Full-Text Search:
Home|Journal Papers|About CNKI|User Service|FAQ|Contact Us|中文
《Underground Engineering and Tunnels》 2008-02
Add to Favorite Get Latest Update

Dynamic Risk Management in Repair of Shanghai Rail Transit Line 4

Guo Liang,Tang Jing  
The article presents the formation,contents and framework of dynamic risk management.Combined with the extra-deep excavation pit for the repairing engineering of Shanghai Rail Transit Line 4,through combination of risk management and project management,measures of dynamic risk management were regulated and applied in the engineering practice.The successful completion of the project proves the effective of dynamic risk management in risk control.
【CateGory Index】: U231.3
Download(CAJ format) Download(PDF format)
CAJViewer7.0 supports all the CNKI file formats; AdobeReader only supports the PDF format.
【Citations】
Chinese Journal Full-text Database 1 Hits
1 YANG Zi-sheng,YANG Jian-zhong,YANG Yi-hui;Study on the Risk Management of the Project of the Foundation Ditch Engineering[J];Sci/tech Information Development & Economy;2004-09
【Co-citations】
Chinese Journal Full-text Database 10 Hits
1 Chen Jun (Huai'an Construction Engineering Consultation Co., Ltd., Huai'an 223002, China);The Application of Risk Management in Deep Foundation Pit Engineering[J];Anhui Architecture;2008-06
2 HUANG Hong-wei , BIAN Yi-hai (Department of Geotechnical Engineering, Tongji University, Shanghai 200092);Risk Management in the Construction of Deep Excavation Engineering[J];;2005-04
3 LI Jun-wei,HUANG Hong-wei(Department of Geotechnical Engineering,Tongji University,Shanghai,200092 P.R.China);Application of Entropy Measurement in Underground Engineering Risk Assessment[J];Chinese Journal of Underground Space and Engineering;2005-06
4 BAI Yun~1,TANG Jing~2(1.Shanghai Urban Construction Group,Shanghai 200023,P.R.China;2.Department of Underground Engineering,Tongji University,Shanghai 200092,P.R.China);Risk Management for Underground Project in Soft Soils[J];Chinese Journal of Underground Space and Engineering;2006-01
5 BIAN Yi-hai~1,HUANG Hong-wei~1,LI Jian~2(1.The Department of Geotechnical Engineering of Tongji University,Shanghai 200092,P.R.China;2.Shanghai Civic Engineering construction and Development Co.Ltd.,Shanghai 200025,P.R.China);Risk Analysis in the Construction stage of Deep Excavation Engineering Based on Dependability Method[J];Chinese Journal of Underground Space and Engineering;2006-01
6 ZHOU Hong-bo~1,HE Xi-xing~1,JIANG Jian-jun~2,CAI Lai-bing~1 (1.Shanghai Jianke Project Management Co.Ltd.,Shanghai 200032,China;2.Sichuan Province C.D.Highway Planning,Survey,Design and Research Institute,Chengdu 610041,China);Risk Identification and Handling in Construction of Metro Shield Tunnel Project[J];Chinese Journal of Underground Space and Engineering;2006-03
7 LI Jian(School of Economics and Management,Shanghai Construction Engineering Administration Co.,Ltd,Shanghai 200031,China);Fuzzy Synthetic Evaluation on Risk of Submerged Floating Tunnel[J];Chinese Journal of Underground Space and Engineering;2008-02
8 WANG Jing1,WANG Peng-fei2,TAN Yue-hu1(1.Engineering Institute of Engineering Corps,PLA University of Science and Technology,Nanjing 210007,China;2.95949 Unit of PLA,Hebei 061022,China);Study on Risk Management of Subway Tunnel Engineering during Construction Process[J];Chinese Journal of Underground Space and Engineering;2009-02
9 DU De-quan, YUAN Zan-liang;The Risk Decision of Real Estate Inverstment Based on Dynamic-fuzzy-overall Evaluation[J];Commercial Research;2003-11
10 Jiao xiuwen; Zhou xiaode;Techno-economic Comparison and Risk Analysis of Two Different Approahes for a Barge Line Service[J];Ship Engineering;1995-04
China Proceedings of conference Full-text Database 5 Hits
1 WU Bingsheng~1,JIANG Jinjun~1,TIAN Zhanwei~2,GUO Zhanglin~1,LI Xin~1 (1.College of Mechanical & Electrical Engineering Hebei University of Engineering,Handan 056038,China;2.College of Mechanical & Electrical Engineering Yanshan University,Qinhuangdao 066004,China);Research and Application of Synthesis Safety Evaluation and Intelligence Decision System on Coal Mine[A];[C];2008
2 ;Discussion on the Role of all Parts involved in the Risk Management of Underground Construction[A];[C];2007
3 HUANG Hong-wei , BIAN Yi-hai (Department of Geotechnical Engineering, Tongji University, Shanghai 200092);Risk Management in the Construction of Deep Excavation Engineering[A];[C];2005
4 LIU Han-ming~1,ZHENG Guang-hui~2,TANG yao~1 (1.Naval Submarine Academy,QingDao 266071,China;2.Naval Engineering University,WuHan 430033,China);Research on the Decision-Making Model of Accident Submariners Rescue Based on Risk Analysis[A];[C];2008
5 ;软土地下工程的风险管理[A];[C];2009
【Secondary Citations】
Chinese Journal Full-text Database 1 Hits
1 ZHONG Jing bing 1 LI Hui qiang 1 WU Jing 1 (1.School of Civil Eng. & Mechanics, HUST, Wuhan 430074 China);FTA Method for Path of Engineer Failure and Risk Source Factor[J];Journal of Wuhan Urban Construction Institute;2003-01
©2006 Tsinghua Tongfang Knowledge Network Technology Co., Ltd.(Beijing)(TTKN) All rights reserved