Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Roads Bridges & Flood Control》 2017-12
Add to Favorite Get Latest Update

Study on Construction Technology and Quality Control of Main Pier Block 0# of Cable-stayed Bridge

Huang Dichao;  
Taking the construction of the main pier block 0# of cable-stayed bridges for the great bridge in the Beijie Waterway and the great bridge in Chaolian West River as an example, the article discusses the difficulty of the Block 0# construction technique and the quality control scheme. According to the past construction condition, the article puts forward the relative improvement means. The construction effect is good by the practical cases.
【CateGory Index】: U445.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved