Full-Text Search:
Home|About CNKI|User Service|中文
Add to Favorite Get Latest Update

The Steel Cofferdam Construction Surveying of the Main Tower's Foundation of the South Branch of NO.2 Yangtze River Bridge of Nanjing

Huang Zhangyu ① Huang Teng ① Zhao Zhongrong ① Li Zhiping ② (① Hehai University, Nanjing, 210024; ② Bridge Design Institute Engineering Supervision Co., Nanjing, 210005)  
This paper deals with the construction surveying of manufacture, installation, positioning and settlement of steel cofferdam of main towers foundation for a large cable bridge. It contains cofferdams bottom manufacture, installation, level transmition, precise positioning, sinking to the rock and finishing measure. This is aimed at providing an effective measuring method for such kind of cofferdam construction.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved