Full-Text Search:
Home|About CNKI|User Service|中文
Add to Favorite Get Latest Update

Study on development cost control in maturing oilfield

Zhao Wei(Scientific Research Institute of Exploration and Development,Zhongyuan Oilfield Company,SINOPEC,Puyang 457001,China).  
This paper studies on the development cost rising in development later stage from the cost structure angles.The influence factors on development cost are analyzed and the relationship among the development cost,depreciation and depletion is concretely studied.The expression formulas of various depreciation methods are also given.The application range of this method is explained.Using this method,the field cases are analyzed and researched.Finally,this paper puts forward concrete control methods,countermeasures and suggestions aimed at the development cost problems in maturing oilfield,which can play a referential role in oilfield cost control.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved