Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Roads Bridges & Flood Control》 2017-12
Add to Favorite Get Latest Update

Study on Risk Evaluation of Urban Riverside Road Construction Based on AHP

Sun Guoshuai;Feng Jiao;Niu Jiyang;  
The urban riverside road engineering project has the characteristics of long construction period,complex construction environment, many engineering participants and large social environment influence,and has more risk factors. Able to effectively carry out the risk evaluation of urban riverside road projects,the risk evaluation index system of riverside road engineering construction period is established from four aspects of schedule risk, quality risk, cost risk and safety risk. The analytic hierarchy process(AHP) is used to carry out the risk evaluation of an engineering project. The result shows that the established evaluation index system and AHP can effectively carry out the risk evaluation of riverside road engineering construction.
【Fund】: 辽宁省教育厅科研基金项目(JW201615406);; 辽宁工业大学教师科研启动基金项目(X201406)
【CateGory Index】: U415.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved