Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Surveying and Mapping of Geology and Mineral Resources》 2006-03
Add to Favorite Get Latest Update

Study of Central Line of Route Survey Based on Free Station Method

HUANG Mei-tian(757 Geological Brigade,Guangdong Bureau of Geology and Prospecting,Jiangmen Guangdong 529040,China)  
Based on the requirement of route engineering,such as road,pipeline,channel,and so on,to survey in pile by pile central line of the route,this paper discussed to calculate the relevant coordinate by odometer of development of piles,and used setting out element obtained by inverse calculation of coordinate,to set up freely station to survey central line of route in pile by pile.
【CateGory Index】: P258
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Co-citations】
Chinese Journal Full-text Database 5 Hits
1 XU Guohui;A Study of EDM Precise Trigonometric Leveling[J];Bulletin of Surveying and Mapping;2002-10
2 XU Guo hui, LIU Yue;Precision Analysis and Comparison of EDM Trigonometric Leveling Methods[J];Bulletin of Surveying and Mapping;2003-03
3 LIU Yue~1,XU Guo-hui~2 (1.Guangzhou Communications Senior Polytechnic School,Guangzhou 510170,China;2.School of Civil Engineering,Guangzhou University,Guangzhou 510006,China);The selection of station position in short distance trigonometric leveling[J];Journal of Guangzhou University(Natural Science Edition);2005-06
4 ZENG Xiao-ming,ZHANG Wen-ji (Civil Engineering and Architectur e Department,Foshan Institute of Science,Foshan528000,China);A study on the detection of bridge deflection with total station theodolite[J];Journal of Heilongjiang Institute of Technology;2003-01
5 ZENG Qiu;Measurement and application of the isomorphous triangle height[J];Shanxi Architecture;2010-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved