Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Urban Roads Bridges & Flood Control》 2017-12
Add to Favorite Get Latest Update

Elementary Study on Process Control of Pipe-jacking Construction by Slurry Pressure Balanced Method

Ai Zubin;  
With the research and development of construction technology and construction machinery, the pipe-jacking construction technology has been widely used. The pipe-jacking technology can cross the ground buildings, underground pipelines, roads and rivers because of not necessary to excavate the surface course, can save the heavy investment and time and can greatly reduce the harm and influence of traffic,noise and dust on the city areas. The mentioned engineering routes are basically arranged along the motored vehicle lane, non-motored vehicle land and greening belt of the main urban roads and cross many inland rivers(harbors). So the process control of pipe-jacking construction is higher required. Based on various standards, specifications and documents of pipe-jacking construction, and according to the example of electrical civil work project, the article studies the process control of pipe-jacking construction by slurry pressure balanced method.
【CateGory Index】: TU990.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved