Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Jiangxi Normal University (Natural Sciences Edition)》 2005-04
Add to Favorite Get Latest Update

Design and Realization for Management System of Engineering Projects in Complete Sets of Equipment

LIU Chao~1, YIN Hong~2(1.College of Computer Information and Engineering,Jiangxi Normal University, Nanchang 330027,China;2. College of Software,Jiangxi Normal University, Nanchang 330027, China)  
In background of the work content of design and realizing stage of the information management systems in developing engineering projects of complete sets of equipment,through analyzing the logical structure and function arrangement models of design and realizing,this paper discusses two major questions in the course of the system realization.
【Fund】: 江西省机械工业厅科研项目———成套设备工程项目管理信息系统.
【CateGory Index】: TP311.52
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 LIU Chao 1 , BAI Ling 2 (1. Jiangxi Normal University,Nanchang Jiangxi 330027;2. Jiangxi Agriculture University, Nanchang Jiangxi 330045,China);On the basic pattern of management of engineering projects in complete sets of equipment[J];Journal of Nanchang Institute of Aeronautical Technology;2003-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 CHEN Juan et al (College of Resources and Environmental Sciences,Wuhan University,Wuhan,Hubei 430072);Opportunity Analysis and the Environmental Problems of Land Consolidation in Guanzhong Area[J];Journal of Anhui Agricultural Sciences;2005-02
2 LIU Shu-hong (Lanzhou City University,Lanzhou 730070,China);The Choice of Financing Models of Urban Sewage Treatment Infrastructure Based on AHP[J];Urban Management Science & Technology;2007-01
3 WANG Tie-hong,WANG Yue,TAO Ran,ZHOU Si-yong(Beijing Institute of Technology,Beijing 100081, China);Integrated Design of Engineering System[J];Telecommunication Engineering;2002-06
4 GUO Ya-jun,YI Ping-tao(School of Business Administration,Northeastern University,Shenyang 110004,China.);A Multi-evaluation Conclusion Aggregation Method Based on Singular Value Decomposition[J];Journal of Northeastern University(Natural Science);2007-02
5 ZHOU Xiao,LI Na-na,TANG Yan(Southwest Petroleum University,Chengdu 610500,China);On Improving the Efficiency of Demand Side Management by Using Interpretative Structural Model[J];Journal of Jiangxi Vocational and Technical College of Electricity;2007-01
6 YAO Xiao-bing (Hunan electronic institute,changsha,Hunan 410001,China);The application of ADO in VB[J];Computer and Information Technology;2005-04
7 JIANG Tie-hai(Guangdong University of Foreign Studies, Guangdong, Guangzhou 510420);Approach to Processing Text Information in VB[J];Computer Knowledge and Technology;2005-30
8 ZHANG Sheng-hua(Yangzhou Taxation Institute of the State Administration for Taxation 225007,China);The Strategy of Accessing Oracle Database by Visual Basic with ADO Technology[J];Computer Knowledge and Technology;2005-36
9 JIANG Wen-hao(Chongqing Institute of Technology computer electronic engineering, Chongqing 400021,China);The Application of Visual Basic on Database[J];Computer Knowledge and Technology(Academic Exchange);2007-04
10 HAN Jin-shan1,2,TAN Zhong-fu2,LIU Yan1(1.School of Management,Tianjin University,Nankai District,Tianjin 300072,China;2.Institute of Electric Power Economics,North China Electric Power University,Changping District,Beijing 102206,China);RESEARCH ON INTERPRATATIVE STRUCTURE MODELING FOR RISKS OF ELECTRICITY RETAIL MARKET[J];Power System Technology;2005-08
【Co-references】
Chinese Journal Full-text Database 4 Hits
1 XUE Zi-li,XIA Yuan-ling,CHEN De-han(Heilongjiang Agriculture Reclamation Building Project Co.Ltd.of Heilongjiang Prov.,Harbin 150001,China);The application of work breakdown structure in management plan of building item[J];Journal of Heilongjiang Hydraulic Engineering College;2005-03
2 Song Yajing; Ding Ronggui (School of Business & Management Shan dong University,Jinan 250100,China);Promote the Enterprise's Core Competence by Strengthening the Project Management Songyajing Dingronggui[J];Value Engineering;2006-01
3 ZHOU Li (The 13th China Metallurgical Construction Company,Taiyuan 030009,China);Problems existed in project management and countermeasures[J];Shanxi Architecture;2004-11
4 Shenzhen Hualun investment Consultation Co. Ltd. Wang Xiaolin;THE STATUS AND OPERATION OF CONTRACT MANAGEMENT IN PROJECT MANAGEMENT[J];Copper Engineering;2005-02
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved