Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Science of Surveying and Mapping》 2013-01
Add to Favorite Get Latest Update

Application of grey-time series combined model in subsidence deformation prediction

GAO Ning①②,CUI Xi-min①,GAO Cai-yun②(①College of Geoscience and Surveying Engineering,China University of Mining and Technology,Beijing 100083,China;②Department of Survey & Urban Spatial Information Engineering,Henan University of Urban Construction,Henan Pingdingshan 467044,China)  
Regarding forecasting the subsidence and deformation of modern building as the main research purpose,the paper discussed the features and the scope of application of GM(1,1) model and autoregressive(AR) model,and a combined modeling and forecasting method based on optimized GM model and AR model was proposed to forecast the deformation.According to the monotonously increasing characteristics and the nonlinear characteristics of subsidence deformation time series,the subsidence deformation was decomposed into tendency part and random part,then the tendency part was predicted by the GM(1,1) model,and the random part was predicted by the AR time series forecasting model.Through the experimental results,it finally drew a conclusion that this hybrid method has a higher forecasting precision to the complex problems than the single method.
【Fund】: 国家自然科学基金项目(41071328);; 国家重点基础研究发展规划(973)项目(2007CB209400);; 教育部新世纪优秀人才支持计划资助项目(NECT-07-07098)
【CateGory Index】: TU196
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 5 Hits
1 WANG You-liang①②,TANG Yue-gang①(①China University or Mining and Technology,Beijing 100083,China;②College of information science and engineering Shandong Agricultural University,Taian 271018,China);Curve fitting and GM(1,1) model subsidence forecast and relevant analysis[J];Science of Surveying and Mapping;2008-03
2 Pan Guorong~(1,2)) and Gu Chuan~(1,2))1) Department of Surveying and Geomatics,Tongji University,Shanghai 2000922) Key Laboratory of Modern Engineering Surveying,SBSM,Shanghai 200092;COMBINATION PREDICTION OF DEFORMATION MONITORING DATA[J];Journal of Geodesy and Geodynamics;2006-04
3 LAN Xiao-qi~1,YANG Yong-ping~2,HUANG Qing~3,YAN Hong-ping~1(1.College of Civil Engineering,Hohai University,Nanjing 210098,China;2.North China Institute of Automatic Control Technology,Taiyuan 030006,China;3.Jiangsu Zhongjiang International Real Estate Co.,Nanjing 210008,China);Analysis and prediction of time series for building settlement[J];Journal of Hohai University(Natural Sciences);2006-04
4 Wu Ya Yang Shuzi Tao Jianhua;On Forecasts by Grey Model and Time Series Model[J];;1988-03
5 Sun Yongrong1,2,Hu Yingdong1,Chen Wu2,Lai Jizhou1 (1.College of Automation Engineering,Nanjing University of Aeronautics & Astronautics,Nanjing,210016,China;2.Department of Land Surveying and Geo-informatics,Hong Kong Polytechnic University,Hung Hom,Kowloon,Hong Kong,China);Accurate Estimation of Building Deformation Based on Improved Grey GM(1,1) Model[J];Journal of Nanjing University of Aeronautics & Astronautics;2009-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 LI Shuang-zhu et al(Pingshuo Coal Industry Company,Pingshuo,Shanxi 036006);The Application of Robust Estimation in Forestry Gray Modeling[J];Journal of Anhui Agricultural Sciences;2009-01
2 LIU Sheng-chuan,WANG Lian-jun;Level Surveying and Data Process in the Subsidence Monitoring of Roadbed of Jiaoxin Railway[J];Beijing Surveying and Mapping;2004-02
3 ZHAO Rui1,MA De-ming1,ZHANG Hong-jie1,DENG Li-li1,KANG Xin-liang1,SU Jia-qun2 ( 1、School of Resource and Safety Engineering,China University of Mining&Technology,Beijing,100083;2 Henan Provincial Highway Engineering Bureay CO. LTD Corporation 450052 );Discussion of Slope Monitoring in the Mountainous Area[J];Beijing Surveying and Mapping;2007-03
4 XIA Yuan-ping WU You-ping ZHANG Jing Department of Civil Engineering,Guilin University of Technology,Gulin,Guangxi,541004;Comparison of Tropospheric Delay Corrective Encryption Interpolation Methods[J];Beijing Surveying and Mapping;2007-04
5 JIAO Ming-lian,YE Qiu-qin (School of Geodesy & Geomatics Engineering, Huaihai Institute of Technology, Lianyungang 222001, JiangSu, China);Deformation data processing of buildings based on time series analysis[J];Beijing Surveying and Mapping;2009-01
6 YAO Li-hui,GAO Jing-xiang,WANG Jian (College of environment and spatial informatics of CUMT,Zhaishan,Quanshan District,Xuzhou 221008,China);The Contrast on Different Wavelet Basis Function for Gross Error Detection[J];Beijing Surveying and Mapping;2011-03
7 WANG Jun-de,YANG Guo-qing(ZhengZhou School for Surveying and Mapping,Zhengzhou Henan 450015,China);Application of Time Sery Analysis Model to Predict High Retaining Wall Settlement[J];Beijing Surveying and Mapping;2012-03
8 Zou Jiting (Dean's Office,BUCEA Beijing 100044);Application of the Time Series in the Analysis of the Building Subsidence Monitoring Data[J];Journal of Beijing University of Civil Engineering and Architecture;2009-02
9 FENG Zhong-ke~1;GUO Qing-wen~1;ZHANG Yan-lin~(1,2).1 Institute of GIS,RS & GPS,Beijing Forestry University,100083,P.R.China;2 Gansu Forestry Technological College,Tianshui,741020,P.R.China.;Comparison and analysis of random model of single tree biomass adjustment.[J];Journal of Beijing Forestry University;2005-S2
10 LIU Hong-wen;FENG Zhong-ke;LI Yong.Institute of GIS,RS &GPS,Beijing Forestry University,100083,P.R.China.;Adjustment and analyses of compartment area.[J];Journal of Beijing Forestry University;2005-S2
China Proceedings of conference Full-text Database 4 Hits
1 Ding Ke-liang,OU Ji-kun,Chen yi (1Beijing Institute of Civil Engineering And Architecture, School of Geomatics and urban information, 100044 2 Institute of Geodesy and Geophysics, Chinese Academy of Sciences, Wuhan, 430077 3. Department of Surveying and Geo-Informatics , Tongji University , Shanghai 200092 , China);整体最小二乘法及其在测量数据处理中的应用[A];[C];2009
2 Su Jing-ping (Geological and Engineering Exploration Institute of Suzhou, Suzhou 215129,Jiangsu);The Design Principles of Control Network for Monitoring Deformation[A];[C];2009
3 Li Shulin Sang Yufa (Changsha Inst.of Min.Research Changsha 410012) Zhou Hui Wang Yongjia (Northeast University Shengyang 110006);THE COMBINING MODEL OF GREY AND TIME SERIES ANALYSIS AND IT'S APPLICATION TO STRATA DISPLACEMENT[A];[C];1998
4 Gao Wei,Zheng Yingren (Dept.Civil Engineering,The Institute of Logistical Engineering,Chongqing 400042 China);DISCUSSION OF SOME DISPLACEMENT PREDICTION METHODS IN GEOTECHNICAL ENGINEERING[A];[C];2000
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 LI Bin , ZHU Jian ( School of Geological Engineering and Surveying Engineering , Chang' an University , Xi'an 710054 , China);Application of unequal interval grey model in analysis of settlement data[J];Science of Surveying and Mapping;2007-04
2 LU Yan-hua(Anshan Land Resources and Investigation Design Institute of Liaoning Prov., Anshan 114001,China);Research on forecasting building displacement with GM(1,1) weighted model[J];Journal of Heilongjiang Hydraulic Engineering College;2003-04
3 Cui Xiaodong, Lan Xiaoqi, Zhang Binliang (College of Civil Engineering, Hohai University, Nanjing 210098);Comprehensive Time Series Analyzing for Building Settlement Rule[J];Modern Surveying and Mapping;2004-01
4 ZHANG Ming-yuan~1,FU Li-ming~2,LI Yue~1(1.The Design Institute of Wuhan University of Technology,Wuhan 430070,China;2.Hubei Synthetic Space Building Technology Co.,Ltd,Wuhan 430070,China);An Improved Residual-Modifying GM(1,1) Model for Foundation Settlement Prediction[J];Building Science;2007-11
5 Chen Weiqing(College of Civil and Architectural Engineering,Guangxi University);Application of Deformation Analysis and Prediction Technique of Buildings Settlement[J];Site Investigation Science and Technology;2007-03
6 WANG You-ling 1,SU Dao-wu 2,XU jun 4,QI Jian-guo 1,YAO bing 3,DOU Zhong-shan 5 (1.College of information science and engineering Shandong Agricultural University, Taian 271018 ,China; 2.Donge Water bureau , Donge 252200,China;3.Vocational Institute of Lunan, Tancheng 276100,China; 4.The Taishan construction supervisor consultation Co.of Taian city,Taian 271000,China; 5.Zibo Zhangdian the water conservancy surveys to design room,Zibo 255090,China);OBSERVATION AND ANALYSIS OF THE DEFORMATION OF TAISHAN SANITARY HIGH BUILDING[J];Journal of Shandong Agricultural University;2004-02
7 Sun Yongli;Observation on Settlement of Science and Technique Mansion at Nakai University as well as Analysis on Observation Achievement[J];Railway Investigation and Surveying;2007-02
8 TAN Guan-jun (College of Mechanical and Electrical Engineering, Central South University of Technology, Changsha 410083);The Structure Method and Application of Background Value in Grey System GM(1,1) Model (Ⅰ)[J];SYSTEMS ENGINEERING-THEORY & PRACTICE;2000-04
9 HE Bin\+1, MENG Qing\+2 (1. Mathematics Department, Mengzi Teachers College, Mengzi 661100, China; 2. Physics Department, Mengzi Teachers College, Mengzi 661100, China);Study on Generalization for Grey Forecasting Model[J];Systems Engineering-theory & Practice;2002-09
10 MI Hong-yan;JIANG Xing-hua(Faculty of Land Resource Engineering,Kunming University of Science and Technology,Kunming Yunnan 650093,China);Application of the Grey Model GM(1,1) to Forecast of Building Settlement[J];Journal of Southwest Forestry College;2007-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved