Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Electric Engineering》 2018-15
Add to Favorite Get Latest Update

Analysis and Treatment of 25MW Generator Exit Switch Malfunction for Unknown Reasons

WANG Shaopan;ZHU Lizhao;Shanxi Weihe Coal Chemical Group Co.,Ltd.;  
According to the malfunction of 25 MW generator(waste heat utilization)circuit breaker,the failure causes of generator connection were analyzed from different angles based on fault phenomenon and closing control principle diagram,etc.The corresponding improvement measures were proposed to the closing monitor circuit.It is convenient for operators to search and handle faults quickly,so as to ensure the normal operation of the equipment.
【CateGory Index】: TM561
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved