SCHEDULE OPTIMIZING MODEL AND ITS SOLUTION

Pan Wenyan\ \ Du Duanfu (Beijing University of Aeronautics and Astronautics,School of Management)  
This paper focus on the application of cost/schedule synthetical control theory. The adjustable margin of project and schedule margin are defined and measured quantitatively. Then, based on banana curves, an optimizing model considering both cost and schedule margin is worked out. Its heuristic solution is also presented. The model can give efficient solution meeting restraints of dead line, resources and cost to large scaled network optimizing problem with initial feasible solution is given.
【Fund】: 国家自然科学基金
【CateGory Index】: N94
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Wu Zhiming(Tsinghua University, Beijing 100084);An Integrated Management Solution with CPM/Time-Cost[J];系统工程理论与实践;1995-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 XU Na;ZHU Lei;State Key Laboratory of Hydraulic Engineering Simulation and Safety,Tianjin University;Langfang Water Affairs Bureau;;Hydraulic Engineering Cost-schedule Simulation Method and Application Based on S-Curve and Bayesian Network[J];中国农村水利水电;2017-10
2 ZHANG Wei-rong (Guangzhou Metro Corporation, Guangzhou 510380);The Utilization of the Curve Method of the Funds Accumulative in Project[J];广州建筑;2009-02
3 ZHOU Yan,CUI Xin-yuan(Department of Management,Chongqing Jiaotong University,Chongqing 400074);The Application of Earned Value Method in Project Investment and Schedule Control[J];基建优化;2006-05
4 JIN Peng(State Key Lab.of Water Resource and Hydropower Eng.Sci.,Wuhan Univ.,Wuhan 430072,China)HU Zhigen LIU Quan;Analysis of Network Scheduling Optimization Technique Based on Construction Simulation[J];水电能源科学;2006-03
5 LUO Xinxing,MIAO Weihua(School of Business, Central South University, Changsha 410083, China);Basic theory and practical application of the Earned Value Measure[J];中南大学学报(社会科学版);2003-03
6 WANG Zhuo fu, et al(College of International Industry and Commerce, Hohai Univ., Nanjing 210098, China);A Review of Construction Schedule for Hydropower projects[J];水利水电科技进展;2001-03
7 Wang Yongqing Liu Wei(Institute of Nuclear Energy Technology,Tsinghua University,Beijing,100084)  ;Dynamic Cost Control Information System forNuclear Power Plant Construction[J];核动力工程;1998-03
8 ZHU Yan, LIU Xueji, WANG Xiaohui Institute of Nuclear Energy Technology, Tsinghua University, Beijing 100084, China;Cost control method and software design of HTR 10 project[J];清华大学学报(自然科学版);1998-05
9 Pan Wenyan\ \ Du Duanfu (Beijing University of Aeronautics and Astronautics,School of Management);SCHEDULE OPTIMIZING MODEL AND ITS SOLUTION[J];北京航空航天大学学报;1997-03
10 Xu Zhuoming(College of Computer and Information Engineering, Hobal Univ. Nanjing 210098)Hu Zhaoshu; Ouyang Hongxiang(College of International Industry and Commerce, Hobal Univ. Nanjing 210098);Design and Implementation of Construction Schedule Control System for the Three Gorges Project[J];河海大学学报;1996-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved