Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Science of Surveying and Mapping》 2008-S3
Add to Favorite Get Latest Update

Application of modified grey model in insertion of interrupted data of subsidence monitor

ZHANG Ai-zhong①,ZHANG Jian-xiong②(①Survey and Design Institute of ZIXING Coal Grou Pin HUNAN Province,Zixing 423404,China;②School of Surveying and Land Information Engineering,Henan Polytechnic University,Jiaozuo 454003,China)  
With regard to large and towering buildings,regular subsidence monitoring is an essential and very important work to ensure the safety of the building during construction and running. However,restricted by various conditions,sometimes subsidence monitor can be interrupted. In order to analyze the law of the subsidence of the building,it is necessary to insert and replenish the interrupted data. Firstly,the unequal interval characteristic of subsidence monitor of the building is considered. The adjacent time interval is taken as weight,the 1-WAGO sequence is directly made and the unequal interval GM(1,1) model is established. Secondly,the model is applied in insertion work in the interrupted data. When the error of the simulated values is big,one rank model of the residual error is applied to modify the original model. Finally,the result of model test shows that the precision of the modified model is improved and the better interrupted data are obtained.
【Fund】: 河南省重点科技攻关项目(0302032700)
【CateGory Index】: TU196.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 LIU Ming-bo~(1,2) TIAN Lin-ya~3 SUN He-ping~1 (1.Institute of Geodesy & Geophysics,Chinese Academy of Science,Wuhan 430077,China; 2.Graduate School of Chinese Academy of Science,Beijing 100049,China; 3.College of Civil Engineering,Hehai University,Nanjing 210098,China);Study of unequal-step GM(1,1)model and its application[J];Engineering of Surveying and Mapping;2006-03
2 CHEN Wei-qing(College of Civil and Architectural Engineering,Guangxi University,Nanning 530004,China);Application of gray forecast in the deformation analysis of structure settlement[J];Science of Surveying and Mapping;2005-05
3 XIAO You-cai,ZHANG Xiu-cheng,WANG Hong-yan (Dep. of the National Land Survey,Pingdingshan Institute of Technology, Pingdingshan 467001, China);Application of grey theory model in prediction of pit water discharge in coal mine[J];Journal of Liaoning Technical University;2004-02
4 WU Ai-you,TIAN Yun-li,SONG Yi,HE Li-wen(School of Energy and Safety Engineering,Hunan University of Science and Technology,Xiangtan 411201,China);Application of the grey system theory for predicting the amount of mine gas emission in coal mine[J];Journal of China Coal Society;2005-05
5 XIE Feng1,ZHU Lu-ming2,WANG Li-zhong1 (1. Institute of Geotechnical Engineering,Zhejiang University,Hangzhou 310027,China; 2. Zhejiang Hengye Real Estate Co.,Hangzhou 310009,China);MODIFIED GREY SYSTEM FORECASTING MODEL AND ITS APPLICATION FOR ANALYZING INFORMATION OF LANDSLIDE MONITORY[J];Chinese Journal of Rock Mechanics and Engineering;2005-22
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Guo Liping Sun Wei Zheng Keren Chen Bo (Department of Materials Science and Engineering, Southeast University, Nanjing 210096, China);Non-equal interval GM (1,1) direct model and its applicat ion in processing of materials experimental data[J];Journal of Southeast University (Natural Science Edition);2004-06
2 CUI Guo-hong , XU Li-hua(School of Civil and Architectural Engineering, Wuhan University, Wuhan 430072,China);Study on Technique of Deformation Analysis and Prediction in Civil Engineering Structure[J];Geospatial Information;2004-03
3 WANG Zuo-lei, CAI Guo-liang(School of Science, Jiangsu University, Zhenjiang212013,China);The Problem in Modeling of Nonequidistance Squence and Its Improvement[J];College Mathematies;2003-02
4 ;An Improvment Method for Grey Model of Nonequal Interval Series[J];THE ADMINISTRATION AND TECHNIQUE OF ENVIRONMENTAL MONITORING;1997-04
5 Li Zhengping; Zhang JinZhong; Li Yanxi; Sun Xiaodong;Safety Grey Assessment in Dynamic[J];JOURNAL OF SHENYANG INSTITUTE OF AERONAUTCAL ENGINEERING;1997-03
6 CHEN Chun, WU Zhang_dun (College of Civil and Architecture Engineering, Guangxi University, Nanning 530004, China);Application of Gray Forecast in the Observation of Earth Dam[J];Hongshui River;2004-03
7 Luo Youxin; Zhou Jirong(Hunan Phosphorus and Chemical General Factory,Liuydng, 410306);NONEQUIDISTANCE GM(1, 1) MODEL AND ITS APPLICATION IN FATIGUE EXPERIMENTAL DATA PROCESSING AND ON-LINE CONTROL[J];JOURNAL OF MECHANICAL STRENGTH;1996-03
8 Li Lei Jiang Zhiqiang (College of Civil Engineering, Hohai University);UNEQUAL-STEP GREY MODEL PREDICTICON OF THE DISPLACEMENT OF RETAINING STRUCTURE FOR DEEP EXCAVATION[J];Site Investigation Science and Technology;2001-05
9 WU Ai-you, CAI Kang-xu (School of Energy and Safety Engineering, Hunan University of Science and Technology, Xiangtan 411201, China);Fuzzy evaluation on mine self caused fire risk[J];Coal Science and Technology;2004-07
10 WU Ai-you,XIAO Hong-fei,WANG Cong-lu,HE Li-wen(School of Energy and Safety Engineering,Hunan University of Science and Technology,Xiangtan411201,China);Establishment and application of weights and gray association model based on coal and gas outburst controlled factors assessment[J];Journal of China Coal Society;2005-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved