Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Science of Surveying and Mapping》 2013-01
Add to Favorite Get Latest Update

Distinguishability of engineering settlement and land subsidence in the settlement evaluation of high-speed railways

SHANG Jin-guang①,ZHANG Xian-zhou①,GUAN Chao-wei②(①Dept.of Surveying Engineering,Southwest Jiaotong University,Chengdu 610031,China;②Chengdu Institute of Surveying and Investigation,Chengdu 610081,China)  
The Beijing to Jinan section of a high-speed railway is located in the Northern China Plain,along with different degrees of land subsidence.For the railway through the different sections of different land subsidence,the settlement observed is the comprehensive expression of land subsidence and engineering settlement.As the rate of land subsidence is not uniform in space,the paper studied to distinguish between the land subsidence and engineering settlement,and gave the improved observation method as solution.
【Fund】: 西南交通大学校级专题研究项目资助(SWJTU10ZT02)
【CateGory Index】: U213.157
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 LI Guo-he,XU Zai-liang,SUN Shu-li,JING Zhi-dong(The Third Railway Survey and Design Institute Group Corporation,Tianjin 300142,China);The Influence of Surface Subsidence on Construction of High-speed Railway in North China Plain and Its Countermeasures[J];Journal of Railway Engineering Society;2007-08
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LIU Shun,XIE Zhong-liang(Department of Surveying;Shanxi Vocational College of Railway Engineering Technology;Weinan Shanxi 714000,China);Study on Linear Engineering of GPS Height Abnormity Fitting[J];Beijing Surveying and Mapping;2010-03
2 WEN Dianzhong,YANG Junzhi;On the Key Problems of the Third Stage National First-order Levelling[J];Bulletin of Surveying and Mapping;2009-11
3 JIANG Yanfei,MA Quanming,TANG Hongjun,YANG Qiang;On Vertical Control Surveying for Urban Rail Transit Project under the Condition of Ground Cracks and Land Subsidence[J];Bulletin of Surveying and Mapping;2011-03
4 He Tao1,Liu YuCai1,Yang YuanXin2(1.Tianjin Institute of Surveying and Mapping,Tianjin 300041,China;2.Air force Engineering Design & Research Institute,Beijing 100068,China);Discuss the Flow and Data Processing of Settlement Mentioning in Airport[J];Urban Geotechnical Investigation & Surveying;2009-04
5 CHEN Xiao-ming(Suzhou High and New District Survey and Mapping Limited Company in Jiangsu Province,Shuzhou 215011,China);Discussion on Third Order Leveling Connection Surveying in Suzhou High and New District[J];Geomatics & Spatial Information Technology;2010-02
6 REN Jian-fu (The First Academy of Surveying and Mapping of Guangxi,Nanning 530023,China);The Calculation of Leveling Errors Based on Mathematical Model[J];Geomatics & Spatial Information Technology;2012-06
7 WU Dijun;Discussion on the Error Bounds of Trigonometric River-crossing Leveling[J];Geospatial Information;2012-05
8 ZHANG Quan-de1,ZHANG Peng1,CHEN Xian-jun1,ZHANG Lei2(1.National Center of Basic Geo-information,Beijing 100830,China;2.Quality and Testing Center of National Mapping Products,Beijing 100830,China);On the third-time measurement project for national first order leveling network[J];Engineering of Surveying and Mapping;2012-06
9 Tang Hongjun(Xi'an Metro Co.,Ltd.,Xi'an 710018);Establishment and Application of Xi’an Metro Survey Datum and Comments on Metro Survey[J];Urban Rapid Rail Transit;2012-06
10 ;精密水准测量的施测及精度分析[J];Heilongjiang Science and Technology Information;2011-09
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved