Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Surveying and Mapping of Geology and Mineral Resources》 2006-03
Add to Favorite Get Latest Update

Practice and Experience on RTK Photo Control Survey in Zhuyong Freeway

LUO Yue-jin~1,LU Tu-yong~1,PAN Bao-yu~2,LI Hong-wei~2(1.Zhejiang Brigade of Surveying and Mapping,Hangzhou Zhejiang 310030,China;2.Shandong Institute of Surveying and Mapping of Geology,Jinan Shandong 250011,China)  
Through Application of RTK technology into 1∶2 000 photo control survey in Zhuyong freeway,this paper introduced the solving method of datum transformation parameter and precision check of RTK survey result of the RTK survey in zonal survey area.Its result indicating,the RTK survey not only can satisfy precision requirement of 1∶2 000 photo control survey,and also may enhance in large scale the work efficiency,especially in the traffic and visual difficult area.Similarly,as long as taking the certain measure,RTK survey could get higher precision,even in mountain and high mountain area.
【CateGory Index】: P228.4
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 3 Hits
1 PAN Bao-yu, LI Hong-wei(Institute of Surveying and Mapping of Geology, Jinan 250011, China);Characteristic of RTK and technological key of improving its achievement precision[J];Engineering of Surveying and Mapping;2003-04
2 PAN Bao-yu, FU Wen-xiang,LIU Jun;RTK Photo Control Survey and Its Accuracy Test[J];Bulletin of Surveying and Mapping;2004-08
3 ZHANG Xi-en, FU Wen-xiang, PAN Bao-yu, XU Chuan-xin (Shandong Institute of Surveying and Mapping of Geology. Jinan Shandong 225011, China);Application of RTK Technique into the Survey of Present Land-Use Status Quo[J];Surveying and Mapping of Geology and Mineral Resources;2003-04
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 PAN Bao-yu, LI Hong-wei(Institute of Surveying and Mapping of Geology, Jinan 250011, China);Characteristic of RTK and technological key of improving its achievement precision[J];Engineering of Surveying and Mapping;2003-04
2 FU Wen-xiang1, ZHAN Deng-feng2, PAN Bao-yu1(1. Institute of Svrveying and Mapping of Geology, Jianan 250011, China;2. Beijing AMG C&N System CO., LTD, Beijing 100008, China);Photograph control survey of RTK and its precision examination[J];Engineering of Surveying and Mapping;2004-01
3 GUO Jian-dong,MAO Ai-quan,YIN Zhong(Jiansu Institute of Surveying and Mapping of Geology,Nanjing,Jiangsu 210008,China);RTK Survey and Accuracy Test[J];Science of Surveying and Mapping;2006-03
4 PAN Bao-yu, FU Wen-xiang,LIU Jun;RTK Photo Control Survey and Its Accuracy Test[J];Bulletin of Surveying and Mapping;2004-08
5 ZENG Huai'en HUANG Shengxiang ZHAO Qing YU Zhiqi(School of Geodesy and Geomatics,Wuhan University,129 Luoyu Road,Wuhan 430079,China);APPLICATION OF GPS-RTK TECHNOLOGY IN STAKING-OUT OF STEEL PROTECTIVE CANISTER IN JINGYUE-YANGTZE-RIVER-BRIDGE[J];Journal of Geomatics;2007-04
6 PAN Bao-yu 1; XUN Yong-sheng 2 ( 1. Shandong Institute of Surveying and Mapping of Geology, Jinan, Shandong 250011, China; 2. Jiangsu Institute of Surveying and Mappin of Geology, Nanjing, Jiangsu 210008, China);Probe into Test Allowable Errors of Objective Achievement of Engeering GPS Network[J];SURVEYING AND MAPPING OF GEOLOGY AND MINERAL RESOURCES;2000-01
7 PAN Baoyu, ZHANG Xien, LI Hongwei(Shandong Institute of Surveying and Mapping of Geology, Jinan Shandong 250011, China);Technical Key to Heighten RTK Measuring Achievement Precision[J];Surveying and Mapping of Geology and Mineral Resources;2003-03
8 ZHANG Xi-en, FU Wen-xiang, PAN Bao-yu, XU Chuan-xin (Shandong Institute of Surveying and Mapping of Geology. Jinan Shandong 225011, China);Application of RTK Technique into the Survey of Present Land-Use Status Quo[J];Surveying and Mapping of Geology and Mineral Resources;2003-04
9 SHI Wen-zhi (Comprehensive Prospecting Team, Gansu Provincial Bureau of Coal Geology, Tianshui 741000, China);APPLICATION OF RTK IN SEISMIC EXPLORATION FOR COAL[J];Gansu Geology;2008-01
10 SU Chang-wu~1,WANG Xiu-wen~2,LIU Li~3 (1. No.7 Gold Geological Party of CAPF, Yantai 264004, Shandong, China; 2. The Locality Railway Office of Longkou City, Longkou 265700, Shandong, China; 3. Reconnaissance Surveying and Mapping Institute of Dalian City, Dalian 116021, Liaoning, China);RTK technology in geological exploration and survey[J];Gold Geology;2004-03
China Proceedings of conference Full-text Database 1 Hits
1 LIU Jia ,PAN Bao-yu ( 1 Institute of Surveying and Mapping of geology, Shandong Jinan 250011,China );Characteristic of RTK and Technological Key of Improving Its achievement precision[A];[C];2005
【Secondary Citations】
Chinese Journal Full-text Database 2 Hits
1 XIE Shi-jie 1,XI You-geng 2 (1.Bureau of Surveying and Mapping Under the PLA Headquarters of the General Staff,Beijing100088,China;2.Surveying and Mapping Team,Yangzhou212200,China);Characteristics and Error Analysis of RTK[J];Engineering of Surveying and Mapping;2002-02
2 PAN Bao-yu 1; XUN Yong-sheng 2 ( 1. Shandong Institute of Surveying and Mapping of Geology, Jinan, Shandong 250011, China; 2. Jiangsu Institute of Surveying and Mappin of Geology, Nanjing, Jiangsu 210008, China);Probe into Test Allowable Errors of Objective Achievement of Engeering GPS Network[J];SURVEYING AND MAPPING OF GEOLOGY AND MINERAL RESOURCES;2000-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved