《DAM OBSERVATION AND GEOTECHNICAL TESTS》 1998-02
Add to Favorite Get Latest Update

SAFETY MONITORING DESIGN AND INSTRUMENT INSTALLATION IN CONCRETE FACE ROCKFILL DAM OF TIANSHENGQIAO FIRST CASCADE (TSQ-1) HYDROPOWER STATION

Wei Shouson(Kunming Hydroelectric Investigation and Design Institute,650051,Kunming)  
The dam of TSQ-1 hydropower station is the highest concrete face rockfill dam (CFRD) under construction in China.This article briefly describes the dam safety monitoring designs,especially several characteristic items,such as hydrostatic settlement cells and horizontal displacement gauges,which measure the settlements and horizontal displacements in the rockfill,and the longest pipeline ever installed in rockfill dams throughout the world,which is up to 350 m in length.Four stages are described in dam safety monitoring design and implementation,and the work which needs to be done at each stage is also described.Four aspects of work which are needed for full implementation in CFRD of TSQ-1 hydropower station are introduced.
【CateGory Index】: TV698.1
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 CAI Jin-bao, LIU Pei-bin, LI Wu-qin (North China Institute of Water Conservancy & Hydro-electric Power, Zhengzhou 450045, China; Beijing Hydraulic Research Institute, 100044, China; Beijing Soil and Water Conservation Center, 100036, China);Evaluating the seepage safety of earth-rock dams through analyzing monitoring data[J];Beijing Water Resources;2001-03
2 LIU Hong 1,ZHANG Li jun 2 (1.Yangtze River Scientific Research Institute,Wuhan 430010,China; 2.Beijing Investigation and Design Institute,Beijing 100024,China);Safety monitoring during construction period at TGP's Maopingxi Protective Dam[J];JOURNAL OF YANGTZE RIVER SCIENTIFIC RESEARCH INSTITUTE;2000-05
3 CAO Jun, YU Hong jiang, LU De jun (Yangtze River Scientific Research Institute,Wuhan 430010,China);Safety monitoring of seepage prevention and reinforcement engineering for Anhui Province's Changjiang dyke section[J];Journal of Yangtze River Scientific Research Institute;2000-S1
4 ZHANG Jian-ning//Nanjing Hydraulic Research Institute;Properties of two kinds of electrical horizontal displacement gauges[J];Large Dam and Safety;2005-02
5 by YANG Feng-yan//Dahuofang Reservoir Management Bureau of Liaoning Province;Owner's control on modification of Dahuofang reservoir monitoring automation[J];Dam & Safety;2006-03
6 Xie Qinlan (Kunming Hydroelectric Investigation and Design institute. 650051. Kunming);SAFETY MONITORING DESIGN FOR CONCRETE FACE ROCKFILL DAM OF TIANSHENGQIAO 1 (TSQ-1) HYDROELECTRIC POWER STATION AT CONSTRUCTION STAGE[J];DAM OBSERVATION AND GEOTECHNICAL TESTS;1998-06
7 Xue Guiyu,Li Min,He Jinpin(Wuhan University of Hydraulic and Electric Engineering,430072,Wuhan);EMBEDMENT OF CLINOMETERS AND HIGH SLOPE MONITORING AT THREE GORGES PROJECT[J];DAM OBSERVATION AND GEOTECHNICAL TESTS;1999-01
8 Cao Xuewei, Huang Hailing, Zhang Li (Qinghai Hydraulic and Hydroelectric Research Institute, 810001, Xining);PROTOTYPE OBSERVATION DESIGN FOR GOUHOU REBUILT DAM[J];DAM OBSERVATION AND GEOTECHNICAL TESTS;1999-05
9 Liu Yufeng, Wang Xiaochuan (Nanjing Hydraulic Research Institute, Nanjing 210024);SOME KNOWLEDGE OF EARTH ROCKFILL DAM SAFETY MONITORING APPARATUSES[J];DAM OBSERVATION AND GEOTECHNICAL TESTS;2000-05
10 He Yongjun (Hohai University, Nanjing 210098);DESIGN OF AUTOMATIC SAFETY MONITORING SYSTEM FOR LUBUGE DAM[J];Dam Observation and Geotechnical Tests;2000-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved