Active Dispatch for Interconnected Power System Considering Coordination of Tie Line Power Schedule and Peak Climbing Demand

ZHU Tao1,2, YU Jilai1(1. Harbin Institute of Technology, Harbin 150001, China;2. Yunnan Electric Power Dispatching Center, Kunming 650011, China)  
Close is the correlation between frequency regulation, peak load and tie-line regulation in the interconnected power system. In the process of peak climbing , how to prevent the impact of the interconnected power system support on the tie-line and solve the problem of AGC units lacking capacity is the key problem in the peak active dispatch. This paper builds a model for coordinating optimal dispatching of peak climbing for the interconnected power system. The units relating to tie-line can be procured by an electrical dissection algorithm in the sending and receiving network at the first peak climbing stage. Then the regulating capacities of NON-AGC units in the sending and receiving network are checked and NON-AGC units are divided into two unit groups, the regulating capacity short and regulating capacity abundant group. In the process of peak climbing, firstly, the units relating to tie-line is dispatched so as to maintain the scheduled power of tie-line. Then various units in the sending and receiving network are coordinated at the same time, including the NON-AGC units and AGC units, as well as the regulating capacity short and regulating capacity abundant unit groups. The case analysis demonstrates the feasibility of the model proposed.
【Fund】: 国家自然科学基金资助项目(50477008);; 高等学校博士学科点专项科研基金资助项目(20040213031);; 黑龙江省自然科学基金资助项目(E0326)~~
【CateGory Index】: TM73
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 10 Hits
1 Liu Changyi,L iu Jin,L iu Zhuo Harbin Institute of Technology,Harbin 15 0 0 0 1,China;STUDIESON ENHANCING POWER SYSTEM RESPONSE ABILITY FOR CLIMBING STEEP PEAK LOAD[J];Automation of Electric Power Systems;2002-02
2 YU Ji-lai, LIU Zhuo (Harbin Institute of Technology, Harbin 150001, China);Electrical Dissecting Method of AC Branch Part One Dissection of Ordinary Branch[J];Automation of Electric Power Systems;2005-01
3 XU Tai-shan, XU Jian-bing, BAO Yan-hong, FANG Yung-jie, LI Bi-jun , XUE Yu-sheng, YAN An-he, SUN Han-xiao (Nanjing Automation Research Institute, Nanjing 210003, China) (Henan Electric Power Dispatching and Communication Center, Zhengzhou 450052, China);On-line Pre-decision Based Preventive and Emergency Control System for Interconnected Power Grids[J];Automation of Electric Power Systems;2006-07
4 ZHU Tao~1 YU Jilai~1 LIU Jin~1 LIU Changyi~2 LIU Zhuo~1 (1.Harbin Institute of Technology,Harbin 150001,China; 2.State Grid Corporation of China,Beijing 100031,China);Symplectic Coordination Method Under Peak Load Dispatching[J];Automation of Electric Power Systems;2006-18
5 TANG Yi~(1,2) YU Jilai~1 ZHOU Suquan~1 (1.Harbin Institute of Technology,Harbin 150001,China; 2.Southeast University,Nanjing 210096,China);Electrical Dissection Algorithm of Electric Power Network[J];Automation of Electric Power Systems;2006-22
6 Fan Fu-er (Hunan Electric Power Dispatching and Communication Bureau, Changsha 410007, China);FREQUENCY AND POWER FLOW OF INTERCONNECTED LARGE POWER SYSTEM[J];POWER SYSTEM TECHNOLOGY;2000-06
7 ZHENG Bao-sen, GUO Ri-cai (State Power Grid Corporation of China, Beijing 100031, China);ON DEVELOPMENT OF INTERCONNECTION OF POWER NETWORKS IN CHINA[J];Power System Technology;2003-02
8 LIU Jin1, PAN Yi2 , LIU Chang-yi3, YU Ji-lai1 ( 1.Harbin Institute of Technology, Harbin 150001, Heilongjiang Province, China; 2. China Electric Power Research Institute, Haidian District, Beijing 100085, China; 3. State Grid Corporation of China, Xicheng District, Beijing 100031, China);Coordination Optimal Dispatching in Process of Climbing Peak[J];Proceedings of the CSEE;2006-02
9 WANG Cheng-shan,WANG Xing-gang(Tianjin University,Nankai District,Tianjin 300072,China);Fast Calculation of Probabilistic Total Transfer Capability Considering Static Voltage Stability Constraints and the Uncertainties of Load and Generator Output[J];Proceedings of the CSEE;2006-16
10 ;Investigation and Suggestion on China National Power Grid[J];ELECTRIC POWER;1997-01
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 NIAN Li-qun1,2,LU Zong-qiang3(1.Department of Electrical Engineering and Automation;2.Hefei University of Technology,Hefei 230000,Anhui,China;(3.Chengde Petroleum College,Chengde 067000,Hebei,China);Application of Interior Point Method in Optimization of Coupling Pair Power Flow[J];Journal of Chengde Petroleum College;2009-01
2 YIANG Zhong - yang ( Southwest Normal University, Chongqing 400715, China);Electricity Famine" Beat the Drum of Chinese Economical Development[J];Journal of Chongqing Vocational & Technical Institute;2004-02
3 Tang Yi1 Wan Qiulan1 Yu Jilai2 (1. Southeast University Nanjing 210096 China 2. Harbin Institute of Technology Harbin 150001 China);Congestion Analysis and Control Based on Electrical Dissecting Method[J];Transactions of China Electrotechnical Society;2007-11
4 Wang Xianjla, Li Xiangjlao (Wuhan University of Hydraulic & Electric Engineering, Wuhan 430072, China);THE COOPERATIVE GAME MODEL FOR ELECTRICITY TRANSACTIONIN INTERCONNECTED POWER NETWORK[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-19
5 TANG Yi~1 YU Ji-lai~1 LIU Xian-lin~21.Harbin Institute of Technology,Harbin 150001,China2.Zhengzhou University,Zheng Zhou 450002,China;Electrical Dissecting Method of AC Branch Part Two Dissection of Phase-shifter's Branch[J];Automation of Electric Power Systems;2005-02
6 ZHU Tao~1 YU Jilai~1 LIU Jin~1 LIU Changyi~2 LIU Zhuo~1 (1.Harbin Institute of Technology,Harbin 150001,China; 2.State Grid Corporation of China,Beijing 100031,China);Symplectic Coordination Method Under Peak Load Dispatching[J];Automation of Electric Power Systems;2006-18
7 TANG Yi~(1,2) YU Jilai~1 ZHOU Suquan~1 (1.Harbin Institute of Technology,Harbin 150001,China; 2.Southeast University,Nanjing 210096,China);Electrical Dissection Algorithm of Electric Power Network[J];Automation of Electric Power Systems;2006-22
8 SHAO Junsong, CHEN Xiong, CAO Yizhong, XU Jun, TIAN Yuan, ZHANG Weining, XUAN Xiaoqing, LI Huijun, Li Xueming, JI Chang’an, FANG Yongjie (Nanjing Automation Research Institute, Nanjing 210003, China);UFV-200 Series Security and Stability Control Device[J];Automation of Electric Power Systems;2006-24
9 LIU Jin, CHANG Xiumeng, LIU Zhuo(Harbin Institute of Technology, Harbin 150001, China);Application of Interior Point Method in Optimization of Coupling Pair Power Flow[J];Automation of Electric Power Systems;2007-05
10 SUN Hongbin1, LI Peng2, LI Mao2, ZHANG Boming1, LIU Yingshang2, WU Wenchuan1, LIU Chongru1, LIANG Shouyu2, FENG Yongqing2, YUAN Qihai1(1. State Key Lab of Power Systems, Department of Electrical Engineering, Tsinghua University, Beijing 100084, China)(2. China Southern Power Grid Company, Guangzhou 510623, China);Study and Design of Online Distributed Modeling System for China Southern Power Grid[J];Automation of Electric Power Systems;2007-10
China Proceedings of conference Full-text Database 1 Hits
1 Li Wei, Xu Tais-han , Zheng Liang , Wang Sheng-ming, Yan An-he Sun Han-xiao (Nanjing Automation Research Institute, Nanjing 210003,Jiangsu Province,China; Henan Electric Power Dispatching and Communication Center, Zhengzhou 450052,Henan Province,China);On-line Pre-decision System for Multi-Area Emergency Control[A];[C];2006
【Co-references】
Chinese Journal Full-text Database 10 Hits
1 Wang Chengwen1 Han Yong1 Tan Zhongfu1 Liu Yan1 Yang Lijun2 (1. Institute of Electric Power Economics, North China Electric Power University Beijing 102206 China (2. Beijing Electric Power Design Institute Beijing 100055 China);Dimension-Reduced Semi-Analytical Dynamic Programming Approach for Solving Unit Commitment Problem[J];Transactions of China Electrotechnical Society;2006-05
2 Jiang Yuewen Chen Chong Wen Buying (Fuzhou University Fuzhou 350002 China);Particle Swarm Research of Stochastic Simulation for Unit Commitmen in Wind Farms Integrated Power System[J];Transactions of China Electrotechnical Society;2009-06
3 Shi Libao, Xu Guoyu (Chongqing University, Chongqing 400044. China);SELF-ADAPTIVE EVOLUTIONARY PROGRAMMING AND ITSAPPLICATION TO MULTL-OBJECTIVE OPTIMAL LOAD FLOW Part Two Self-Adaptive Evolutionary Programming Solution of Multi-Objective Optimal Load Flow[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-08
4 Wang Minliang, Zhang Boming, Xia Qing(Tsinghua University, Beijing 100084, China);A NOVEL ECONOMIC DISPATCHING ALGORITHM WITH UNIT RAMP RATE ANDNETWORK SECURITY CONSTRAINTS[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-10
5 Han Xueshan 1, Liu Zhuo 2 (1. Shandong University, Jinan 250062, China) (2. Harbin Institute of Technology, Harbin 150001,China);DECOUPLED ECONOMIC DISPATCH INCLUDING UNIT RAMP RATE AND NETWORK SECURITY CONSTRAINTS[J];Automation of Electric Power Systems;2002-13
6 Ma Rui , Yan Hongwen , He Renmu , Wang Peng , Yang Huanchun (1. Changsha University of Science and Technology, Changsha 410077, China) (2. North China Electric Power University, Beijing 102206, China);RESEARCH ON MULTI-OBJECTIVE OPTIMAL BLOCK BIDDING MODEL FOR ELECTRICITY MARKET[J];Automation of Electric Power Systems;2004-10
7 ZHENG Yan-hai , ZHANG Xiao-bai , QIAN Yu-mei , XU Tian (Nanjing Automation Research Institute, Nanjing 210003, China) (Jiangsu Electric Power Company., Nanjing 210024, China);Hybrid Algorithm for Real-time Security Constrained Dispatch of Power System[J];Automation of Electric Power Systems;2005-12
8 JIN Hua-zheng , CHENG Hao-zhong , YANG Xiao-mei , WANG Xu (Shanghai Jiaotong University, Shanghai 200030, China;Jiangsu Power Company, Nanjing 210024, China);Application of Fuzzy Set Pair Analysis in Multi-objective Transmission Network Planning Considering ATC[J];Automation of Electric Power Systems;2005-21
9 CHEN Zhixu,ZHANG Lizi,SHU Jun(North China Electric Power University,Beijing 102206,China);AC-DC Iterative Methods for Calculating Locational Marginal Price with Losses[J];Automation of Electric Power Systems;2007-11
10 WANG Chao, ZHANG Xiaoming, TANG Maolin, ZHU Qingdai(Sichuan Electric Power Corporation Dispatching Center, Chengdu 610041, China);Real-time Dispatching Optimization Model for Energy-saving and Emission-reduction Generation in Sichuan Grid[J];Automation of Electric Power Systems;2008-04
【Secondary Citations】
Chinese Journal Full-text Database 10 Hits
1 Fang Yongjie; Fan Wentao; Chen Yonghong; Zhu Kun; Sun Guanghui; Xue Yusheng;(Nanjing Automation Research Institute. 210003. Nanjing. China);AN ON-LINE TRANSIENT STABILITY CONTROL SYSTEM OF LARGE POWER SYSTEMS[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;1999-01
2 Wu Zhengqiu Hu'nan University,Changsha41 0 0 82 ,China;CONTRIBUTION FACTOR THEORY ON VARIABLESTO THE NONLINEAR FUNCTION VALUE AND ITSAPPLICATIONS[J];AUTOMATION OF ELECTRIC POWER SYSTEMS;2000-22
3 Li Yang1. Wang Zhihua1. Lu Yi1, Li Junhong2, Zhang Changhu2(1. Southeast University, Naming 210096. China)(2. Naming Power Supply Bureau. Naming 210008, China);TRE IMPLEMENTATION OF PEAK AND VALLEY TIME PRICEFOR ELECTRICITY AND THE RESPONSE OF LARGE INDUSTRIES[J];Automation of Electric Power Systems;2001-08
4 Yu Jilai,L iu Zhuo Harbin Institute of Technology,Harbin15 0 0 0 1,China;LOSSALLOCATION WITH STRICT EQUIVALENCE OF THE NETWORK STATE[J];Automation of Electric Power Systems;2001-21
5 Bao Yanhong1 ,Fang Yongjie1 ,X ue Yusheng1 ,Mou H ong2 , L ei Ming2 ,Cheng Ciyuan2 ,Ma Zhibo2 ,Qin H ua3 ,Zeng Yonggang3 1.Nanjing Autom ation Research Institute,Nanjing2 10 0 0 3,China 2 . Shandong Electric Power Dispatching and Com munication Cent;PRACTICAL CONSIDERATIONSON THE ON-LINE PRE-DECISION EMERGENCY CONTROL SYSTEMS[J];Automation of Electric Power Systems;2001-24
6 Liu Changyi,L iu Jin,L iu Zhuo Harbin Institute of Technology,Harbin 15 0 0 0 1,China;STUDIESON ENHANCING POWER SYSTEM RESPONSE ABILITY FOR CLIMBING STEEP PEAK LOAD[J];Automation of Electric Power Systems;2002-02
7 Xue Yusheng Nanjing Autom ation Research Institute,Nanjing2 10 0 0 3,China;COORDINATIONSOF PREVENTIVE CONTROL AND EMERGENCY CONTROL FOR TRANSIENT STABILITY[J];Automation of Electric Power Systems;2002-04
8 Wang Xing 1, Y. H. Song 1, Lu Qiang 2 (1. Brunel University, Uxbridge, UB8 3PH, UK) (2. Tsinghua University, Beijing 100084, China);LAGRANGIAN RELAXATION BASED MULTI-REGION TRANSMISSION CONGESTION MANAGEMENT[J];Automation of Electric Power Systems;2002-13
9 Han Xueshan 1, Liu Zhuo 2 (1. Shandong University, Jinan 250062, China) (2. Harbin Institute of Technology, Harbin 150001,China);DECOUPLED ECONOMIC DISPATCH INCLUDING UNIT RAMP RATE AND NETWORK SECURITY CONSTRAINTS[J];Automation of Electric Power Systems;2002-13
10 Wu Zhengqiu(Hunan University, Changsha 410082, China);NOTES ON THE REASONABLENESS OF LOSS ALLOCATION[J];Automation of Electric Power Systems;2002-17
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved