Full-Text Search:
Home|About CNKI|User Service|中文
Add to Favorite Get Latest Update

A NEW MODEL FOR GENERATOR MAINTENANCE SCHEDULINC OF POWER SYSTEM

Wu Long (Nanjing Automation Research lnstitute. 210003, Nanjing. China)Huang Mnxiang (Zhejiang University, 310027, Hangzhou, China)  
Any algorithm of generator maintenance schedu1e of power system can't possess both optimization of the mathematicaI modeI and validity of the optimal approach in the past. ln order to solve this problem, this paper applies multi-objective mathematics programming theory to generator maintenance scheduling (GMS) of power system. and establishes an up-to-date mathematical model- GMS multi-objective model. Then a heuristic algorithm- Max-Min function,corresponding the GMS multi-objective model. is introduced. At 1ast. the example of Zhejiang province power system and its calculating results are presented.
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
©CNKI All Rights Reserved