Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Journal of Geodesy and Geodynamics》 2009-01
Add to Favorite Get Latest Update

RESEARCH ON METHODS FOR PREDICTING CLOCK ERROR BASED ON DOMECTIC HYDROGEN ATOMIC CLOCK

Zhu Lingfeng,Li Chao,Liu Li,Chen Liucheng and Dong Enqiang(P.O.Box 5136,Beijing100094)  
Grey system model,quadratic polynomial model and simple polynomial model are used for predicting hydrogen atomic clock error made in Shanghai observatory.The calculating results show that the accuracy of predicting clock error of grey system model and simple polynomial model is equal,which exceeds that by quadratic polynomial model.When the time for data sampling is short,the accuracies of predicting clock error by use of grey system model and simple polynomial model exceed quadratic polynomial model obviously.
【Fund】: 武汉大学大地测量与地球空间环境实验室测绘基础研究基金(06-07)
【CateGory Index】: P127.11;N941.5
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【References】
Chinese Journal Full-text Database 2 Hits
1 LIU Yong-yi1,2,DANG Ya-min1,2,ZHENG Zuo-ya1,2(1.Chinese Academy of Surveying and Mapping,Beijing,100830;2.Geomatics College,Shandong University of Science and Technology,Qingdao,Shandong,266510);Study and Improvement for the Model in Satellite Clock Error Long-term Forecast[J];Hydrographic Surveying and Charting;2011-02
2 MA Mao-li,ZHENG Wei-ming,LI Jin-ling,WANG Guang-li (Shanghai Astronomical Observatory,Shanghai 200030,China);Accurate Determination of Impact Epoch and Coordinate of Chang'E-1 Satellite on the Moon[J];Journal of Astronautics;2011-03
【Citations】
Chinese Journal Full-text Database 3 Hits
1 Luan Yuanzhong (Shandong Institute of Mining and Technology,Taian, Shangdong, 271019);The Method of Grey Prediction in Dynamic Adjustment[J];Engineering of Surveying and Mapping;1996-03
2 Li Xican(Hydraulic Engineering Institute of Shandong, Shandong, 271000);Grey Prediction Optimal Model in Dynamic Adjustment[J];ENGINEERING OF SURVEYING AND MAPPING;1999-01
3 CUI Xianqiang 1 JIAO Wenhai 1 (1 Xi’an Research Institute of Surveying and Mapping, 1 Middle Yanta Road, Xi’an 710054, China);Grey System Model for the Satellite Clock Error Predicting[J];Editorial Board of Geomatics and Information Science of Wuhan University;2005-05
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 LU Xiao-feng~1,JIA Xiao-lin~2,CUI Xian-qiang~2(1.Institute of Geo-engineering and Surveying,Changan University,Xian 710054,China;2.Xian Institute of Surveying and Mapping,Xian 710054,China);The optimization method of gray system theory for the satellite clock error short-term predicting[J];Engineering of Surveying and Mapping;2006-06
2 LI Wei,CHENG Pengfei,BI Jinzhong;Application of Grey System Model in Short-time Prediction for Satellite Clock Error[J];Bulletin of Surveying and Mapping;2009-06
3 OUYANG Zi-yuan (1.Institute of Geochemistry, CAS, Guiyang 550002,China; (2.National Astronomical Observatories, CAS, Beijing 100012,China);SCIENTIFIC OBJECTIVES OF CHINESE LUNAR EXPLORATION PROJECT AND DEVELOPMENT STRATEGY[J];Advance in Earth Sciences;2004-03
4 ZHU Ling-feng~(1,2) TANG Bo~2 LI Chao~(1,3) (1.Institute of Surveying and Mapping,Information Engineering University,Zhengzhou,Henan Province 450052;2.PLA Unit 61081,Beijing 100094;3.PLA Unit 96163,Qimen,Anhui Province 245600);Analysis on Performances of the Two Models for Satellite Clock Error Prediction[J];Journal of Spacecraft TT&C Technology;2007-03
5 Dai Wei1,2),Jiao Wenhai3),Li Weipeng4) and Jia Xiaolin3) 1)Institute of Surveying and Mapping,Information Engineering University,Zhengzhou 4500522)Navy Publishing Company,Tianjing 3000003)Xi'an Research Institute of Surveying and Mapping,Xi'an 7100544)95972 Troops,Jiuquan 735018;RESEARCH ON CLOCK ERROR PREDICTION FOR ATOMIC CLOCKS LOADED ON GPS BLOCK IIR(M) SATELLITE CLOCKS[J];Journal of Geodesy and Geodynamics;2009-04
6 XU Weimei LU Xiushan ZHENG Zuoya(Geomatics College,Shandong University of Science and Technology,579 Qianwangang Road,Qingdao 266510,China);PRECISION OF THREE PREDICTION MODELS OF GPS SATELLITE CLOCK BIAS IN PRECISE POINT POSITIONING[J];Journal of Geomatics;2009-05
7 YANG Yan ZHENG Weimin ( Shanghai Astronomical Observatory, Chinese Academy of Sciences, Shanghai 200030; Graduate School of the Chinese Academy of Sciences, Beijing 100049);SOFTWARE REALIZATION METHOD OF EXTRACTING VLBI PHASE CALIBRATION SIGNAL[J];Annals of Shanghai Astronomical Observatory Chinese Academy of Sciences;2006-00
8 QU Wei-jing~(1,2) ZHU Wen-yao~1 SONG Shu-li~1 PING Jin-song 1 Shanghai Astronomical Observatory,Chinese Academy of Sciences,Shanghai 200030 2 Graduate School,Chinese Academy of Sciences,Beijing 100039;The Evaluation of Precision about Hopfield,Saastamoinen and EGNOS Tropospheric Delay Correction Model[J];Acta Astronomica Sinica;2008-01
9 ZHENG Zuo-ya~1 CHEN Yong-qi~2 LU Xiu-shan~1 1 Geomatics College Shandong University of Science and Technology Qingdao 266510 2 Department of Land Surveying and Geo-informaties The Hong Kong Polytechnic University Hong Kong;An Improved Grey Model for the Prediction of Real-Time GPS Satellite Clock Bias[J];Acta Astronomica Sinica;2008-03
10 CUI Xianqiang 1 JIAO Wenhai 1 (1 Xi’an Research Institute of Surveying and Mapping, 1 Middle Yanta Road, Xi’an 710054, China);Grey System Model for the Satellite Clock Error Predicting[J];Editorial Board of Geomatics and Information Science of Wuhan University;2005-05
【Secondary Citations】
Chinese Journal Full-text Database 4 Hits
1 Luan Yuanzhong (Shandong Institute of Mining and Technology,Taian, Shangdong, 271019);The Method of Grey Prediction in Dynamic Adjustment[J];Engineering of Surveying and Mapping;1996-03
2 Li Xican(Hydraulic Engineering Institute of Shandong, Shandong, 271000);Grey Prediction Optimal Model in Dynamic Adjustment[J];ENGINEERING OF SURVEYING AND MAPPING;1999-01
3 Zang Deyan(East China Institute of Geology, Jiangxi, 344000);Application of the Theory of Gray System to Forecast the Dam Subsidence Forecasting[J];ENGINEERING OF SURVEYING AND MAPPING;1999-02
4 Luan Yuanzhong;The grey model forecasting of ground subsidence and deformation in mine area.[J];Site Investigation Science and Technology;1990-05
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved