Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《JOURNAL OF YANSHAN UNIVERSITY》 2000-01
Add to Favorite Get Latest Update

Applicability - Studies of The Secondary Critical Path Planing in The Construction Optimum Management

Wang Haichao,Yang Guangxi (The Department of Civil Engineering and Mechanics, Yanshan University, Qinhuangdao 066004). (Bohai Aluminium Industary Ltd., Qinhuangdao 066004).  
This article studies about how to look for the noncritical proves in secondary critical path planing about the optimum manage- ment of the double-cord construction network planing provides the calculation on the drawing and the solve of the analysis and makes it convenient for the optimum network planing and management.
【CateGory Index】: TU71
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 1 Hits
1 Yin Zhijun, Chen Liwen, Wang Shuangzheng, Su Chunsheng (School of Management, Hebei University of Technology, Tianjin 300130,China);Study on The Advance of Project Risk Management in China[J];Optimization of Capital Construction;2002-04
【Co-citations】
Chinese Journal Full-text Database 5 Hits
1 Dai Jianguo (Deportment of Management. Jianghan Petroleum institute, Hubei 434102);An Algorithm for Paths with General Length in Network Programming[J];Systems Engineering and Electronics;1994-03
2 WEN Zhen-wei (School of Mathematical Science, Suzhou University, Suzhou 215006, China);An Algorithm for Minimum Vertex Cut Set of Partially Ordered Sets and the Problem of Minimum Cost of Crashed Tasks[J];Operations Research and Management Science;2005-01
3 ZHANG Li-hui,QI Jian-xun(School of Business Management,Worth China Electric Power University,Beijing 102206,China);A Method of Finding the Secondary Critical Path by Total Floats in CPM Network[J];Operations Research and Management Science;2008-04
4 ZHANG Li-hui,QI Jian-xun(School of Business Management,North China Electric Power University,Beijing 102206,China);Properties of Node Slack and Applications in CPM Networks[J];Chinese Journal of Management Science;2008-05
5 ZHANG Li-hui,QI Jian-xun,ZHONG Gang (School of Business Administration,North China Electric Power University,Beijing 102206,China);A Study on the Rule of the New Critical Path in Condition of Critical Activity Being Crashed in CPM Network[J];Chinese Journal of Management Science;2008-S1
China Proceedings of conference Full-text Database 2 Hits
1 Yan Yusong Southwest Jiaotong University Emei 614202;An Recursive Algorithm for General Paths with Path Length no Less Than a Given Number[A];[C];1997
2 ZHANG Li-hui QI Jian-xun ZHONG Gang (School of Business Administration, North China Electric Power University, Beijing 102206,China);A Study on the Rule of the New Critical Path in Condition of Critical Activity Being Crashed in CPM Network[A];[C];2008
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 ZHANG Li~1,ZHOU Jie~2,FAN Jie-qun~1,ZHANG Ai-li~1 (1.Faculty of Civil Engineering,Chongqing University,Chongqing400045,China; 2.Sichuan Institute of Constroction Profession Technology,Chengdu610000,China);TOT financing mode and its risk analysis[J];Building Science Research of Sichuan;2004-02
2 HOU Yong-gang,YANG Cun-jie,LI Ping (Institute of Industrial Process Control,Zhejiang University, Hangzhou 310027,China);Application for network optimization technique in intelligent process mangement system[J];Journal of Anhui University(Natural Sciences);2001-04
3 Pan Wenyan\ \ Du Duanfu (Beijing University of Aeronautics and Astronautics,School of Management);SCHEDULE OPTIMIZING MODEL AND ITS SOLUTION[J];JOURNAL OF BEIJING UNIVERSITY OF AERONAUTICS AND ASTRONAUTICS;1997-03
4 Li Junqi (Dept.of Urban Construction Engineering, Beijing 100044);Study of Large Network Plan Time-cost Optimization[J];Journal of Beijing Institute of Civil Engineering and Architecture;1996-03
5 Li Junqi (Dept. of Urban Construction Engineering, Beijing 100044);Activity-on-node and Multi-dependency Network Plan Time-cost Optimization[J];JOURNAL OF BEIJING INSTITUTE OF CIVIL ENGINEERING AND ARCHITECTURE;1999-02
6 OU Xi-xian, LUO Xun(Beijing Institute of Technology, Beijing 100081);An Analysis of Infrastructure Projects Financing Methods[J];Journal of Beijing Institute of Technology(Social Sciences Edition);2004-02
7 Analysis of Investment Project Xu Qiang,Wang Yun (Economy Department of Nanjing University of Aeronautics and Astronautics,Nanjing 210016)$$$$;Several Questions in the Environmental-economy[J];CHONGQING ENVIRONMENTAL SCIENCE;2000-03
8 LU Hao,WU Huan qun,LUO Yi (Changsha Comm.Univ.,Changsha 410076,China);A Time-cost Optimization Modeling and Program[J];Journal of Changsha Communications University;2001-02
9 YANG Jian hua; XIE Zhen; XI Ying xiang (Traffic Engineering Design Insititute, Changsha Comm. Univ., Changsha 410076, China);Optimum mathematical model and program of PERT time-cost networks[J];JOURNAL OF CHANGSHA COMMUNICATIONS UNIVERSITY;1999-01
10 ;Application of Consfruction Time limit of Cost Optimization Network Plan in Highway Engneering Managemenf[J];NORTHEASTERN HIGHWAY;1996-04
【Secondary References】
Chinese Journal Full-text Database 8 Hits
1 WU Jing,JIA Hong-yan (School of Economics and Management,Harbin Engineering University,Harbin 150001,China);The Research on Item Risk of Combined Heat and Power Generation[J];Commercial Research;2009-05
2 WANG Xu-hong (Department of Manegement,Hunan College of Economic and Finance,Changsha,Hunan 410079,China);Risk Identification and Decision-making Tools Selection for Small and Medium Enterprises' Investment Projects[J];The Theory and Practice of Finance and Economics;2005-03
3 XU ZhiFen YU ShengWei XU Cheng;Studying of the Whole Process Risk Management Mode of Engineering Project[J];Journal of Industrial Engineering and Engineering Management;2005-S1
4 ZHOU Qing-wen (Xi'an Architecture Science & Technologic Uni.,Xi'an 710055);The Study on Risk Management of Engineering Project[J];Optimization of Capital Construction;2006-02
5 ① Xu Zhifen;② Yu Shengwei;① Hao Chenglin (①Institute of Railway the Shijiazhuang,Shijiazhuang 050043,China;②Institute of Vocational and Technolegy the Shijiazhuang,Shijiazhuang 050081,China);Studying of the Whole Process Risk Management Mode of Engineering Project[J];Value Engineering;2006-08
6 TANG Yan-juan WANG Lei LIU Shun-qiang;Actuality and reasons of project risk management of mid and small constructing enterprises[J];Shanxi Architecture;2008-04
7 Wang Xiurong1,Zheng Yingshuo21.Zhangjiakou Qiaoxi Housing Administration Bureau;2.Xuanhua Iron and Steel Group Co.,Ltd.;Security Risk Management in the Process of Construction[J];Journal of Hebei Institute of Architecture and Civil Engineering;2009-01
8 ZhaoPing Economic Management Academy of PanZhiHua University;strengthen risk management of engineering project to enhance management efficiency of enterprise[J];Journal of Panzhihua University;2005-06
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved