Improvement on System Protected 300MW Turbine from Emergency Trip and Practice

ZHOU Wen,WU Jing-jun(Guixi Power Generation Co.,LTD,Guixi 335400,China)  
The problem of 300MW unit ETS in Guixi power plant was studied,the improvement way was proposed and put into effect,it improved the turbine reliability in degree.