Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《The World of Inverters》 2010-01
Add to Favorite Get Latest Update

Implementing Experience of Gas Boiler Blower Frequecy Transformation of 25MW Generator in Kunming Iron and Steel

Liao Juhua  
25MW generator in Kunming iron and steel is a project of using waste heat£-make use of blast furnace,coke oven gas burned to generate.As the blast furnace gas and coke oven gas supply ratio changing,the corresponding auxiliary flow should be adjusted to follow.The system is used Fan inlet baffle throttle to adjust.Because this primitive method is just to change the flow resistance of the channel,while the output power of the driving source has not changed much,wasting a lot of energy,so choose a suitable high-voltage inverter to transform the fan/blower for energy-saving has become the consensus of Kunming Iron and Steel.
【CateGory Index】: TM621.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved