Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Science of Surveying and Mapping》 2011-05
Add to Favorite Get Latest Update

A discussion based on free-station about the method of foundation pit horizontal displacement monitoring

YANG Xue-feng,LIU Cheng-long,LUO Yan-wen(Southwest Jiaotong University,Chengdu 610031,China)  
In this paper,according to the actual condition about the horizontal displacement monitoring of foundation pit in the city,an observation method based on CPⅢ control network of free-station on the high-speed rail to carry out the monitoring of foundation pit horizontal displacement was introduced.Through theory analysis and verification of engineering examples,by using this method the observation station could be placed flexibly,the net types could be variable.As for those foundation pits which have complex shapes and large construction disturbance,the construction efficiency would be improved.This method could meet the monitoring accuracy requirement of first grade foundation pit with the observation using high grade total station,in order to reach the goal to feedback deformation information immediately and accurately for the foundation pit construction.
【CateGory Index】: U212.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 10 Hits
1 Chen Wei,Gao Wei,Xu Meng,Shen Changjiang(Faculty of Information Engineering,China University of Geosciences,Wuhan Hubei 430074,China);Study on the Application of the Improved Polar Coordinates to Horizontal Displacement Monitoring of Foundation Pits[J];Chinese Journal of Engineering Geophysics;2012-05
2 DAI Xiao-lei,HE Yue-guang,JI Fang,XIONG Sha(College of Traffic and Transportation Engineering,Changsha University of Science & Technology,Changsha 410004,China);A horizontal displacement monitoring method of pile cap under complicated terrain[J];Journal of Transport Science and Engineering;2012-04
3 GONG Xun-qiang;LI Wei-jun;ZHOU Xiu-fang;School of Geosciences and Environmental Engineering,Southwest Jiaotong University;No.7 Geological Team of Zhejiang Province;College of Economics and Management,Sichuan Agricultural University;;Application of free station method to CPⅢ network survey for high-speed railway[J];Engineering of Surveying and Mapping;2013-06
4 MA Hong-lei;LIU Cheng-long;SONG Tao;GENG Zhong-li;School of Geosciences and Environmental Engineering,Southwest Jiaotong University;;Research on the application of free station to horizontal control net measurement[J];Engineering of Surveying and Mapping;2014-05
5 He Hui;Zou Shengwei;Li Dongdong;School of Civil and Architecture Engineering,Xi'an Technological University;;Application and Precision Analysis of Two Monitoring Methods in Toundation Pit Monitoring Combination[J];Journal of Gansu Sciences;2015-03
6 ZHAO Shan-lu HUANG Shi-xiong(Jiangsu Non-ferrous Metal East China Geological Survey Bureau,Nanjing 210007,China);On design consideration for engineering design of foundation pit of 228-meter television tower[J];Shanxi Architecture;2012-13
7 CHEN Xiang-yang;School of Civil Engineering,Nantong Vocational University;;Monitoring and Analysis of X Hotel Building Foundation[J];Journal of Nantong Vocational College;2013-03
8 ZHOU Lingyan;LIU Chenglong;GAO Hongtao;NIE Huxiao;Faculty of Geosciences and Environmental Engineering, Southwest Jiaotong University;Shanghai-Kunming Passenger Railway Line Hunan LLC;;Application to a New Method of Control Network Inside Tunnels in Hi-Speed Railways[J];Journal of Geomatics Science and Technology;2014-06
9 TANG Zheng-qi;SONG Ying-chun;ZOU Bo;School of Geosciences and Info-Physics,Central South Univ;School of Municipal and Surveying Engineering,Hunan City Univ;;Filtering Algorithm with Unknown Parameter for Excavation Deformation Monitoring[J];Journal of Hunan University(Natural Sciences);2015-07
10 YANG Feng1,YANG You-tao2,YANG Xue-feng2,LIU Cheng-long2(1.China Railway Eryuan Engineering Group Co.Ltd,Chengdu,Sichuan 610031,China;2.Southwest Jiaotong University,Chengdu,Sichuan 610031,China);The Date Acquisition Program Development of Track Reference Network Based on Intelligent Total Station[J];Journal of Railway Engineering Society;2012-04
【Citations】
Chinese Journal Full-text Database 4 Hits
1 YANG Xue-feng,GONG Tao,WANG Jing-he(School of Civil Engineering,Southwest Jiaotong University,Chengdu 611756,China);A simplified algorithm for measurement adjustment co-factor resolution[J];Science of Surveying and Mapping;2009-01
2 ;Foundation Pit Monitoring in Freedom Station[J];Guangzhou Architecture;2003-02
3 Jin Jianping Zhao Zhongrong (Department of Surveying Science and Engineering,Hohai University);Application and Analysis of Free Stationing to Monitor Horizontal Displacement in Deep Foundation Pit[J];Site Investigation Science and Technology;2008-05
4 LIU Chenglong,YANG Youtao,XU Xiaozuo(School of Civil Eng.,Southwest Jiaotong University,Chengdu 610031,China);Simulated Determination of Accuracy Requirement for Control Points Ⅲ Intersection Networks in High-Speed Railway[J];Journal of Southwest Jiaotong University;2008-06
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 ZENG Qing-wei1 CHEN Gang2 (1.Shanxi railway institute,Weinan,Shanxi,714000,China;2.china railway first group corporation,Xiaan,Shanxi710000,China);Research of Probing Error for High Speed Railway CPⅢ Control Network Plane Survey[J];Beijing Surveying and Mapping;2011-03
2 LI Shu-liang①,LIU Cheng-long①,NI Xian-tao②,XU Xiao-zuo①(①School of Civil Eng.,Southwest Jiaotong University,Chengdu 610031,China;②Third Railway Survey and Design Institute Group Corporation,Tianjin 300251,China);Surveying method of CPⅢ vertical control network in high-speed railway[J];Science of Surveying and Mapping;2011-01
3 CHEN Ben-fu,ZOU Zi-li,GUO Xian-chun,ZHAO Bao-gui(Faculty of Geoscience and Survey Engineering,East China Institute of Technology,Jiangxi Fuzhou 344000,China);Teaching discussions about linear interpolation of stationary function[J];Science of Surveying and Mapping;2011-03
4 WANG Jiexian,GAO Xiaobing,HOU Dongya,XU Wanpeng;Overall Rigorous Three-dimentional Adjustment of High-speed Railway CPⅢ Point[J];Bulletin of Surveying and Mapping;2011-01
5 HAO Yadong,LI Jufang,LIU Li;High-speed Rail Ballastless Track Layout of Control Network and Precision Control[J];Bulletin of Surveying and Mapping;2011-08
6 HUANG Zhi-wei,LIU Cheng-long,WANG Hua-guang,HE Bo,ZHAO Meng-jie(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China);Research of lapping methods between adjacent regions for CPⅢ plane network in high-speed railway[J];Journal of Railway Science and Engineering;2010-06
7 CHEN Hai-jun1,LIU Cheng-long1,FU Heng-you2,YANG Feng2,YANG Xue-feng1(1.Faculty of Geosciences and Environmental Engineering,Southwest Jiaotong University,Chengdu 610031,China; 2.Shanghai-Kunming Railway Passenger Zhejiang Company,Hangzhou 310018,China; 3.Zhongtie Trimble Digital Engineering & Construction Limited Company,Chengdu 610031,China);Research on the network-constructed measurement and strict adjustment methods in the plane network of track reference network of high-speed railway[J];Journal of Railway Science and Engineering;2011-04
8 BAO Min-xian1,2(1.Nanjing Engineering Vocational College of Jiangsu Province,Nanjing 211135,China; 2.Nanjing Engineering Department of Jiangsu Union Technical Institute,Nanjing 211135,China);Accuracy Analysis and Application of Total Station Coordinate Method in Horizontal Displacement Monitoring of Deep Foundation Pit[J];Geomatics & Spatial Information Technology;2011-06
9 LI Yong;Design and Analysis of the Deformation Monitoring Program about a Foundation Ditch in Chengdu[J];Geospatial Information;2011-06
10 Liu Lin1,Liu Chenglong1,Guo Lianghao2,Meng Dongpo1(1.Southwest Jiaotong University,Chengdu 610031,China; 2.China Railway Siyuan Survey and Design Group Co.Ltd,Wuhan 430063,China);Research on solution to the multi-value problem of CPⅢ height network on long-and-large steel truss girders[J];Geotechnical Investigation & Surveying;2012-03
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LIU Yanjun,SUN Dunben(College of Civil Engineering,Nanjing Forestry University,Nanjing 210037,China);Progress of deep excavation deformation control[J];Sichuan Building Science;2011-01
2 Sun Jun;The Environmental Geotechnical Problems Associated with Excavation of Foundation Pits in Urban Areas[J];UNDERGROUND SPACE;1999-04
3 YAN Han-sheng, CUI Ping-yu (Department of Capital Construction ,Northwestern Polytechnical University ,Xi'an710072,China);Analysis of Deep Foundation Ditch under Railway used for Frame-Jacking Construction[J];Chinese Journal of Underground Space and Engineering;2007-S2
4 YAO Ai - jun, XIANG Rui - de, HENG Chao - yang (College of Architecture and Civil Engineering, Beijing University of Technology, Beijing 100022, China; Institute of Foundation Engineering, China Academy of Building Research, Beijing 100013, China);Dynamic Response of the Foundation Deformation of Buildings Nearby the Subway Excavation[J];Chinese Journal of Underground Space and Engineering;2007-S2
5 LIU Yong,FENG Zhi,HUANG Guo-chao,FENG Xu-dong(Beijing Municipal Engineering Research Institute,Beijing 100037,China);The Study in Predicting the Deformation of Supporting Structure for Deep Foundation Pit[J];Chinese Journal of Underground Space and Engineering;2009-02
6 XU Feng,WEI Jian-hua,WU Chao(Shanghai Geotechnical Investigations & Design Institute Co.,Ltd,Shanghai 200438,China);Numerical Analysis of Influence of Pit Excavation on Pile Foundation[J];Chinese Journal of Underground Space and Engineering;2009-S2
7 Yang Jia1,Zhang Zhiqiang2,Zhang Qiangyong1,Zhang Ning1,Li Jie3(1.Geotechnical and Structural Engineering Research Center,Shandong University,Jinan,250061,China;2.Engineering Department,Dazhong Daily,Jinan 250061,China;3.Suzhou Zhuojie Software Technology Co.Ltd.,Suzhou,Jiangsu 215000,China);Development and Application of Analyzing System for Safety Monitoring Information on Deep Foundation Pit[J];Chinese Journal of Underground Space and Engineering;2010-06
8 Zhang Hongru (Department of Civil Engineering, Northern Jiaotong University, Beijing 100044) Hou Xueyuan; Xia Mingyao (Department of Geotechnical Engineering, Tongji University, Shanghai 200092);Prediction to the Influence of Deep Excavation on Surrounding Facilities[J];JOURNAL OF NORTHERN JIAOTONG UNIVERSITY;1996-02
9 WANG Hong,HOU Chao-li(Construction and Installation Co.Ltd.of Baotou Steel(Group)Corp.,Baotou 014010,Nei Monggol,China);Design of Roofbolts and Soil Nailings for Deep Foundation Pits of High-rise Buildings[J];Science & Technology of Baotou Steel;2011-04
10 WANG Nuan-tang The Center of Testing,China Railway 16th Group Co.,Ltd.,100018;Monitoring Technology in Mechanical Deformation of Exterior-protected Constructions in Deep Foundation Ditch[J];Beijing Surveying and Mapping;2008-02
【Secondary References】
Chinese Journal Full-text Database 10 Hits
1 FU Wei-hua;LOU Heng-pang;;The Discussion on Deformation Monitoring of the Foundation Displacement by Super Station Instrument[J];Beijing Surveying and Mapping;2014-05
2 ZHOU Lingyan;LIU Chenglong;NIE Songguang;ZHANG Qiang;SUN Weiya;Faculty of Geosciences and Environmental Engineering,Southwest Jiaotong University;;Simulation study on lateral breakthrough error for horizontal control network in high-speed railway tunnels[J];Journal of Railway Science and Engineering;2015-01
3 WANG Hong;Department of Transportation, Fujian University of Technology;;Application of Leica TS30 ultra-precision total station in deformation monitoring[J];Journal of Liaoning Technical University(Natural Science);2015-03
4 LIU Sheng;LIU Cheng-long;WANG Li-peng;School of Geosciences and Environmental Engineering,Southwest Jiaotong University;;Research on the reasonable accuracy specifications of re-measuring the CPIII plane control network[J];Engineering of Surveying and Mapping;2015-06
5 ZHAI Yongyong;Jiangsu East China Geological Construction Group Co. Ltd.;;Application of displacement monitoring in construction of deep excavation[J];Journal of Nanchang Institute of Technology;2014-03
6 XIAO Ting;HE Yue-guang;JI Fang;Changsha University of Science and Technology;;Processing and Optimization of Incomplete Deformation Monitoring Data[J];Mining and Metallurgical Engineering;2014-03
7 Fu Weihua;;Study on the Foundation Pit Deformation Monitoring of the Super Station Instrument Based on Error Comparison[J];Mine Surveying;2014-03
8 ZHOU Wen-jian;First Engineering Ltd.of Chinese Bridge Bureau;;Construction Survey Technology of Main Tower of Wenzhou Gate Bridge[J];Technology & Economy in Areas of Communications;2014-05
9 YANG De-sheng;Guangdong Highway Design Institute;;Programming of Free-Station Positioning by Total-Station[J];Technology & Economy in Areas of Communications;2014-06
10 GUO Fei;MA Lin;Harbin Institute of Surveying and Mapping;;Discussion of the Survey of the Construction Engineering Inspection and Acceptance in Harbin[J];Technology & Economy in Areas of Communications;2014-06
【Secondary Citations】
Chinese Journal Full-text Database 7 Hits
1 WANG Ai-sheng~(①②),OU Ji-kun~①(①Institute of Geodesy & Geophysics,Chinese Academy of Sciences,Whhan,430077;②Territory Information and Survey Engineering Department,Xuzhou Normal University,Jiangsu Xuzhou,221116);Method of partly least squares and application in gross error location and estimation[J];Science of Surveying and Mapping;2005-02
2 LIANG Yu-bao,HE Bao-xi;A Study of Teaching of the Basis of Surveying Adjustment in Higher Professional Education[J];Bulletin of Surveying and Mapping;2006-05
3 Li Feng (Surveying and Land Information Engineering Department of Tongji University, Shanghai 200092);Precesion Analysis of Free-station Positioning in ETS[J];Modern Surveying and Mapping;2006-05
4 Su Xing, Zhao Dai-qiang, Qian Zheng-di The Second Company of the Third Engineering Bureau of Chinese Railway, Scientific and Technical Department of the Eighth Engineering Bureau of Chinese Railway;CONSTRUCTION TECHNIQUE FOR PRECISE CONTROLLING AND MEASURING ROADBED SLAB OF LONG SLEEPER BURIED TYPE BALLASTLESS TRACK[J];Journal of Railway Engineering Society;2005-01
5 HE Ai-kuan(The Third Survey and Design Institute of China Railway,Tianjin 300251,China);Research on the Main Technical Standards of Horizontal Control for Ballastless Track Construction[J];Journal of Railway Engineering Society;2006-09
6 ZHANG Zhong-liang1,YANG You-tao2,LIU Cheng-long2 (1.China Railway Engineering Consultants Group,Beijing 100020,China;2.Southwest Jiaotong University,Chengdu,Sichuan 610031,China);Study on Three-dimensional Strict Adjustment Method of Space Resection for Precise Positioning Track[J];Journal of Railway Engineering Society;2008-05
7 Wang Peng Liu Chenglong Yang Xi;Research on Calculation Methods of Preliminary Coordinates for Adjustment in Ballastless Track Base-Piles Control Points Ⅲ with Free-Station Linear-Angular Intersection[J];Railway Investigation and Surveying;2008-03
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved