Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《DAM OBSERVATION AND GEOTECHNICAL TESTS》 1998-02
Add to Favorite Get Latest Update

ANALYSIS OF DAM FOUNDATION OPERATION AND REINFORCEMENT OF CURTAIN FOR BUTTRESS DAM OF GUTIANXI THIRD CASCADE HYDROPOWER STATION

Xu Shiyuan (Gutianxi Hydroelectric Plant,352258,Gutianxi,Fujian)  
The geological conditions,uplift pressure observation data and water quality conditions of the dam foundation are analysed and studied in the paper for the interpretation of some unusual behaviours in the working process of dam foundation of the Gutianxi third cascade hydropower station.At the same time,the causes of the unusual behaviours are made clear,and the measures to strengthen the grout curtain and their engineering effects are discussed.
【CateGory Index】: TV698.23
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved