Integrated Circuit Promotion Center,Ministry of Industry and Information Technology,Beijing 100038,China);Assessment of performance risk for weapon system development based on simulation method[J];Systems Engineering and Electronics;2011-04
6 SUN Pengcai;TIAN Tao;LUO Ma;WANG Weiwei;HE Jingyi;Wuhan Second Ship Design and Research Institute;;Research on Management of Technique Risk for Warship Models[J];Shipbuilding of China;2015-01
【Citations】
Chinese Journal Full-text Database 6 Hits
1 Zhu Qichao,Kuang Xinghua,Shen Yongping (Management School of National University of Defense Technology, Changsha 410073, China)[;Risk Matrix Method and Its Application in the Field of Technical Project Risk Management[J];Engineering Science;2003-01
2 ZHAO Li\|yan, GU Ji\|fa (Institute of Systems Science, Chinese Academy of Sciences, Beijing 100080);The Application of Probabilistic Risk Assessment Approach to the Safety Analysis of one Specific Type of Launch Vehicle in China[J];SYSTEMS ENGINEERING-THEORY & PRACTICE;2000-06
3 LU Jian-wei(Department of Management Science, Naval University of Engineering, Wuhan 430033, China);Study on the Risk Management in Weapon System Development[J];Systems Engineering and Electronics;2002-05
4 FU Zhi-min~(1,2), LI Han-ling~1(1. School of Management, Harbin Institute of Technology, Harbin 150001, China;2. The Second Academy, China Aerospace Science and Industry Corporation, Bejing 100854, China);Risk analysis, evaluation and correlation study foraerospace research and development project[J];Systems Engineering and Electronics;2005-01
5 XU Zhe~1, FENG Yun-cheng~1, LU Da-wei~2(1. School of Economics and Management, Beijing University of Aeronautics and Astronautics, Beijing 100083, China;2. No.613 Institute, China Aviation Industry CorporationⅠ, Luoyang 471009, China);Appraisement model of technical risk for weapon system development[J];Systems Engineering and Electronics;2005-06
6 Gu Jifa\ Zhao Liyan \= Institute of Systems Science,Chinese Academy of Sciences,Beijing 100080;Introduction of Probabilistic Risk Assessment Approach to Analyze\=the Safety of Space Systems[J];Systems Engineering and Electronics;1999-08
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 GU Xiao-ping et al(Guizhou Institute of Mountain Environment Climate,Guiyang,Guizhou 550002);Risk Assessment Model of Frozen Disaster in Guizhou Province[J];Journal of Anhui Agricultural Sciences;2009-14
2 WANG Zuogong1,JIA Yuanhua2,LI Jian2(1.School of Economics,Henan University,Henan Kaifeng 475004,China;2.School of Traffic and Transportation,Beijing Jiaotong University,Beijing 100044,China);Research of Project Risk Management System Construction Based on Ecological Theory[J];Journal of Beijing Jiaotong University;2009-06
3 ZHANG Ai-lin,YUAN Tao(Inner Mongolia University of Science & Technology,Baotou 014010,Nei Monggol,China);Analysis on Risk Management in Construction Project Management[J];Science & Technology of Baotou Steel(Group) Corporation;2006-04
4 Du Wenzheng,Ding Gangle(No.2 Department,Second Artillery Engineering College,Xi'an 710025,China);Risk Assessment Model of Air of Enclosure Space Security Based on Risk Matrix[J];Ordnance Industry Automation;2011-10
5 SUN Zhi-wu,LI Ping (1.Department of Quality and Safety,Aviation Industry Corporation of China,Beijing 100022,China;2.School of Economics and Management,Beijing University of Aeronautics and Astronautics,Beijing 100191,China);The Characteristics of Risk and Design of Risk Analysis Index System for Aero-engine Projects[J];Journal of Beijing University of Aeronautics and Astronautics(Social Sciences Edition);2010-03
6 WANG Feng1,2,MA Da-wei1,WU Xiao-yun3,CHEN Bing1 (1.School of Mechanical Engineering,Nanjing University of Science and Technology,Nanjing 210094,Jiangsu,China;2.Command and Control Staff Room,Air Defense Command Academy,Zhengzhou 450052,Henan,China;3.Rocket Staff Room,Artillery Academy,Hefei 230031,Anhui,China);Technical Risk Analysis of Ship-borne Multiple Function Rocket Launcher Based on Gray Cluster Decision[J];Acta Armamentarii;2008-03
7 Ge Zhihao Xu Haojun Liu Lin Meng Jie(The Engineering Institute,Air Force Engineering University,Xi'an 710038,China);Risk probability assessment method for complex system[J];Journal of Beijing University of Aeronautics and Astronautics;2007-09
8 Yang Yaqin(School of Economics and Management,Beijing University of Aeronautics and Astronautics,Beijing 100191,China)Zhou Rongxi(School of Economics and Management,Beijing University of Chemical Technology,Beijing 100029,China)Qiu Wanhua(School of Economics and Management,Beijing University of Aeronautics and Astronautics,Beijing 100191,China);Risk decision for the development of the aerospace project based on the incomplete linguistic information[J];Journal of Beijing University of Aeronautics and Astronautics;2008-12
9 Feng Zhen Deng Zhongmin(School of Astronautics,Beijing University of Aeronautics and Astronautics,Beijing 100191,China)Wu Qiang Huang Xiaofeng(Aviation Industry Development Research Center of China,Beijing 100012,China);Method based on fuzzy evaluation and GIOWA operator for technical risk assessment[J];Journal of Beijing University of Aeronautics and Astronautics;2011-06
10 Zhao Shudong(Shanxi Mechanical Engine Technology College,Changzhi Shanxi 046000);Risk Management of the Participants of Exercise Fitness Route Activities——A Case Study of Changzhi City[J];Sports Forum;2012-02
China Proceedings of conference Full-text Database 10 Hits
1 JIANG Jiang,LI Xuan,CHEN Yingwu,GE Bingfeng (College of Information System and Management,National University of Defense Technology,Changsha 410073, China);Aerospace Project Risk Analysis and Assessment based on the Evidential Reasoning Approach[A];[C];2010
2 FANG Zhi-geng,YANG Bao-hua,ZHU Jian-jun,HU Ming-li,LIU Wen-jie,HE Sha-wei,GUO Ben-hai(Nanjing University of Aeronautics and Astronautics,Nanjing 210016,China);Optimization and Simulation on Key Development Process of Complex Equipment Based on ACPI System[A];[C];2011
3 HUANG Chongfu (College of Resources Science and Technology, Beijing Normal University; Key Laboratory of Environmental Change and Natural Disaster, Ministry of Education of China, Beijing 100875, China);Some Considerations for Promoting Risk Discipline in China[A];[C];2004
4 Wang Yuchen Zhang Jinlong (Huazhong University of Science & Technology, Wuhan,China);Risk Identification of IT Projects DuringTotal Life Cycle[A];[C];2005
5 GU Ji-fa, TANG Xi-jin (Institute of Systems Science, Chinese Academy of Sciences, Beijing 100080, China);Sorne rrogress in the Studies on Meta-Synthesis System Approach[A];[C];2002
6 ;基于风险网络的大型工程项目风险度量方法研究[A];[C];2009
7 HONG Lin YAN Xiang-lu (Offshore Oil Engineering Co.,Ltd.,Tianjin 300452,China);The Application of P3E/C in Designing Plan Management[A];[C];2008
8 LIU Ren-hui~1 AN Shi~2 (1.School of Management,Harbin Institute of Technology,Harbin 150001,China;2.School of Science and Engineering on Communication,Harbin Institute of Technology,Harbin 150090,China);Project Risk Identification Model based on System Identification[A];[C];2007
9 DING Chang-hong DENG Zhong-min (School of Astronautics, Beijing University of Aeronautics & Astronautics, Beijing 100191, China);Dynamic Analysis of Risk in Aircraft Research Project Based on Monte Carlo Method[A];[C];2008
10 WEI Fa-jie~1,LIU Huan-huan~1,LU Huai-bei~2 (1.School of Economics and Management,Beijing University of Aeronautics and Astronautics,Beijing 100191,China; 2.China Academy of Launch Vehicle Technology,Beijing 100076,China);Dynamic Risk Management Study about Pre-research Project of Space Background Model[A];[C];2009
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHU Chuan-zhi, SUN Xu-ming, MA Shi-you (Brigade of Graduate, Air Defense Forces Command Academy, Zhengzhou 450052, China);Information Warfare Ability Evaluation of Missile Unit Based on Triangle Whiten Function[J];Ordnance Industry Automation;2006-06
2 HE Ming(School of Science,Beijing Institute of Technology,Beijing 100081);Risk Management Process and Risk Decision of Large Research Project[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2007-02
3 ZHANG Zi-jian (School of Management, Tianjin University, Tianjin 30072, China);Study on the risk management system of equipment project[J];Ship Engineering;2008-01
4 YU Pei(School of Computer and Information,Chongqing Jiaotong University,Chongqing 400074,China);Study on Management Information System of Construction Project of Highway[J];Journal of Chongqing Jiaotong University(Natural Science);2008-01
5 Cui Xingyuan; Zhou zhi(Department of Management Engineering)Yu Yonghe(Department of Highway Management of Guangxi, Nanning);Risk Influence Diagrams and Project Risk Evaluation[J];JOURNAL OF CHONGQING JIAOTONG INSTITUTE;1996-S1
6 WU Wu-qing(Jiangxi Transmission & Distribution Construction Co.,Nanchang 330200,China);Risks and Countermeasures of Engineering Construction Project[J];Electric Power Construction;2007-01
7 Wang Wenhua, Wang Hongyu ( Dept. of Electron. Eng., Dalian Univ. of Technol., China );An algorithm property analysis for time varying parameters estimation of nonstationary random signals model[J];JOURNAL OF DALIAN UNIVERSITY OF TECHNOLOGY;1997-01
8 HOU Shi-tian(Department of Police Tactics,Fujian Police Academy,Fuzhou 350007,China);On the Risk of Command and Decision-making in Actual Policing Combat and Its Control[J];Journal of Fujian Police Academy;2008-06
9 HE Zheng wen, XU Yu, ZHU Shao ying, ZHANG Jing wen (School of Management,Xi’an Jiaotong University,Xi’an 710049,China);Cycle Time Simulation Analysis for New Product Development Projects Based on GERT Model[J];Systems Engineering;2003-02
10 FEN Lijun1 LI Shuquan2(1.Tianjin University of Finance and Economics,Tianjin,300222,China;2.Agriculture University of Heibei,Baoding 071001,China);Study On Risk Identification Method of Construction Project Based On SVM[J];Journal of Industrial Engineering and Engineering Management;2005-S1
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 LI Jiang,LEI Xiaogang(College of Information System and Management,National University of Defense Technology,Changsha 410073,China);Risk analysis method of large-scale space development project based on multi-agent technology[J];Journal of National University of Defense Technology;2012-06
2 LYU Hui-wen;ZHANG Wei;WANG Ming-kun;Academy of Equipment;General Equipment Department's Military Repershetive at Chongqing;;Research on Risk Management and Strategy of the Development of the Large Equipment Development[J];Journal of Sichuan Ordnance;2014-12
3 Yanning LI;China Electronics Technology Group Cooperation No.7 Research Institute;;On Risk Management of the Scientific Research Project[J];Management Observer;2015-02
4 YIN Wei-wei;JIANG Ju;XIN Jun-jie;College of Automation Engineering,Nanjing University of Aeronautics and Astronautics;;Simulation and Sensitivity Analysis of Collaborative Developing Process of Weaponry Based on Quality Feedback[J];Acta Armamentarii;2015-10
5 LI Jing1,XIE Zhen-zhen1,CHEN Xiao-bo2(1.Faculty of Infrastructure Engineering,Dalian University of Technology,Dalian 116024,China;2.School of Investment Project Management,Dongbei University of Finance and Economics,Dalian 116023,China);Risk Evaluation on the Operation Period of Offshore Wind Power Projects Based on Support Vector Machine[J];Journal of Engineering Management;2013-04
6 WU Lei;QU Feng;Unit 92,No.91388 Troops of PLA;;Gray Integrated Evaluation of Technical Risk for Submarine Combat System Test Project[J];Ship Electronic Engineering;2014-10
7 YU Hai-chan;Institute of Biophysics,Chinese Academy of Sciences;;Application of the PDCA Process in Risk Management of the Large-scale Instrument and Equipment R & D Projects[J];Science & Technology and Economy;2015-01
8 HOU Jun-jie;YANG Yu-zhong;School of Energy Science and Engineering, Henan Polytechnic University;;Study on Assessment of Car Supply Chain Risk Based on Triangle Whitening Weight Function[J];Logistics Sci-Tech;2015-09
9 XU Ji-hui;LIANG Ying;QI Yao;School of Material Management and Safety Engineering,Air Force Engineering University;School of Air and Missile Defense,Air Force Engineering University;;Research on Application of Manufacturing Readiness Level Evaluation in the Plan Demonstration of Weapon System[J];Fire Control & Command Control;2015-10
10 CHEN Ming1,MAO Yanfen1,LIN Guijuan2(1.Sino-German College of Applied Sciences,Tongji University,Shanghai 200092,China;2.College of Mechanical Engineering,Tongji University,Shanghai 200092,China);Activity-based Technical Risk Identification Modeling for Complex Products Developing Process[J];Journal of Tongji University(Natural Science);2011-05
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Lu Jianwei and Rou Jianjun;A Study on Risk Analysis Methods for the Development of Naval Ships[J];Ship Engineering;1995-05
2 L u ¨ Jianwei Liu Zhonghua Gao Jie;Analysis of Technique Risk of Warship Development[J];JOURNAL OF THE NAVAL ACADEMY OF ENGINEERING;2000-02
3 Lü\ Jianwei\ Liu Zhonghua\ Lü Zhongyuan;The\ Analysis\ of\ Risk\ Management\ and Contract Type in Warship Development[J];JOURNAL OF THE NAVAL ACADEMY OF ENGINEERING;1999-01
4 CHENG Jun-wei, CHI Bao-shan, LIU Wei-ping (Academy of Annored Force Engineering, Beijing 100072, China);Fuzzy Synthetic Appraisement of Technology Risk Rank in Equipments' Development Programs[J];Journal of Luoyang University;2003-02
5 ZHU Dao hai 1, QU Liang hua 2 (1.Institute of Planning and Designing, East China Bureau of Petroleum, Yangzhou 225002, China; 2. Suzhou Municipal Institute of Civil Achitectural Design, Suzhou 215006, China);Effects of the Hydrogeological and Environmental Conditions on Large Project Decision[J];Journal of Shanghai University(Natural Science Edition);2001-04
6 XU Li 1 1.College of Economic management,Wuhan Univ.of Hydr.& Elec.Eng.,Wuhan 430072,China;A further research on risk decision method[J];JOURNAL OF WUHAN UNIVERSITY OF HYDRAULIC AND ELECTRIC ENGINEERING;1999-02
7 Fu Hongyuan (Chongqing Jianzhu University, 630045);A Methodology for Evaluating Priject’s Risk[J];SYSTEMS ENGINEERING ---THEORY & PRACTICE;1995-10
8 LU Jian-wei(Department of Management Science, Naval University of Engineering, Wuhan 430033, China);Study on the Risk Management in Weapon System Development[J];Systems Engineering and Electronics;2002-05
9 GU Xiao hui (School of Mechanics Engineering, NUST, Nanjing 210094, China);Study on Risk Estimation Based on the BAM-Hamming Neural Network[J];Systems Engineering and Electronics;2003-01
10 Gu Jifa\ Zhao Liyan \= Institute of Systems Science,Chinese Academy of Sciences,Beijing 100080;Introduction of Probabilistic Risk Assessment Approach to Analyze\=the Safety of Space Systems[J];Systems Engineering and Electronics;1999-08
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved