Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《DAM OBSERVATION AND GEOTECHNICAL TESTS》 1998-02
Add to Favorite Get Latest Update

A RAPID METHOD OF QUALITY CONTROL AND ITS APPLICATION

Guo Qingguo,Ma Hongmei,Sun Weiwei (Northwest Hydroelectric Investigation & Design Research Institute,Ministry of Electric Power,710001,Xi'an) Dai Bing(He'nan Province Water Resources Investigation & Design Institute,450003,Zhengzhou) Xiao Jien,Zhang  
The paper mainly presents the principle and characteristics of a rapid method of construction control developed by Hilf based upon the quality control compaction standard of earth rockfill dam,in combination with compaction requirement of non homogeous and varied soil.Comparative data are illustrated in respect of practicable examples and traditional quality control method.
【CateGory Index】: TV641
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved