Construction Technology for Manually Excavated Pile under Special Geological Condition

During the manually excavated pile construction in Chongqing benchland area,problems like excessive groundwater,liquid sand layers and thick silt are often met,easily causing inner bore water seepage,sand gushing and difficulty in pore-forming by pile-forming.The pore forming technology for excavated pile under special geological condition in Chongqing is discussed and some feasible construction measures for engineering practice are introduced for reference.