Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Surveying and Mapping of Geology and Mineral Resources》 2006-03
Add to Favorite Get Latest Update

Discuss Convenient Method of Check Line after Laying-out of Building Engineering Pile Position Coordinate

PU Jian-lin~1,WANG Rong-hua~2(1.Yunnan Hengli Co.Ltd.of Foundation Engineering,Yuxi Yunnan 653100,China;2.Surveying and Mapping Team of Chuxiong Prospecting Institute of Yunnan Non-Ferrous Metals Geology,Chuxiong Yunnan 675000,China)  
This paper introduces a kind of the check method for the building pile position after coordinate survey layout.Practice proving,this method has enhancing check speed,reduce the devotion,saving the cost and at same time,can heighten greatly the engineering construction quality.
【CateGory Index】: TU198.2
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 Cai Xiaohua et al.;Discussion on Quality Tests of Foundation Piles by Drilling Method[J];Geotechnical Investigation & Surveying;2005-04
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved